You are on page 1of 10

FC

SERVICES

B/106 Sector 6-F Near licenses


office, Mehran town, Karachi.

03452462701

servicesflowcontrol@gmail.com
ABOUT US
Flow Control was established to provide support to the balancing activities to various sectors of
the industry.
We offer our services to all sectors.
FCS has gained unique experience in the HVAC field, which has enable a modern and adaptable
approach to its business. FCS has successfully brought about accommodation, specialized
engineering services, for various companies.

Our Strong reputation has been built on the professional and efficient service we provide to all our
clients.
CLIENT LIST
WATER BALNCING
Nabiqasim Industries - PVT. LTD

ICI Pakistan Pharmaceuticals


AIR BALANCING & DOP TEST

PFIZER PAKISTAN LIMITED


B-2S.I.T.E.,Karachi, Pakistan AIR BALANCING & DOP TEST

W.Woodward
Pakistan (Pvt.) Ltd. AIR BALANCING & DOP TEST

CHASE VALUE CENTER


(ALADIN ) AIR BALANCING

BANK ALFALAH HEAD OFFICE


B.A. Building AIR BALANCING
I.I.Chundrigar Road, Karachi.

ARTISRIC FABRIC MILL,


LANDHI, KARACHI. AIR BALANCING

MACTER INTERNATIONAL AIR BALANCING & DOP TEST


LIMITED

KOMPASS PAKISTAN WATER BALNCING


PVT LTD.
CLIENT LIST
THE AGA KHAN
UNIVERSITY HOSPITAL AIR BALANCING
STADIUM ROAD KARACHI.
LIAQUAT NATIONAL
AIR BALANCING & DOP TEST
HOSPITAL STADIUM
DUCTING WORK
ROAD KARACHI

MACDONALD,S AIR BALANCING


RESTAURANT
LE MENDOZ
PHARMACEUTICAL AIR BALANCING & DOP TEST
PVT LTD.
BELTEXO LIMITED
(MIDAS SAFTEY AIR BALANCING
KARACHI
AL NOOR MDF BOARD
DIVISION FACTORY AIR BALANCING & DUCTING WORK
MORO
OBS PAKISTAN
AIR BALANCING
PVT LTD.

CALIFORNIA PIZZA
AIR BALANCING
HYDERABAD

MEDISURE
LABORATORIES AIR BALANCING & DOP TEST
PAKISTAN PVT LTD.

AIR BALANCING & DOP TEST


Martin Dow Pharmaceuticals Ltd
Martin Dow Marker Ltd.
CONTACT INFO
B/106 Sector 6-F Near licenses office,
Mehran town, Karachi.
03452462701
servicesflowcontrol@gmail.Com

MAIN CONTACT
· MR. MUHAMMAD RAYEES (CELL # 0345-2462701)
· MR. ANIS AHMED (CELL # 0342-2505907)

TYPES OF BUSINESS
· HVAC TESTING & BALANCING
· THIRD PARTY VERIFICATION & INSPECTIONS
LIST OF EQUIPMENT

S. No. Equipment Name Qty

1 AIR CAPTURE HOOD 2


2 AIR VELOCITY METER 4
3 PHOTO METER 1
4 DUCT TESTER 1
5 INDOOR AIR QUALITY METER 2
6 MULTI-FUNCTION- METER 2
7 ROTATING VANE ANEMOMETER 3
8 TACHOMETER 2
9 HYDRONIC MANOMETER HM685 1
EQUIPMENT
OUR TEAM
STAFF DETAILS AS FOLLOWS:

Sr. NO. NAME DESCRIPTION AND DETAIL OF STAFF

Mr. Muhammad Rayees B. Tech (Mechanical) Air Balancing, Water


01. Balancing & Maintenance.
(C.E.O)

Mr. Noushad B. Tech (Mechanical) Air Balancing, DOP


02. Test & Maintenance. 20 Years’
(Engineer) Experience
Mr. M. Anis Ahmed DAE (MECHANICAL) Air and Water Balancing
03. and Maintenance. 8 Years’ Experience
(HVAC Engineer)
Mr. Zeeshan MUSTAFA B.E(Chemical)
04.
( Engineer)
Mr. Muneer Ahmed D.A.E (Refrigeration and air-conditioning
05.
( HVAC Engineer) Technology)
Mr. junaid hussain D.A.E (Refrigeration and air-conditioning
06.
(Asst. HVAC Engineer) Technology)
Mr. Muhammad zubair Auto Cad & Mechanical Drafting & Office
07. Work.
( Office work)
HVAC Testing, Adjusting and Balancing

TESTING AND BALANCING INVOLVES THE


ADJUSTMENT AND BALANCING OF HVAC
COMPONENTS TO ENSURE
THAT BOTH THE DESIGN AND SPECIFICATIONS ARE
MET.

OUR TAB TEAM WORK CLOSELY AND IN


CONJUNCTION WITH ALL CONTRACTORS TO
IDENTIFY AND CORRECT ANY PROBLEMS AT THE
INSTALLATION PHASE THAT
MIGHT AFFECT THE TESTING AND
BALANCING.

TESTING AND BALANCING IS NOT ONLY CARRIED OUT ON NEW


INSTALLED.
S YSTEMS. WE RECOMMENDS THAT RE- BALANCING BE CARRIED OUT AFTER
THE FOLLOWING:

WHEN ANY HVAC EQUIPMENT/COMPONENT HAS BEEN REPLACED


IF ANY MAINTENANCE PERSONNEL HAVE ADJUSTED ANY OF THE
CONTROL SETTINGS
AFTER CLEANING OF THE SYSTEM
IF ANY OF THE BUILDING HAS BEEN ALTERED INTERNALLY FOR
DIFFERENT USAGE
TESTING AND BALANCING OF AN EXISTING BUILDING/SYSTEM CAN BE
PERFORMED WHEREVER THERE IS A REASON TO BELIEVE THE SYSTEM IS NOT
FUNCTIONING AS DESIGNED OR RECORDS DO NOT REFLECT THE ACTUAL
SYSTEM OPERATION.
ON COMPLETION OF THE TESTING AND BALANCING, A FULL REPORT IS
PRODUCED PROVIDING A COMPLETE AND ACCURATE RECORD OF THE
INSTALLED EQUIPMENT AND PERFORMANCE TEST SHEETS WHICH ARE
PLACED WITHIN THE OPERATING& MAINTENANCE MANUAL.

FOLLOW ING TEST SHALL BE ACHIEVED AND BALANCED:

• THE BALANCE OF AIR DISTRIBUTION


• ADJUSTMENT OF TOTAL SYSTEM TO PROVIDED SIGN QUANTITIES
• VERIFICATION OF PERFORMANCE OF ALL EQUIPMENT
• SOUND MEASUREMENT AND VIBRATION CHECK

THE ABOVE TESTS SHALL BE A COMPLISHED BY:

• CHECKING INSTALLATIONS FOR CONFORMITY TO DESIGN


• RECORDING AND REPORTING THE RESULTS

A COMPLETE SYSTEM TEST REPORT SHALL BE PROVIDED ON AIR


MOVEMENT SYSTEMS,
INCLUDING FLOW RATES, TEMPERATURES, AND PRESSURES AS FOLLOWS:

• RECORD DATA ON AIR SIDE OF ALL AIR HANDLING UNITS, FANS,


COILS, CONDENSERS, ETC.
DATA SHALL INCLUDE AIR FLOW, MOTOR, STARTER
HEATERS, MANUFACTURER, NAME PLATE DATA.
• BALANCE AIR DISTRIBUTION SYSTEM WITHIN+/-10 PERCENT OF
AIR QUANTITIES AND RECORD ACTUAL READINGS TAKEN.

TEST PROCEDURE
(1) THE TESTING, ADJUSTMENT AND BALANCING OF ALL EQUIPMENT
AND SYSTEM, SHALL BE CARRIED OUT AND TESTING AND
BALANCING
REPORT SHALL BE ISSUED ACCORDING TO GENERAL PROCEDURES
FOR TESTING AND BALANCING FOR

(A) ASHRAE STD., TESTING, ADJUSTING AND BALANCING OF


HEAT, VENTILATION, AIR CONDITIONING AND REFRIGERATION
SYSTEMS.

You might also like