You are on page 1of 1

WeCare Project: Phase-I .

Samples for Testing


Laboratory Test Results Summery as on 25.04.2022
Tests Performed

MDD & OMC

Suspended Particles
93% & 95% 0f MDD,

Organic Content
LL, PL, PI in %

Sieve Analysis (FM*)

(c-

pH
(Sand, Silt, Clay) in %

3-Pt. Soaked CBR

Direct Shear Test


A) SERVICE ROAD PIT SOIL SAMPLES

Max. Swell(%)
GrainSizes

f analysis)
Location
Sample No. Offset, m Depth, m Date of Sampling
(CH). Km

Cl-
SRP-1 107.6 20 L 0.7 ~ 1.0 23/03/2022 3,84,13 54,24,20 1.845, 15.80 1.05,1.90,2.51
SRP-2 112.8 20 R 0.7 ~ 1.0 23/03/2022 14,77,9 34,22,12 1.790,15.50 2.60,4.00,2.12
SRP-3 120.4 20 L 0.7 ~ 1.0 23/03/2022 23,69,8 Non Plastic 1.760,14.50 1.90,4.40,1.81
SRP-4 124.7 17 R 0.7 ~ 1.0 24/03/2022 5,77,18 51,31,20 1.835,16.04 1.50,2.50,2.52
SRP-5 130.4 17 L 0.8 ~ 1.1 24/03/2022 2,82,16 60,30,30 1.839,16.50 1.10,2.00,2.67
SRP-6 136.0 20 R 0.7 ~ 0.9 24/03/2022 9,79,12 33,21,12 1.749,14.50 1.30,2.90,2.36
SRP-7 141.8 19 L 0.7 ~ 1.0 24/03/2022 1,84,15 37,26,11 1.760,15.10 1.30,3.10,2.44
SRP-8 145.9 15 R 0.6 ~ 0.9 24/03/2022 4,82,14 34,22,12 1.181,15.50 1.00,2.60,2.59
SRP-9 148.7 17 L 0.5 ~ 0.8 24/03/2022 12,80,8 34,22,12 1.820,15.80 1.30,2.30,2.60
SRP-10 104.5 20 R 0.5 ~ 0.8 28/03/2022 7,81,12 32,22,10 1.825,16.05 1.50,2.70,2.68

B) BORROW PIT SOIL SAMPLES


Location
Sample No. Ref. Station Offset Depth, m Date of Sampling
(CH).
BP-1 78.0 Goalunda 0.2 Km (L) 0.7 ~ 1.1 28/03/2022 4,79,17 45,27,18 1.840,16.5 0.70, 1.50,2.44
BP-2 78.0 Goalunda 1.0 Km (L) 0.5 ~ 0.8 28/03/2022 14,72,14 39,23,16 1.830,16.02 1.35, 2.20,2.59
BP-3 78.0 Goalunda 1.0 Km (L) 0.5 ~ 0.9 28/03/2022 22,65,13 37,21,16 1.825,16.03 0.75,2.00,2.51
BP-4 95.0 Goalunda 0.2 Km (L) 0.5 ~ 0.8 28/03/2022 45,50,5 Non Plastic 1.760,14.50 2.15, 4.30,1.18
BP-5 95.0 Goalunda 0.25 Km (L) 0.7 ~ 1.1 28/03/2022 14,73,13 31,21,10 1.815,15.50 2.60, 3.60,2.44
BP-6 95.0 Goalunda 0.30 Km (L) 0.5 ~ 0.8 28/03/2022 20,66,14 38,21,17 1.830,15.80 0.85, 1.80,2.59
BP-7 26.0 Jhenaidah 100m (L) 0.7 ~ 1.0 28/03/2022 3,79,18 44,26,18 1.810,15.04 2.00, 3.40,2.04
BP-8 26.0 Jhenaidah 50m (L) 0.6 ~ 0.9 28/03/2022 4,84,12 42,24,18 1.805,15.50 1.20, 2.80,2.51
BP-9 26.1 Jhenaidah 50m (L) 0.5 ~ 0.8 28/03/2022 2,81,17 61,30,31 1.829,16.50 1.20, 1.90,2.75
BP-10 112 Goalunda 1 Km (L) 0.5 ~ 0.8 30/03/2022 5,81,14 33,22,11 1.780,14.50 1.80, 3.70, 1.65
BP-11 112 Goalunda 0.9 Km (L) 0.6 ~ 0.8 30/03/2022 3,80,17 39,24,15 1.821,16.03 1.20, 2.20, 2.59
BP-12 123 Goalunda 4 Km (L) 0.5 ~ 0.8 30/03/2022 3,81,16 53,29,24 1.830,15.50 1.80, 2.05, 2.28
BP-13 123 Goalunda 4 Km (L) 0.6 ~ 0.8 30/03/2022 9,78,13 40,25,15 1.814,15.02 2.00, 3.40, 2.28
BP-14 139 Goalunda 50m (L) 0.5 ~ 0.9 30/03/2022 11,77,12 28,23,5 1.740, 14.00 1.90, 4.20, 1.57
BP-15 139 Goalunda 50m (L) 0.6 ~ 0.9 30/03/2022 9,78,13 31,20,11 1.730, 14.05 2.50, 4.20, 2.20
BP-16 139 Goalunda 100m (L) 0.6 ~ 0.9 30/03/2022 3,82,15 39,25,14 1.829,16.05 1.50, 2.50, 2.51

C) SAND SAMPLES [Chainage of source shown in Km from Jhenaidah]

1) Padma river sand from Dhawaparaghat, Rajbari [ sampled at WAPDA, Magura], Ch. 90; Date 27/03/2022 1.53
2) Padma river sand from C&B Ghat, Faridpur [sampled from WAPDA, Magura], Ch. 86; Date 27/03/2022 1.54
3) Gorai river sand [sampled from WAPDA, Magura], Ch. 37; Date 27/03/2022 1.33
4) Padma river sand from Pakshi source-1 [sampled at Jhenaidah], Ch.70; Date 27/03/2022 1.71
5) Padma river sand from Pakshi source-2 [sampled at Jhenaidah], Ch. 70; Date 27/03/2022 0.90
6) Sylhet sand [sampled at Noapara, Jashore], Ch. 420; Date 29/03/2022 3.07
7) Madhumati river sand, Kalia [sampled at Fultala], Km 75; Date 29/03/2022 0.45 34
8) Panchagarh sand [sampled at Jhenaidah], Km 400; Date 29/03/2022 2.27
9) Gorai river sand near Kushtia, up-stream side (Sampled at Kushtia), Km 65; Date 27/03/2022 0.78
10) Gorai river sand near Kushtia, down-stream side (Sampled at Kushtia), Km 65; Date 27/03/2022 1.63 37
11) Gorai river sand near Kushtia, river bank (Sampled at Kushtia), Km 65; Date 27/03/2022 0.40

D) WATER SAMPLES
1) Water from large pond, Ch. 112 of Jhenaidah-Jashore Road ; Date 29/03/2022 80 15 7.6 30
2) Chitra river water, Ch. 118.4 Km of Jhenaidah-Jashore Road; Date 29/03/2022 36 12 7.5 36
3) Irrigation well water, Ch. 122.3 Km of Jhenaidah-Jashore Road; Date 29/03/2022 12 5 7.4 20

Notes
1) Test piority shall be given to Borrow Pit soil samples
2) A CBR test shall be performed on sand sample (Item C10) at a specified test condition
4) Swell Index values shall be calculated and reported to all soil samples while reporting CBR results
3) Samples after test shall be marked and preserved for about 3 months

You might also like