Ch.

14 Subsea Drilling

1
DRILLING FROM A FLOATING
VESSEL

1. Drilling Procedures
2. Well Control
3. Subsea BOP Stacks
4. Major Drilling Components

2
Semi-Submersible
Rig
3
1. OUTLINE OF DRILLING
PROCEDURES
• Positioning the Rig
• Drilling the 36" Hole
• Drilling the 26" Hole
• Drilling the 17 1/2" Hole
• Drilling the 12 1/4" Hole
• Adandonment

4
Subsea
Wellhead

5
Subsea
Wellhead

6
Temporary Guidebase 7
Drilling
36” Hole

8
Running Conductor and PGB
9
Drilling
26” Hole

10
Running 20” Casing and HPWHH
11
Subsea
Wellhead

12
Subsea BOP

13
2. SUMMARY OF MAJOR
DRILLING COMPONENTS
• Subsea Wellheads
• Subsea BOP Stack
• Marine Riser
• Surface Equipment

14