You are on page 1of 1

HASIL JOIN SURVEY

Concrete 175 K Tempat Chemical Flokulan CGS 5


Photo Actual ( m ) Volume Scoping
SAP No Description Requester Unit/titik Dimensi Total Volume
Sebelum Sesudah P L T (m3) Unit Rate (IDR) Cost (IDR)
1 Balok 5 4.8 0.1 2.40 2.40 3,300,000 7,920,000
Chemical Storage HRY
1 Balok 3.35 0.6 0.25 0.50 0.50 3,300,000 1,658,250

Total 2.90 2.90 3,300,000 9,578,250

Remarks : P = Panjang L= Lebar A= Alas T= tinggi

unit rate 1 m3/day = IDR 3.300.000

Prepared By Review By Approved by Aproved By

# #
QC - EFK TPE - IM MPN PHR -AC PHR -PIC

You might also like