You are on page 1of 1

AADE-07-NTCE-11 BHA Selection and Drilling Practices to Successfully Drill and Underream difficult Deepwater GOM Salt Section,

a Case History 7

Figure 4: Real-time capture of drilling activities simultaneously transmitted from the rigsite to the office. In addition to
the real-time analysis on the rig, the data are used by engineers in the office to evaluate drilling activities to
further update models and simulations.

You might also like