You are on page 1of 170

ZIP-UP HOSPITAL GOWN

A Project Design

Presented to the

Industrial Engineering Department

Cebu Technological University

Argao, Campus

Argao, Cebu

ALVIOLA, ALMA JOY

CENTINO, ALLAN J.

PELOMINO, CHARISSE JEAN D.

TANGPOS, PETER JADE M.

2022
I

APPROVAL SHEET

This Capstone Project entitled “ZIP UP HOSPITAL GOWN” prepared

and submitted by Charisse Jean Pelomino, Allan Centino, Alma Joy Alviola and

Peter Jade Tangpos, in partial fulfillment of the requirements for the degree

Bachelor of Science in Industrial Engineering has been examined and approved

for oral examination.

THESIS ADVISORY COMMITTEE

ENGR. VEVENCIO ALONSO JR.


BSIE, Department Chairperson

ENGR.LIEZ GONZALES
Course Professor Technical Adviser

APPROVED by the Committee on Oral Examination with a grade of:

THE PANEL OF EXAMINER

ENGR. MARY ELLEN C. CAMARILLO


Chairman

ENGR. JECEL T. CARA-AT ENGR. RHEA P. KINTANAR


Member Member

ACCEPTED AND APPPROVED in partial fulfillment of the requirements fort the


degree, BACHELOR OF SCIENCE AND INDUSTRIAL ENGINEERING.

Date of Oral Examination: June 18, 2022

HELMERM. BAṄADOS, Ph.D.


Dean, College of Engineering
II

ABSTRACT

When patients suffered stress and physical constraints during hospitalization and

the recovery phase, positive emotions about clothing were effective in improving their

healing and self-esteem (Khorshid et al., 2019). Mostly of the hospital gowns are opened

at the back of the gown but this will provide discomfort and difficulty of the patient when

changing clothes especially in intravenous injection. People admitted to public hospital

has bigger percentage of people wearing casual dress like t -shirts. To address this

problem, the researchers innovated a product, Zip-up Hospital Gown, that lessens the

discomfort of the patient when changing clothing in admission and confinement in a

hospital. A gown that has an accessible in order for the intravenous injected patients just

slid his or her head when changing clothes.

The target market of the business is the Isidro C Kintanar Memorial Hospital,

located at Bogo, Argao, Cebu. The forecasted demand for the next year of patient is

1,169 patients. The Zip up Hospital Gown takes up to 56.31 minutes from raw materials

to finished product. The required number of production worker in order to meet the

demand per year is 4 which will work for 2 months or 48 days per year depending on the

seasonality of demands.
III

ACKNOWLEDGEMENT

Our deepest gratitude is extended to all those who have help,

supported, and contributed a lot for the success of this study.

Our sincere thanks to our instructor Engineer Liez C. Cabrera-

Gonzales in this subject IE-PC 4117 IE Capstone Project for her

continuous inspiration and encouragement for the researchers’ personal

growth and development. She guides us in making this study successful and

inspires us to make this research possible.

To our Family and friends, who gives us support in terms of

financial needs and for always being there to encourage us whenever we

are about to lose hope and celebrate with us with pride for every success we

accomplished.

To ourselves, who believe in ourselves in order to accomplish the study.

Above all, To our Almighty God, for his infinite love, guidance,

and blessings all throughout this journey. He gives us strength to finish and

gives us intelligence to make this research successful and enlightened our

way in times of hardships and discouragement.


IV

DEDICATION

The accomplishments and success in this subject wouldn’t be

possible without those people who give us motivation to strive hard and

finish this research. This research study is sincerely dedicated to our

beloved and active instructor in this subject IE-PC4117 IE Capstone Project

in the fulfillment of the subject learnings and application of deep

knowledge in the field research and study.

The researchers also dedicate this study to the patients at any

hospital who are still recovering and also to their families.

The researchers also dedicate this study to all the instructors,

faculties and staff of Cebu Technological University Argao Campus

(Industrial Engineering Department) for they contributed in the outcomes

of the study.

This research is also for our parents, friends, and classmates of BSIE-4B

who also made this research possible, our source of inspiration, motivation

and our support system to accomplish this ever challenging yet full of

learnings and knowledgeable subject.


V

TABLE OF CONTENTS

APPROVAL SHEET i
ABSTRACT ii
ACKNOWLEDGEMENT iii
DEDICATION iv
TABLE OF CONTENTS v
LIST OF FIGURES ix
LIST OF TABLES x
INTRODUCTION
CHAPTER I: THE PRODUCT 1
1.1 Features of the Product 1
1.1.1 Velcro Tape 1
1.1.2 Cotton Fabric 2
1.1.3 Plain Colored 2
1.2 Physical Characteristics of the Product 2
1.3 Uses of the Product 2
1.4 Pictorial View of the Product 3
1.4.1 Exploded Drawing 3
1.4.2 Orthographic Drawing 4

1.5 Approximate Weight of the Product 5


1.7 Source of Raw Materials 5
CHAPTER II: PROPOSED OUTPUT PER MONTH 6
2.1 Method of Production 6
2.1.1 Target Output 7
2.2 Assembly Process Chart 8
2.2.1 Product Parts 9
2.3 Network Diagram- Major Activities 13
2.4 Operation Time 13
2.5 Cycle Time 13
2.6 Manufacturing Lead Time 14
2.7 Number of Production Line 15
2.8 Efficiency of the Line 15
2.9 Idle Time of the Line 16
2.10 Design of the Production Line 17
2.11 Number of Workers 17
2.11.1 Recommended Qualifications of Workers 18
2.12 Rate of Workers 20
2.12.1 Methods of Rating the Efficiency of the Worker 24
2.13 Equipment and Tools Needed 25
2.14 Principles of Motion Economy 26
2.14.1 Therbligs 27
2.15 Layout of Production Area 34
VI

CHAPTER III: MATERIAL REQUIREMENT 36


3.1 Product Structure Tree 36
3.2 Specification of Materials 37
3.3 Bill of Materials (BOM) 38
CHAPTER IV: INVENTORY CONTROL 39
4.1 Economic Order Quantity (EOQ) 39
4.2 Safety Stock 42
4.3 Re-ordering Point 44
4.4 Number of Orders per Year 45
4.5 Length of Order Cycle 47
CHAPTER V: UNIT COST AND UNIT PRICE 48
5.1 Cost of Materials 48
5.1.1 Direct Materials Cost 48
5.1.2 Indirect Materials Cost 49
5.2 Cost of Labor 49
5.2.1 Direct Labor Cost 49
5.2.2 Indirect Labor Cost 50
5.3 Overhead Cost 51
5.3.1 Power/ Energy Cost 52
5.3.2 Depreciation Cost 55
5.4 Production Cost 58
5.5 Unit Price 59
5.6 Discussion of the Value of Money 60
CHAPTER VI: INCENTIVE POLICY 61
6.1 Salaries and Wages 61
6. 2 Performance Based Incentives 61
6.3 Employee Recognition 62
6.4 Overtime Pay 62
6.5 Overtime Pay Rates 63
6. 6 Holiday Pay 63
6.7 Regular Holidays 63
6.8 Premium Pay 65
6.9 Special Non-Working Holidays 65
6.10 Special Worked Days 66
6.11 Premium Pay Rates 66
6.12 13th Month Pay 67
6.13.1 Maternity Leave (as amended by RA 11210) 68
6.13.2 Paternity Leave (RA 8187) 69
6.13.2 Solo Parent Leave 70
6.14 How to obtain Solo Parent ID 71
6.15 Sick Leave 71
6.16 Vacation Leave 72
6.17 PAG-IBIG Contribution 72
6.18 Phil Health Benefits (RA 7875, As Amended by RA 9241) 72
VII

6.18.1 National Health Insurance Program 72


6.19 Retirement Pay (Article 287. As amended by RA 7641) 74
6.20 Benefits under the Employees’ Compensation Program (PD 626) 74
6.21 One-half (1/2) Month Pay per Year of Service 76
6.22 Social Security Benefit (RA 1161, as amended by RA 8282) 77
6.22.1 The Social Security Program 77
6.23 Separation Pay 79
CHAPTER VII:QUALITY CONTROL 80
7.1 Attributes of the Product Requiring Control 81
7.2 Variables of the Product Requiring Control 83
7.3 Suggested Practical methods of Controlling Attributes 83
7.4 Suggested Practical methods of Controlling Variables 84
7.5 Inspection Points along the Line 84
7.6 Statistical Method of Controlling Quality 85
7.7 Suggested Tool to Control Attributes 86
7.8 Suggested Tool to Control Variables 86
7.9 Suggested Policy Regarding Rework 86
CHAPTER VIII MATERIAL HANDLING 90
8.1 Principles of Material Handling 90
8.2 Measure Distance in Moving Materials by MHE 93
8.3 Recommended Material Handling Equipment 94
CHAPTER IX: MAINTENANCE FACILITIES 95
9.1 Maintenance of Production Lines 96
9.1.1 Preventive Maintenance 96
9.1.2 Corrective Maintenance 99
9.1.3 Maintenance for Material Handling Equipment 100
9.1.4 Total Preventive Maintenance Checklist 101
9.2 Maintenance for Non-Production Facilities 102
9.2.1 Building 102
9.2.3 Electrical System 104
9.3 Personnel In-Charge of Maintenance Work 106
CHAPTER X SAFETY AND HEALTH 109
10.1 Measures against Occurrences of Accidents in the Plant 109
10.1.1 Electrical Safety 110
10.1.2 Machine Safety 111
10.1.3 Tools Safety 111
10.2 Personal Protective Equipment 112
10.3 Recommended Policies Regarding Health of Worker 115
10.4 Medical and Dental Services 115
CHAPTER XI: PLANT LAYOUT 117
11.1 Space Requirement 117
11.2 Non-Production Functional Area 118
11.3 Space Relationship Diagram 119
11.4 Space Allocation 114
VIII

11.4.1 Area Allocation for Non- Production Functional Area 126


11.4.2 Area Allocation for Production Functional Area 127
11.5 Total Area of the Sections of the Plant 129
11.6 Final Layout 130
11.7 Plant Location 131
11.8 Percentage of Lot Occupancy 132
CHAPTER XII: COST OF DEVELOPMENT 133
12.1 Cost of Lease 133
12.2 Cost of Structure 133
12.3 Cost of Open Space 133
12.4 Cost of Tools and Equipment 133
12.4.1 Workstation tools and Equipment 134
12.4.2 Administrative Area 135
12.4.3 Raw Materials and Finished Product Storage 136
12.4.4 Store / Display Area 136
12.4.5 Locker Area 137
12.4.6 Miscellaneous Supplies 137
12.5 Total Cost of Development 138
CHAPTER XIII ORGANIZATIONAL STRUCTURE OF THE PLANT 139
13.1 Organizational Structure 139
13.2 Functions of Organizational Positions 140
13.2.1 General Manager 140
13.2.2 Shopkeeper 140
13.2.3 Tailors or Seamstress 140
CHAPTER XIV: CONSCLUSION AND RECOMMENDATION 141
14.1 Conclusion 141
14.2 Recommendation 141
APPENDICES 146
CURRICULUMN VITAE 149

LIST OF FIGURES
Figure 1 Assembly Drawing of the Product 3
Figure 2 Exploded Drawing of the Product 3
Figure 3 Back View of the Product 4
IX

Figure 4 Front View 4


Figure 5 Side View 5
Figure 6 Process Flow 8
Figure 7. Network Diagram ofZip-upHospital Gown 13
Figure 8 Lay-out of the Production Line 17
Figure 9 Lay-out of the Production Area 35
Figure 10 Product Tree 37
Figure 11 Inspection Process Flow Chart 85
Figure 12 Qualification of Personnel in Charge of Quality Control 87
Figure 13 Transport Equipment 94
Figure 14 Storage of Raw Materials and Finished Product 94
Figure15 Closeness Relationships in Auxiliary Area 121
Figure 16 Dimensionless Block Diagram for Auxiliary Area 122
Figure 17 Activity Relationships in Administrative Area 122
Figure 18 Dimensionless Block Diagram for Administrative Area 123
Figure 19 Activity Relationships in Production Area 124
Figure 20 Dimensionless Block Diagram for Production Area 125
Figure 21 Plant Layout 130
Figure 22 Plant Location 131
Figure 23 Organizational Chart 140

LIST OF TABLES
Table 1.1 Sources of the Materials 5
Table 2.1 Description of the Major Process Operations 9
Table 2.2 Process Symbol 10
Table 2.3 Precedence table 11
X

Table 2.4 Manufacturing Lead Time 15


Table 2. 5 Recommended Qualification of Workers 18
Table 2.6 The Minimum Wage Rates in Central Visayas 20
Table 2.7 Salary of Workers According to Positions 22
Table 2.8 Machines, Tools and Equipment Needed 25
Table 2.9 Therbligs Symbols 27
Table 2.10 Therbligs of the Processes 28
Table 3.1 Specification of Materials 37
Table 3.2 Bill of Materials 38
Table 4.1 Economic Order Quantity 41
Table 4.2 Safety Stock 43
Table 4.3 Re-ordering Point 44
Table 4.4 Number of Orders per Year 46
Table 4.5 Length of Order Cycle 47
Table 5.1 Direct Materials Cost 48
Table 5.2 Indirect Material Cost 49
Table 5.3 Direct Labor Cost 50
Table 5.4 Indirect Labor Cost 51
Table 5.5 Energy / Power Costs 52
Table 5.6 Utilities Expense 54
Table 5.7 Depreciation Cost for Tools, Machineries and Equipment 56
Table 5.8 Furniture and Fixtures 57
Table 5.9 Office Tools and Equipment 58
Table 5.11 Summary of Costs 58
Table 7.1 Guidelines of Attributes of Product 81
Table 8.1 Distance in Moving Materials 93
Table 9.1 Maintenance of Tools and Equipment 97
Table 9.2 Maintenance Card 98
Table 9.3 Corrective Maintenance Card 99
10
Table 9.5 Maintenance for Material Handling Equipment 0
10
Table 9.6 Total Preventive Maintenance Checklist 1
10
Table 9.8 Building Maintenance Card 3
XI

10
Table 9.9 Electrical System Maintenance Card 5
10
Table 9.10 Summary of Schedules for Preventive Maintenance 7
11
Table 10.1 Personal Protective Equipment 2
12
Table 11.1 Closeness Codes 0
12
Table 11.2 Degree of Closeness for Auxiliary Area 1
12
Table 11.3 Degree of Closeness in Administrative Area 3
12
Table 11.4 Degree of Closeness in Production Area 4
12
Table 11.5 Area Allocation for Display Area 6
12
Table 11.6 Area Allocation for Administrative Office 6
12
Table 11.7 Area Allocation for Production Area 7
12
Table 11.8 Area Allocation for Storage Room (R.M.) 8
12
Table 11.9 Area Allocation for Storage Room (F.G.) 8
12
Table 11.10 Summary of Space Allocation Per Area 9
13
Table 12.1 Cost of Machine, Tools and Equipment 4
13
Table 12.2 Cost of Office Tools and Equipment 5
13
Table 12.3 Cost of Raw materials and Finished Product Storage 6
13
Table 12.4 Cost of Furnitures and Fixtures in Store / Display Area 6
Table 12.5 Cost of Furniture in Locker Area 13
XII

7
13
Table 12.6 Cost of Office Supplies 7
IE –PC 4117 IE CAPSTONE PROJECT 1

Chapter I

THE PRODUCT

Hospital gowns are the sanitary clothing worn by patients. It is designed to be

simple, easy to launder, and cheap with high durability to longer its span of usage. There

are variety of hospital gowns available in the market but Zip Up Hospital Gown is unique

and is not common to use.

The product is designed to help the wearer to be comfortable while changing their

clothes without worrying for their health condition. The existing problem in changing

clothes of the patients led the developer of the product to come up with the idea of having

hospital gown as a solution for that problem. The feature of the product is simple yet can

eradicate discomfort in changing IVF and it provides faster change of clothing that would

attract its potential customers.

1.1 Features of the Product

Zip Up Hospital Gown offers the following features:

Velcro Tape

This product has Velcro tape on each side of the shirt that makes it easier to

change clothes without compromising the present health condition of the patient that

allows two parts of the garment to come completely apart. The Velcro tape makes the

gown collapsible from left and right side


IE –PC 4117 IE CAPSTONE PROJECT 2

Cotton Fabric

It uses cotton fabric which provides the wearer with comfort and is a

hypoallergenic, weather-proof, has the ability to control moisture, and is a durable type of

fabric.

Plain Colored

It utilizes plain colored design which is very pleasant to the eyes and gives a cool

and calm feeling.

1.2 Physical Characteristic of the Product

The Zip Up Hospital Gown is an innovated gown that has a length of 40 inches,

30 inches width, 10 inches length of the sleeve, 29 inches bust size,7 inches neck

circumference, 1 meter length and ½ inches width of tie which is made of cotton fabric. It

has Velcro tapes on each side of the shirt that makes iteasier to change clothes. The

design is just plain color so that it will not be irritating to the eyes of the beholder.

1.3 Uses of the Product

The Zip Up Hospital Gown is designed to support patients and their caregivers to

experience a convenient andcomfortable way in changing the patient’s clothes without

the need of removing the attachments from the patient’s body like the dextrose. Most

patients find it hard to change their clothes every time they want to which leads them to

not change their clothes at all until there is a nurse that could assist them in handling the

dextrose connected to the patient’s body. This product will provide comfort.
IE –PC 4117 IE CAPSTONE PROJECT 3

1.4 Pictorial view of the Product

Figure 1 Assembly Drawing of the Product

1.4.1 Exploded Drawing

Figure 2 Exploded Drawing of the Product


IE –PC 4117 IE CAPSTONE PROJECT 4

1.4.2 Orthographic Drawing

Orthographic Projection is a way of drawing a 3D object from different

directions. It normally has three accurate views of a product, a front view, a side view,

and top view.

The proponents also produce orthographic drawings so that prototypes can be

manufactured, and then tested ensuring the manufacturer can make the product to the

precise size and requirements. This leads to improvements being made to the product.

Below are the necessary views required in manufacturing the product. A parts list

which includes all the information to make each part of the product.

Figure 3 Back View of the Product

Figure 4 Front View


IE –PC 4117 IE CAPSTONE PROJECT 5

Figure 5 Side View

1.5 Approximate Weight of the Product

Cotton fabric makes up to the most part of the product. The approximate weight

of the product is 500 grams.

1.7 Sources of Raw Materials The table below shows the sources of materials.

Table 1.1
Sources of the Materials

Materials Name of Supplier Location Supply Capacity

Cotton Fabric Wholesale retail TondoMetro Byorder

(Shopee) Manila
Velcro Tape Clay_mates29 Las Pinas City, Byorder
Metro Manila
Thread Threadsand F. RamosSt. Cebu Byorder

Needles Clothing city


Paper Bag Local supermarket ArgaoCebu Byorder
IE –PC 4117 IE CAPSTONE PROJECT 6

Chapter II

PROPOSED OUTPUT PER MONTH

Every company has its own method and strategy for producing its goods. This

procedure is important for the product's long-term viability as well as the process'

efficiency and efficacy. This will assist the company in achieving its objectives.

This chapter will discuss the aspects to be considered in effectively producing the

product. This consists the method of production, assembly process chart and the process

flow in producing the product. The efficiency of the production is also discussed in this

chapter. This is supported by aspects that greatly affects the production- operation time,

cycle time, manufacturing lead time, number of production lines, efficiency of the line,

idle time of the line, design of the production line as well as the number of workers

needed in the production.

Manpower must be given importance for they are the one who made the product

possible. This chapter will discuss the job description and specification according to its

designated position.

2.1 Method of Production

In order to produce the intended product, the Zippy tend will use

batch type production method. Since Zippy tend sets out an ideal number of

outputs daily in order to achieve the target demand of the year creating a smaller

group of products which can be considered as batches.


IE –PC 4117 IE CAPSTONE PROJECT 7

2.1.1 Target Output

The company is able produce on daily basis in 2-month production time ideal

output of 25 units. The production line capacity per day is 32 units of Zip-up Hospital

Gown.

annual demand
ideal daily output=
working days
1169units
ideal daily output=
48 days
ideal daily output=24.35∨25 units per day

There is a total of 7.5 hours per day in a normal operation time of production

excluding 15 minutes break time for the workers during morning and 15 minutes break in

the afternoon. A total of to 30 minutes break in a day, the actual operation time per day is

7.5 hours or equivalent to 450 minutes.

Solution:
The calculation below is for the production capacity.
IE –PC 4117 IE CAPSTONE PROJECT 8

2.2 Assembly Process Chart

The assembly process chart or operation chart is a graphical and symbolic

representation of the manufacturing operations used to produce a product. It shows how

the raw materials transform into finished product. It also serves as a tool to examine the

process in detail to identify areas of possible improvements.

Figure 6 Process Flow


IE –PC 4117 IE CAPSTONE PROJECT 9

2.2.1 Product Parts

Cotton Fabric. The main material in the Zip up hospital gown which is also commonly

used in hospital gowns.

Velcro Tape: The Velcro tape is a hook-and-loop fastener, is used to fasten two items or

sides together. It's usually sold in a roll of tape form but can also be found in strips.

Usually, one side goes on a wall if it's an adhesive type.

Thread: A long, thin strand of cotton, nylon, or other fibers used in sewing or weaving.

Table 2.1

Description of the Major Process Operations

OPERATION DESCRIPTION

Material Preparation Preparing the main materials early in the


worktime. Removing dust or dirt that
might be in the fabric.
Measuring and pattern making Process of tracing the precut pattern for the
gown which will soon be cut.
Cutting Cutting the fabric into pieces to be
assembled pr sewed.
Assembling and Stitching/ Sewing Using the high-speed sewing machine,
materials that are cut will be put together
by thread.
Checking, Storing and Ironing Checking for defects and storing it for
delivery. Ironing will be optional.
IE –PC 4117 IE CAPSTONE PROJECT 10

Table 2.2
Process Symbol

SYMBOL NAME PURPOSE

OPERATION Add value

STORAGE Warehouse

TRANSPORT Move distance

DELAY Temporary delay or hold

INSPECTION Check for defects


IE –PC 4117 IE CAPSTONE PROJECT 11

Table 2.3

Precedence table
IE –PC 4117 IE CAPSTONE PROJECT 12

OVERALL TASK TIME


IE –PC 4117 IE CAPSTONE PROJECT 13

2.3 Network Diagram- Major Activities

Figure 7. Network Diagram ofZip-upHospital Gown

The time study shows that, Process A, is for the Material preparations, which

allotted into 1.33 minutes, then the process B is the measuring and pattern making which

is 3.60 minutes. Process C, is the cutting the fabric into parts in 2.57 minutes. Then the

stitching and sewing is depicted above as process D which has the biggest allotted time of

48.3 minutes and lastly, Process E which is quality checking and storing for delivery in

0.48 minutes elapsed.

2.4 Operation Time

Operating time is calculated through technical norms. It is a period during

ensure the rapid growth of labor productivity and to make product under normal

operating time.

2.5 Cycle Time

It is the total time from start to its final process. It includes process time during

which a unit is acted upon to bring it closer to an output, and delay time during which a

unit of work is spent waiting to take the next action.


IE –PC 4117 IE CAPSTONE PROJECT 14

Theformulabelowisusedtoobtainthe cycletime

production time per day


Cycle time =
required output per day (¿ units)
450 mins x 60 sec
Cycle time =
25 units
27 , 000
¿
25
Cycle time =1,080 secs or 18 mins
2.6 Manufacturing Lead Time
It is the time period between the placement of an order and the shipment of the

completed order to the customer. It includes the order preparation, queue time, set- up

time, run time, inspection time and put- away time. A short manufacturing lead time is a

competitive advantage. Many customers want the delivery of their products as soon as

possible following the placement of the order.

Set-up Time (ST) A period for preparing device, machines and process for it to be ready

to function or accept a job.

Operation Time (OT) The standard time to produce one unit or referred as workstation

time.

Queue Time (QT) It refers to the time a processed item or part waits before it is move to

the next workstation.

Move time (MT) It is the time when part of an item is transferred from one workstation

to the other workstation.


IE –PC 4117 IE CAPSTONE PROJECT 15

Inspection Time (IT) It is time for quality checking which involves examination,

measurement, testing and comparison of the materials in items.

FORMULA:

Manufacturing Lead Time =Σ(ST+OT+QT+MT+IT)

Table 2.4
Manufacturing Lead Time
Variable of the Lead time Lead Time (minutes)
Operation Time 54.5
Set up time 1.33
Move Time 0
Queue Time 0
Inspection Time 0.48
Total Time 56.31

2.7 Number of Production Line

The number of production line or the workstations is calculated to make the ideal

output of 25 units per day and 150 units per week. This can be obtained through the

following.

overall task time


number of workstations=
cycle time

56.31mins
number of workstations=
18 mins

number of workers/ workstations= 3.13 or 4 workers/ stations

2.8 Efficiency of the Line


IE –PC 4117 IE CAPSTONE PROJECT 16

The efficiency of the line can be computed by dividing the operation time by the number

of workstation and cycle time.

overall task time


efficiency =
actual no . of workstation x cycletime
56.31
efficiency =
4 x 18
Efficiency= 0.78 or 78 %

2.9 Idle Time of the Line

Idle time is defined as unproductive time that occurs when work is halted for any

reason or when operation time is not fully utilized. The idle time of the line can be

computed using the formula below.

idle time=100 %−efficiency percentage

idle time=100 %−78 %

idle time=22 %

Therefore, an efficiency of 78 percent indicates an idle time of 22 percent across

the entire line.


IE –PC 4117 IE CAPSTONE PROJECT 17

2.10 Design of the Production Line

Figure 8 Lay-out of the Production Line

2.11 Number of Workers

Workers has significant part in the business since they give the necessary

personnel. It’s critical to hire the right people with the right skills and abilities for the job

needed by the business.


IE –PC 4117 IE CAPSTONE PROJECT 18

overall task time


Number of workers=
Cycle time

56.31minutes
=
18 minutes

= 3.13 or 4 production workers per station

2.11.1 Recommended Qualification of Workers


Table 2. 5
Recommended Qualification of Workers
POSITION JOB DESCRIPTION JOB
QUALIFICATION
GeneralManag -In charge of monitoring a business -Must have a degree
er segment’s day-to-day operations as well relating to Business
as other business activities like supply Management,
distribution. Master’s in Business
-They set operational policies, create Administration and
budgets, and manage personnel. Industrial
-Guarantees that all of their employees Engineering
complete their jobs on time. -Has a good
-Could be the owner. knowledge of
- Hiring appropriate skills for the different business
company functions and
-oversee the quality of the product operations.
-Knows how to
communicate well
- 25 years old and
above
-Male or female
IE –PC 4117 IE CAPSTONE PROJECT 19

-Loyal
Shopkeeper -Ensures that the store is kept clean and -20 and above years
organized. of age
-Keeps a record of sales and restocks the -Male or female
store accordingly. -At least High
-Mediate any confrontation between staffs School graduate
and clients. -Must be organized,
able to clean the
-Keep the shop open for orders and other
workplace, well-
possible transactions for the whole year
presented, and
-Notify the general manager for orders punctual
and purchases -Prior experience in
-Entertain people at any kind interested in retail
the product -Can use MS word
and excel
-Know how to use
cellphone and
telephone
-Hardworking
-Loyal

Tailors -Alters or repair, construct, and labels


or customers’ garments -MaleorFemale
Seamstre -At least20yearsold
-
ss -At
Cleanworkarea,machinesandequipmentaft
(Skilledworker leasthighschoolgradu
eruse.
s) ate
-Musthaveexperience
in tailoring or
dressmaking
-Hardworking
-Loyal
IE –PC 4117 IE CAPSTONE PROJECT 20
IE –PC 4117 IE CAPSTONE PROJECT 21

2.12 Rate of Workers


Table 2.6
The Minimum Wage Rates in Central Visayas

AGRICULTURE & NON-AGRICULTURE WITH


NON-AGRICULTURE
LESS THAN 10 WORKERS
GEOGRAPHICAL
AREA NEW NEW
PER WAGE PER WAGE
MINIMUM MINIMUM
WOVII-22 INCREASE WOVII-22 INCREASE
WAGE WAGE

CLASS A

Cities of Carcar, Cebu,


Danao, Lapulapu,
Mandaue, Naga, Talisay
& Municipalities of ₱404.00 ₱31.00 ₱435.00 ₱394.00 ₱31.00 ₱425.00
Compostela,
Consolacion, Cordova,
Liloan, Minglanilla, San
Fernando or Expanded
Metro Cebu

CLASS B ₱366.00 ₱31.00 ₱397.00 ₱361.00 ₱31.00 ₱392.00


Other Cities Not
Covered Under Class A
– Bais, Bayawan, Bogo,
IE –PC 4117 IE CAPSTONE PROJECT 22

Canlaon, Dumaguete,
Guihulngan, Tagbilaran,
Tanjay, Toledo

CLASS C
Other Municipalities Not
₱356.00 ₱31.00 ₱387.00 ₱351.00 ₱31.00 ₱382.00
Covered Under Class A
and Class B

 
a/ Covers the cities of Carcar, Cebu, Danao, Lapulapu, Mandaue, Naga, Talisay and Municipalities of Compostela, Consolacion,

Cordova, Liloan, Minglanilla, San Fernando, or Expanded Metro Cebu, Toledo, Bogo, and the rest of Municipalities in Cebu

Province, Tagbilaran City and all municipalities in Bohol Province & Negros Oriental Province, Municipalities in Siquijor Province &

Municipalities in Bantayan and Camotes.

b/ Grants the following:

 ₱31 per day basic wage increase for workers in Non-Agriculture, Agriculture, and Non-Agriculture with less than ten (10)

workers.

 
IE –PC 4117 IE CAPSTONE PROJECT 23

The table above shows the minimum wages in different Geographical Areas.

Based on the Wage Order No. ROVII “Providing for Increase in the Minimum Wage

Rates in Central Visayas” mandated by Regional Tripartite Wages and Productivity

Board VII.

Table 2.7
Salary of Workers According to Positions
Position Head Count Daily wage (Php) Monthly wage
(Php)
General Manager 1 500 12, 000

Shopkeeper 1 425 10,200

Tailors or 4 425 10, 200


Seamstress

There are also set of rules of payment for regular, special holidays and non-

working days that shall be applied and followed. The following are the set of Holidays

mandated by the Department of Labor and Employment (DOLE).

Regular Holidays:

New Year‟s Day Movable Date


Maundy Thursday April 9
Good Friday May 1
Araw ng Kagitingan Independence Day
Labor Day National Heroes Day
January 1 Bonifacio Day
Movable Date Christmas Day
IE –PC 4117 IE CAPSTONE PROJECT 24

Rizal Day November 30


June 12 December 25
Last Monday of August December 30

Special Holiday:
Chinese New Year Movable Date

EDSA People Power Revolution February 25

Black Saturday Movable Day

Ninoy Aquino Day August 21

All Saints Day November 1

a. If the employees did not work, he/ she shall be paid 100% of his or her salary for that

day.

b. For work done during the regular holiday, the employee shall be paid 200% of his or

her regular salary for that day for the first eight hours.

c. If the employee works for more than eight hours (overtime work), he or she shall be

paid an additional 30% of his or her hourly rate on the said day.

d. For work done during the regular holiday that also falls on his or her rest day, he or she

shall be paid an additional 30% of his or her daily rate of 200%.

e. If the employee works more than eight hours (overtime work) during a regular holiday

that also falls on his or her rest day, he or she shall be paid an additional 30% of his or

her hourly rate on the said day.


IE –PC 4117 IE CAPSTONE PROJECT 25

Special (Non- working) Holidays

a. If there are employees did not work, the “no work, no pay” principle shall apply unless

there is a favorable company policy practice or collective bargaining agreement.

b. For work done during the special day, he or she shall be paid on additional 30% of his

or her daily rate on the first eight hours of work.

c. For work done in excess of eight hours (overtime work), he or she shall be paid an

additional 30% of his or her hourly rate on the said day.

d. For work done during a special day that also falls on his or her rest day, he or she shall

be paid an additional 50% of his or her daily rate on the first eight hours of work.

e. For work done in excess of eight hours (overtime work) during a special day that also

falls on his or her rest day, he or she shall be paid an additional 30% of his or her rate on

the said day.

2.12.1 Methods of Rating the Efficiency of the Worker

It is vital to have a suitable approach to evaluate worker efficiency in order to sustain

good worker performance. The basis of measuring the worker’s efficiency in generating

the native placement is good quality, cleanliness, and effectiveness in fulfilling the

needed output.

The most crucial of all of these needs is to provide high-quality product, as this will

improve the company’s competitiveness. It is critical to assess worker effectiveness so

that we can identify individuals with high outputs and those who require additional
IE –PC 4117 IE CAPSTONE PROJECT 26

training and has issues with the methods used, as well as the materials and equipment

used.

Formula used:

Total Wage=( Standard Rate x Incentive Percentage ) + Standard Rate

2.13 Equipment and Tools Needed


A tool is any tangible item that can be utilized to attain a goal. Equipment is a

collection of tools, devices, and equipment put together for a certain purpose.

The tools and equipment required for the production are listed below:
Table 2.8
Machines, Tools and Equipment Needed
Tools and Equipment Quantity Description Cost/Product Total
(Php) Cost
(Php)
Scissors

Primarily used for


4 cutting out patterns 175.00 700.00
in the fabric.

Sewing Pins and Pin


Cushion Sewing pins are
used to hold the
16 fabric together 124.00 1,984.00
prior to sewing.
Pin cushion is used
to hold or store
pins or needles
Juki Highspeed
SewingmachineDDL-
8700 A machine used to
stitch the fabric
4 and other pliable 20,000.00 80,000.00
IE –PC 4117 IE CAPSTONE PROJECT 27

materials together
with threads.

Sewing machine needles 4 Used to puncture 220 880


the fabric

Tape measure
Used primarily for
taking body
measurement, as
well as drafting
4 patterns, 10.00 40.00
measuring fabric,
specifying the
length of a
garment, and much
more
Razor Blades
Helps to pull the
two layers of
40 fabric away from 2.8 112.00
each other as you
are ripping with
these fabric
Total 83,716.00

2.14 Principles of Motion Economy


The principle of motion economy is a series of guidelines that recommends ways

to enhance manual labor in manufacturing by reducing worker fatigue and unnecessary

motions, which can lead to a reduction in work-related trauma.


IE –PC 4117 IE CAPSTONE PROJECT 28

2.14.1 Therbligs
Therbligs is a mechanism that analyzes the motions involved in carrying out a

task. Identification of specific movements and moments of delay in the process was

intended to identify unnecessary or inefficient motions and even split-seconds of wasted

time can be utilized or eliminated.

Table 2.9
Therbligs Symbols
Therbligs Symbol Therbligs Symbol
Reach RE Select SE
Move M Position P
Grasp G Inspect I

Release RL Plan PL

Pre-Position PP Unavoidable Delay UD

Use U Avoidable Delay AD

Assemble A Rest to Overcome R


Fatigue

Disassemble DA Hold H

Search S

This section provides a brief description of the motions or movements in which

the production operation makes use of both left and right hands. Furthermore, it indicates

whether or not the worker is effective at his job. The series of motions and activities of
IE –PC 4117 IE CAPSTONE PROJECT 29

the left and right hand with corresponding time and space symbols derived from therbligs

are shown in the table below.

Table 2. 10

Therbligs of the Processes

ZIP UP HOSPITAL GOWN


RIGHT HAND LEFT HAND

TIME DESCIPTION SYMBOL SYMBOL DESCRIPTION TIME


(mins) (mins)
MATERIAL PREPARATION
GETTING RE R RELAX 0.83
0.83 THE
MATERIALS G R

M R

RL R

0.50 FREEING G H HOLD


FROM DUST
H H

I H

RL H
S H

MEASURING AND PATTERN MAKING


1.20 Tracing the UD UD HOLD 1.20
front panel G H
pattern with
chalk. U H
RL H
1.20 Tracing the PP H HOLD 1.20
back panel
pattern with G H
chalk U H
RL H
IE –PC 4117 IE CAPSTONE PROJECT 30

0.60 Tracing the UD UD HOLD 0.60


sleeves with RE H
chalk.
PP PP

G H
U H
RL H
0.60 CHECK AND UD UD Check and 0.60
MEASURE G G measure
AGAIN again
H H
I I
RL RL

CUTTING
1.02 CUTTING UD H HOLD 1.02
THE PRE- U H
MEASURED
M H
FRONT
PANELS OF PP H
THE SHIRT
G H
H H
RL H
0.10 SET ASIDE RE R RELAX 0.10
G R
H R
RL R
0.19 CUTTING UD UD HOLD 0.19
THE RIGHT U H
AND LEFT
M H
SLEEVE
PP H

G H
H H
RL H
0.10 SET ASIDE RE R RELAX 0.10
G R
H R
RL R
IE –PC 4117 IE CAPSTONE PROJECT 31

1.00 CUTTING 2M UD UD HOLD 1.00


X 1 INCH RE RE
FOR TIE U H
RL RL
0.16 MOVE TO G G MOVE TO 0.16
THE THE
H H
MACHINE MACHINE
UD UD
M M
RL RL
ASSEMBLING AND STITCHING/SEWING
6.14 MAKING UD G HOLD 6.14
EDGING
G H
U RL
PP RE

M PP

H G
PP H

G RL
U RE
PP PP

RE G
PP H

H RL
RL PP

U RE
G G
H H
H RL
U PP

RL G
U H
PP RL

G PP
IE –PC 4117 IE CAPSTONE PROJECT 32

H H
RE U
RL H
G
H
RL
0.10 HOLD H G SET ASIDE 0.10
H H
H RE
RL RL
2.35 FOLDING G G FOLDING 2.35
AND AND SEWING
H PP
SEWING THE THE SLEEVE
SLEEVE I G CUFFS.
CUFFS
H H
U I
RE H
H H
PP H

G PP

H G
RE H
U RE
U H
0.10 SET ASIDE RE RE SET ASIDE 0.10
G G
H H
RL RL
4.17 ATTACH THE PL PL ATTACH THE 4.17
FRONT AND FRONT AND
PP PP
BACK BACK PANELS
PANELS U H
H G
U H
I I
PP H
IE –PC 4117 IE CAPSTONE PROJECT 33

G H
RL H
U PP

PP H

U H
H PP

I H
U PP

PP I

RE RL
U
I
0.10 SET ASIDE RE RE SET ASIDE 0.10
G G
H H
RL RL
10.05 ATTACH THE A I ATTACH THE 10.05
LEFT AND I H LEFT AND
RIGHT RIGHT
U H
SLEEVES, SLEEVES,
SEW RE H SEW
U H
H H
RE I
U UD
U
I
UD
0.58 ATTACH 2M G G ATTACH 2M 0.58
X 1 INCH TIE X 1 INCH TIE
H H
BELOW THE BELOW THE
ARM IN U I ARM IN
BOTH SIDES. I UD BOTH SIDES.
RE
U
UD
13.56 SEW VELCRO PP H SEW VELCRO 13.56
IE –PC 4117 IE CAPSTONE PROJECT 34

TAPE IN PL H TAPE IN
RIGHT AND RIGHT AND
U H
LEFT SIDE OF LEFT SIDE OF
THE SHIRT. U H THE SHIRT
U PP

I U
PP H

U H
PP I

PL PP

I H
PP H

RE PP

U RL
PP UD

H
PP

11.18 FACING AND PL PL FACING AND 11.18


CUTTING CUTTING
U U
EXCESS EXCESS
THREAD. I I THREAD.
H H
PL PL
RE H
A M
U G
M H
G U
U A
U H
A PP

H H
PP RL
U
RL
IE –PC 4117 IE CAPSTONE PROJECT 35

CHECKING AND STORING


0.48 CHECKING G G CHECKING 0.48
THE VELCRO THE VELCRO
I I
OR DEFECTS OR DEFECTS
RL RL

2.15 Layout of Production Area

It is intended for the proper sequence and arrangement of the facilities and

equipment used in the production area, such as tools, furniture, and fixtures. The facilities

are designed to assist the business in meeting its production requirements. This allows for

faster process mobility while maintaining an acceptable space between workstations.

Figure 9 depicts the layout design used in Zip Up Hospital Gown manufacture.

Figure9 Lay-out of the Production Area


IE –PC 4117 IE CAPSTONE PROJECT 36

Chapter III
Material Requirement
Materials are critical requirements in the production of the product. These

materials are critical in the transformation of raw materials into finished goods or

products. Its quantity and quality will undoubtedly reflect the finished product’s quality.

Material requirement is a means of specifying the quantity and quality of raw materials

required in manufacturing the product.

Materials needed considers the availability of materials for manufacturing as well

as other associated parameters. It is a type of planning that focuses on process

management in manufacturing industries. Material requirement techniques are used to

deconstruct bills of materials, compute net material requirements, and plan future

production.

3.1 Product Structure Tree

Product structure tree shows the hierarchal presentation of the materials that the

Zip up Hospital Gown is composed of. The strategic scheme is expected to directly

pursue the company’s goals of ensuring material availability for daily operations, client

accessibility from suppliers, maintaining the lowest material and product stages in the

shop, and planning production, material delivery schedules, and procurement activities

accordingly.
IE –PC 4117 IE CAPSTONE PROJECT 37

Figure 10 Product Tree

3.2 Specification of Materials

The table below shows the bill of raw materials needed in the production.

Table 3.1

Specification of Materials

CODE PARTICULARS MATERIALS SPECIFICATION

CF Cloth/fabric 100% Cotton Fabric


V Hook and loop fastener Velcro Tape
T Thread Apple Polyester thread
PB Packaging Material Paper Bag

The table above presents the different specification of each material to be used in

the production of Zip Up Hospital Gown and these should be followed to produce that

specific product.
IE –PC 4117 IE CAPSTONE PROJECT 38

3.3 Bill of Materials

The table belowillustrates the materials needed to produce with its corresponding

expenses.

Table 3.2

CODE MATERIALS QUANTITY MATERIAL QUANTITYUSED/ COST PER UNIT


ON
PURCHASE PRICE UNIT

CF Cotton fabric 1 roll (54.86 ₱3,700 1.2 meters by 2.49 ₱ 80.93


meters length meters
and 2.49
meters width)
VT 1” Velcro Tape (25 ₱318 2 meters ₱25.44
m) 25 meters

T Apple Polyester ₱480 20.8 meters ₱9.98


Thread 1000
metersin 1
piece
PB Paper Bag 100 pieces ₱75 1 piece ₱0.75

TOTAL ₱117.1

Bill of Materials
IE –PC 4117 IE CAPSTONE PROJECT 39

Chapter IV

INVENTORY CONTROL

Inventory is a type of asset that is meant to be sold in the normal course of business.

Inventory control is the process of having the proper number of parts and products on

hand in order to minimize shortages, overstocks, and other costly issues. It focuses on

reducing the quantity of slow-selling products purchased by a corporation while

increasing the number of high-selling products purchased. They avoid committing

valuable storage space to those products, which reduces carrying costs and makes way for

faster-selling products.

4.1 Economic Order Quantity

Economic order quantity is an equation for inventory that determines the ideal

order quantity a company should purchase for its inventory gives a set cost of production,

demand rate and other variables. This is done to minimize variable inventory cost, and

the formula takes into account storage, or holding cost, ordering cost and shortage cost.

The full equation is as follows:


IE –PC 4117 IE CAPSTONE PROJECT 40

 Where: A = Annual cost (units)


O = ordering cost per unit

C = carrying cost

Sample computation for Head:

 For Quantity per Year (A):

A= (per unit X units per year x weeks)

A = pcs.

 For Ordering Cost (O):

The cost for the transportation in ordering the product is PHP

Standard Local shipping= Php 152.00

 For Carrying Cost C:

C = 20% of the Buying Cost

C= (0.20x)

C = Php

 For annual usage of materials used

quantity used per unit (Zip−up annual demand)


Quantity of material per year =
material quantity on purchasing

Solve for EOQ:


IE –PC 4117 IE CAPSTONE PROJECT 41

Table 4.1

Economic Order Quantity


ECONOMIC ORDER QUANTITY (EOQ)

CODE MATERIALS QUANTITY UNIT ORDERING UNIT CARRYIN EOQ


OF COST COST G COST
MATERIAL (Php) (Php) (20%)
PER YEAR

CF COTTON 25.57 Rolls 157 ₱ 3,700 740 3.29


FABRIC

VT VELCRO 93.52 Rolls 157 ₱ 318 63.6 21.49


TAPE

T THREAD 24.32 Pieces 157 ₱480 96 8.91

PB PAPER BAG 11.69 Bundle 157 ₱ 75 15 15.64


IE –PC 4117 IE CAPSTONE PROJECT 42

4.2 Safety Stock

Safety Stock is an additional quantity of an item held in inventory in order to reduce the

risk that the item will be out of stock. And acts as a buffer in case the sales of an item are

greater than planned and/or the supplier is unable to deliver additional units at the

expected time. In order to produce for safety stock, since there is no past data, the

maximum capacity of the production,32 units per day, will be used as the maximum daily

use and the ideal output of the production, 25 units per day will be used as the average

daily use.The following formula will be used with average and maximum lead time of 6

days.

Safetystocks=( Maximum daily use∗maximum lead time∈days )−( average daily use∗average lead time∈ da

Sample computation:

32 units(quantity used per unit )


Maximum usage rate per week=
material quantity on purchasing

25 units (quantity used per unit)


Average usage rate per week=
material quantity on purchasing
IE –PC 4117 IE CAPSTONE PROJECT 43

Table 4.2

Safety Stock

SAFETY STOCKS

CODE MATERIALS MAXIMUM AVERAGE UNITS LEAD TIME SAFETY STOCK


USAGE DAILY USAGE DAILY (days)

CF COTTON 0.70 0.55 Rolls 6 0.89


FABRIC

VT VELCRO TAPE 2.56 2 Rolls 6 3.36

T THREAD 0.67 0.52 Pieces 6 0.90

PB PAPER BAG 0.32 0.25 Bundle 6 0.42


IE –PC 4117 IE CAPSTONE PROJECT 44

4.3 Re-ordering Point

The reordering level or point (ROP) is the inventory level at which a company would

place a new order or start a new manufacturing run. The proponents used 1 week or 6

working days as lead time when ordering items. When a business is holding a safety

stock to act as a buffer if daily usage accelerates the reorder level, the formula in finding

the ROP is:

ROP=( Lead time x Average Usage Daily ) + safety stocks

Table 4.3

Re-ordering Point
RE-ORDERING POINT

CODE MATERIALS AVERAGE LEAD SAFETY ROP


USAGE TIME (day) STOCK
DAILY
CF COTTON 0.55 6 0.89 4.19
FABRIC
VT VELCRO 2 6 3.36 15.36
TAPE
T THREAD 0.52 6 0.90 4.02

PB PACKAGING 0.25 6 0.42 1.92


BAG
IE –PC 4117 IE CAPSTONE PROJECT 45

4.4 Number of Order per Year

The reordering level or point (ROP) is the inventory level at which a company

would place a new order or start a new manufacturing run. When a business is holding a

safety stock to act as a buffer if daily usage accelerates the reorder level, the formula in

finding the ROP with an annual demand of 1,169 is:

material used per unit (annual demand )


Quantity of materials per year =
material quantity on purchasing

Quantity of materials per year


Number of Orders per Year=
EOQ
IE –PC 4117 IE CAPSTONE PROJECT 46

Table 4.4
Number of Orders per Year

NUMBER OF ORDER PER YEAR

CODE MATERIALS QUANTITY OF UNIT EOQ NUMBER OF


MATERIALS ORDER/ YEAR
PER YEAR
CF COTTON 25.57 Rolls 3.29 8
FABRIC

VT VELCRO 93.52 Rolls 21.49 5

TAPE

T THREAD 24.32 Pieces 8.91 3

PB PACKAGING 11.69 Bundle 15.64 1


BAG
IE –PC 4117 IE CAPSTONE PROJECT 47

4.5 Length of Order Cycle


The Length of Order Cycle is the duration between orders. The formula in finding

the length of order cycle is as follows:

Length of Order Cycle= ( Quantity of materials per year )


Economic Order Quantity
x working days

Table 4.5

Length of Order Cycle

LENGTH OF ORDER CYCLE

CODE MATERIALS EOQ QUANTITY NUMBER LENGTH OF


OF OF ORDER
MATERIAL WORKING CYCLE
S YEAR DAYS (days)
CF COTTON 3.29 25.57 48 7

FABRIC

VT VELCRO TAPE 21.49 93.52 48 11

T THREAD 8.91 24.32 48 18

PB PACKAGING 15.64 11.69 48 65


BAG
IE –PC 4117 IE CAPSTONE PROJECT 48

Chapter V

UNIT COST AND UNIT PRICE

5.1 Cost of Materials

Simply expressed, materials costs are the costs of direct materials used in

theproductionofaproductor the deliveryofaservice. Raw material costs anddirectmaterial

costs are two phrases that describe the cost of basic materials in a product or

service.Overheadlaborandproductionexpensesarenotthesameasmaterialcosts.

5.1.1 Direct Materials Cost

Direct Materials are the primary materials utilized in manufacturing. Cotton fabric is the

primary material used in the creation of Zip Up Hospital Gown.

Table 5.1

Direct Materials Cost

CODE MATERIALS COST PER UNIT OF ZIP

UP HOSPITAL GOWN

CF Cotton Fabric Php80.93

V Velcro Tape Php 25.44

T Thread Php 9.98

Total Php116.35
IE –PC 4117 IE CAPSTONE PROJECT 49

5.1.2 Indirect Materials Cost

These materials are usually purchase in bulk.

Table 5.2

Indirect Material Cost

CODE MATERIALS COST PER UNIT OF ZIP

UP HOSPITAL GOWN

PB Paper Bag Php 0.75

Total Php 0.75

5.2 Cost of Labor

Cost of labor indicatesthe overall cost of the employee's wages as well as the

employer'sbenefits.

5.2.1 Direct Labor Cost

Is labor involved directly in the manufacturing of the product.

Thefollowingwageiscalculatedbasedonthenon-agricultural first-class municipality on

DOLE National Wages and ProductivityCommission.


IE –PC 4117 IE CAPSTONE PROJECT 50

Table 5.3

Direct Labor Cost

DIRECT NUMBER OF TOTAL DAILY MONTHLY COST PER


LABOR WORKER WAGE (PHP) SALARY UNIT (PHP)
(PHP)
Tailors or
Seamstress 4 425 40, 800 68.00
(skilled
workers)

Total Direct Labor Cost per Unit Php 68.00

Php 40 , 800.00
Direct Labor Cost per Day=
24 days

= Php1,700 per day

Php 1,700
Direct Labor Cost per Unit=
25 units

= Php68 per units

5.2.2 Indirect Labor Cost

These are workers whose role is not directly involved in making the product, but which is

required in order to make business possible. Indirect labor is composed of administrative

personnel and other employees.


IE –PC 4117 IE CAPSTONE PROJECT 51

Table 5.4

Indirect Labor Cost

LABOR NUMBER OF TOTAL MONTHLY COST PER


WORKER DAILY SALARY UNIT (PHP)
DIRECT WAGE (PHP) (PHP)
General
Manager 1 500 12,000 20.00

Shop keeper
1 425 10,200 17.00

Total Indirect Labor Cost per Unit Php37.00

Php22,200
Indirect Labor Cost per Day=
24 days

=Php925.00 per day

Php 925
Indirect Labor Cost per Unit=
25 units

= Php37 cost per unit

5.3 Overhead Cost

Overhead costs are all income statement costs except direct labor, direct

supplies,anddirectexpenditures.Overheadcosts,alsoreferredtoas overheador

operatingexpenses, are those expenses associated with running a company that cannot be

related toproducing or manufacturing a product or a service. They are the expenses the

businessincurstostayinbusiness,regardlessofitssuccesslevel.
IE –PC 4117 IE CAPSTONE PROJECT 52

5.3.1 Power/ Energy Cost

Energy cost is the expense in curred in the assembly that gives an additional expense in the general cost of the product being

made.

Table 5.5

Energy / Power Costs

Tools / Quantity Wattage Operating Power Rate Daily Monthly Energy Cost Yearly Energy Cost
Equipment Hours (Php/kWh) Energy Cost
(KW)

T8 LED Tube 14 0.008 8 12 10.752 258.048 3,096.576

Juki Sewing 4 0.3 8 12 115.2 2,764.80 33,177.60


Machine

Table Lamps 4 0.040 8 12 15.36 368.64 4,423.68

Fingerprint 1 0.002 8 12 0.192 4.608 55.296


Time Clock

Telephone 1 0.003 8 12 0.288 6.912 82.944

Computer Set 1 0.25 8 12 24 576.00 6,912.00


IE –PC 4117 IE CAPSTONE PROJECT 53

Printer 1 0.04 8 12 3.84 92.16 1,105.92

Internet 1 0.006 8 12 0.576 13.824 165.888


Router

Electrical 4 0.045 8 12 17.28 414.72 4,976.64


Stand Fan

Water 1 0.074 8 12 1.184 28.416 340.992


Dispenser

TOTAL ENERGY COST 188.672 4,528.128 54,337.536


IE –PC 4117 IE CAPSTONE PROJECT 54

Daily Energy Cost


Energy Cost per Unit =
Units per Day

= Php 7.36 per unit

Table 5.6

Water expense
WATERCOMSUMPTIONANDEXPENSE

CONSUMPTION CHARGES(PHP) CU/ TOTALCOST(P


M HP)
First10cubicmeters 48.7 10 487

11 to20 15 0 0
cubicmeters

21 to30 17.65 0 0
cubicmeters

31cubicmeterandab 48.4 0 0
ove

WaterExpensePerMonth Php 487.00

Table 5.7

Utilities Expense

UTILITIES Cost per Month (Php) Cost per Year (Php)

Water 487.00 5,844.00

Internet 1,699.00 20,388.00


IE –PC 4117 IE CAPSTONE PROJECT 55

Total 2,186.00 26,232.00

Monthly Cost
UtilitiesCost per Day=
24 Days

= Php 91.08

Php 91.08
UtilitiesCost per Unit=
25 units

Utilities Cost per Unit = Php3.64 per unit

Table 5.8

Rent Expense

Monthly Rent Expense Units Per day Daily Rent Expense

Php 10, 000 25 416.67

Total Cost Per Unit 16.67

5.3.2 Depreciation Cost

Straight line method is used in calculating the depreciation of the machineries and

equipment, furniture’s and fixtures, office equipment and the Personal Protective

Equipment (PPE). It is assumed that the salvage value of equipment is zero (0).

Total Daily Depreciation Cost


DepreciationCost per Unit =
Total Output per Day
IE –PC 4117 IE CAPSTONE PROJECT 56

Table 5.9
Depreciation Cost for Tools, Machineries and Equipment
Particular Total Price Life Depreciation Depreciation Daily Depreciation
(Php) Span per Year per Month Depreciation Cost per Unit
(years) Cost (Php) (Php)

Scissors 175.00 2 87.50 7.29 0.24 0.0097

Sewing Pins
and Pin 124.00 1.5 82.67 6.89 0.23 0.0092
Cushion
Juki
Highspee
d
Sewingmachi 20,000 9.89 2,022.00 168.50 5.62 0.22
neDDL-8700
Tape 10.00 3 3.33 0.2775 0.0093 0.00037
measure
TOTAL 0.24

Depreciation Cost for Tools, and Equipment = Php 0.24 per unit
IE –PC 4117 IE CAPSTONE PROJECT 57

Table 5.10
Depreciation Cost for Furniture and Fixtures
Particular Total Price Life Depreciation Depreciation Daily Depreciation
(Php) Span per Year per Month Depreciation Cost per
(years Cost (Php) Unit (Php)
Fingerprint 1,554.00 5 310.80 25.90 0.86 0.034
Time Clock
Table 120.00 3 40.00 3.33 0.11 0.004
Lamps
Electrical 1,550.00 3 516.67 43.06 1.44 0.058
Stand Fan
Water 3,001.00 5 600.20 50.02 1.67 0.067
Dispenser
Trash Can 550.00 3 183.33 15.28 0.51 0.02

Office 5,439.00 10 543.90 45.33 1.51 0.06


Table
Locker 9,500.00 10 950.00 79.17 2.64 0.106
Cabinets
360-degree 827.00 5 165.40 13.78 0.46 0.018
Adjustable
Chair
Office 827.00 10 82.70 6.89 0.23 0.009
Chair
Filing 7,875.00 10 787.50 65.63 2.19 0.088
Cabinet
Wooden 5,500 10 550.00 45.83 1.53 0.061
Cabinet
Reception 23,000.00 10 2,300.00 191.67 6.39 0.26
Desk
Cash 8,219.24 5 1,643.85 136.99 4.57 0.18
Register
Stainless 2,662.00 5 532.40 44.37 1.48 0.059
Steel
Display
Rack
TOTAL 1.03
IE –PC 4117 IE CAPSTONE PROJECT 58

Table 5.11
Office Tools and Equipment
Particular Total Price Life Depreciation Depreciation Daily Depreciation
(Php) Span per Year per Month Depreciation Cost per
Cost (Php) Unit (Php)
PLDT
Prepaid 2,778.10 5 555.62 46.30 1.54 0.0616
Landline
Computer 10,449.0 5 2,089.80 174.15 5.81 0.2324
Set 0
Printer 9,152.49 5 1,830.50 152.54 5.080 0.2032

TOTAL 0.50

5.4 Production Cost

In computing the unit cost, all costs incurred in the production of the product per

unit should be determined. The table below shows the summary of costs incurred in the

production of Zip Up Hospital Gown per units.

Table 5.12

Summary of Costs

Particulars Cost per Unit Mark Up Price


(Php) (Php)
Direct Materials 116.35
Direct Labor 68
Factory Overhead
Indirect Materials 0.75
Indirect Labor 37
IE –PC 4117 IE CAPSTONE PROJECT 59

Energy Cost 7.36


Utilities Expense 3.64
Depreciation of Tools and Equipment 0.24
Depreciation of Office Tools and Equipment 0.50
Depreciation of Furnitures and Fixtures 1.03
Rent Expense 16.67
Total Production Cost 251.54
Mark Up Price (15%) 37.73

5.5 Unit Price

The overall cost of the product’s materials and ingredients is referred to as the

product price or the unit price. However, when determining the product pricing, the

company wishes to favor potential markets. The proponents used 15% markup price since

the business is done to help hospitals and patients.

Unit Price=Production Cost per Unit +¿

(Production Cost per Unit x 15 % markup)

= Php 251.54 + (Php 251.54 x 0.15)

=Php 289.27 or 290.00


IE –PC 4117 IE CAPSTONE PROJECT 60

5.6 Discussion of the Value of Money

The market value of the product is Php 290 only. The product is worth the price

because of the materials used and its functionality.

The value of the money means that the benefits that the buyer will have in using

the product is worth more than the money that will be spent by him upon buying the

product.
IE –PC 4117 IE CAPSTONE PROJECT 61

Chapter VI

INCENTIVE POLICY

Any inducement or additional benefit that serves as a stimulant for a preferred

action or behavior is regarded as an incentive. Companies utilize incentive programs to

recognize and reward exceptional performance in their employees while also motivating

them to become more effective and productive. Employee incentive programs that are

well-planned typically result in stronger teams and more productive workforce.

The biggest incentive that the company may provide to the employees to motivate

them in completing their jobs is calculated for salaries and wages using the employee's

group incentive plan. This chapter details the many benefits and compensation packages

available to employees.

6.1 Salaries and Wages


Each employee's salary and earnings will be paid on the fifth and twentieth days
of each month.
For specific dates of the month, incentives and allowances are already built in.
Every 15th and 30th of the month is the deadline for payroll compensation.
However, there are rules in place to ensure that employees are paid fairly and have
enough benefits.
Minimum wage, health insurance benefits, and holiday pay are all examples of this.

6. 2 Performance Based Incentives

This is a method of motivating employees by outlining their tasks and tying

compensation to a specified degree of performance.


IE –PC 4117 IE CAPSTONE PROJECT 62

Employee motivation and development are aided by linking rewards to performance.

An employee will be rewarded if he or she meets all of the standards or produces

all of the daily required outputs in this type of reward scheme.

Employees will be driven to focus on their assigned task in order to satisfy the company's

output requirements, as well as to complete a task if they believe they will receive a

specific incentive.

6.3 Employee Recognition

Non-monetary incentives are used to inspire staff in this type of compensation

system. This provides more opportunities to inspire staff for an entrepreneur who has

more imagination than capital. There are numerous ways to get recognized. It includes

frequent recognition events such as employee of the month or year, an annual report that

highlights employee achievements, and department or company recognition boards that

assist raise employee morale for exceptional efforts. Employee recognition is also aided

by positive comments from supervisors and managers. Employees can also be motivated

by symbolic recognition, such as plaques or coffee cups with inscriptions.

Furthermore, a job well done can be recognized by offering additional support or

empowering staff in ways like higher authority and greater assignment choice.

6.4 Overtime Pay


IE –PC 4117 IE CAPSTONE PROJECT 63

Work may be done for more than eight hours each day if the employee is

compensated for the extra time. Overtime pay is a monetary bonus for an eligible

employee who works more than the standard working hours per day. Overtime pay rates

vary depending on whether the labor is done on a regular working day, a special day, a

holiday, or a day off.

6.5 Overtime Pay Rates

The following are the overtime pay rates, which vary depending on the day of the

work:

On typical working days, for work in excess of eight (8) hours:

plus, a quarter-hourly rate of 25%

On a scheduled rest day, a special day, or a normal holiday, for work in excess of

eight (8) hours: Plus 30% of the previous days' hourly rate

6. 6 Holiday Pay

Holiday pay is the portion of the usual daily compensation paid to an employee

for any regular holiday that is not worked.

6.7 Regular Holidays


IE –PC 4117 IE CAPSTONE PROJECT 64

New Year’s Day, Independence Day, and Christmas Day are examples of regular

holidays with fixed dates. National Heroes Day, as well as religious holidays like

Maundy Thursday, Good Friday, Eid'l Fitr, and EidulAdha, are the sole exceptions to this

law. Every employee who is subject to the holiday pay rule is subject to their daily basic

wage. If an employee fails to report to work, the department of Labor and Employment

states that he or she will be paid 100% of his or her income for that day. An employee is

entitled to an additional one hundred percent of his or her basic compensation if he or she

is forced to labor that day.

When an employee's scheduled rest day falls on a holiday, the work done on that

day is worth at least 30% more than the employee's standard holiday rate of 200 percent,

for a total of at least 260 percent. Even if Araw ng Kagitingan coincides with Maundy

Thursday or Good Friday, a covered employee is entitled to at least two hundred percent

(200%) of his or her basic income.

If a regular holiday falls on a Sunday, the following Monday is not a holiday

unless a proclamation declaring it a special day is published or the law is otherwise

modified. Unless otherwise modified by law, decree, or proclamation, the following are

the ten (10) regular holidays recognized by Executive Order No. 292 as revised by

Republic Act 9492.

New Year`s Day January 1


IE –PC 4117 IE CAPSTONE PROJECT 65

Maundy ThursdayMovable Date

Good FridayMovable Date

Araw ng KagitinganApril 9

Labor DayMay 1

Independence DayJune 12

National Heroes DayLast Monday of August

Bonifacio DayNovember 30

Christmas DayDecember 25

Rizal DayDecember 30

6.8 Premium Pay

Premium pay is an additional compensation for work performed within eight (8)

hours on rest days and special days which are considered as nonworking days.

6.9 Special Non-Working Holidays

Workers who are not required or permitted to work on special days are not

entitled in any compensation. During these days, if the employees did not work, the

principle “no work, no pay” shall apply unless there is a favorable company policy or

without prejudice to any voluntarily practice in the Collective Bargaining Agreement

(CBA) granting payment of wages and other benefits on special days.


IE –PC 4117 IE CAPSTONE PROJECT 66

The following are the six (6) special holidays in a year under Executive Order No.

292 as amended by the Republic Act 9492 unless otherwise modified by law, order or

proclamation.

Chinese New Year Movable Date

EDSA People Power Revolution February 25

Black Saturday Movable Date

Ninoy Aquino Day August 21

All Saints Day November 1

6.10 Special Worked Days

For labor performed on a declared special working day, an employee is entitled to

their daily salary rate. Work completed on this day is deemed ordinary workday, hence

no premium pay is required.

6.11 Premium Pay Rates

The following are the legal minimum wage rates:

1. On rest days or special days, for work done

Plus 30% of the daily basic rate of 100% (a total of 130%)


IE –PC 4117 IE CAPSTONE PROJECT 67

2. For work completed on a designated rest day.

Plus 50% of the daily basic rate of 100%, for a total of 15%.

3. Work completed on a scheduled holiday that simultaneously serves as a day of rest.

Plus 30% of his regular holiday rate of 200 percent based on his daily basic wage rate,

for a total of 260 percent.

6.12 13th Month Pay

The 13th month pay is a monetary reward that is equal to an employee's monthly

basic compensation multiplied by the number of months the employee has worked for the

employer in a calendar year.

The employee's basic salary, which will be used to calculate the 13th month pay,

shall include all remunerations or earnings paid by an employer to an employee for

services rendered, but excludes allowances and monetary benefits that are not considered

part of the regular or basic salary, such as unused vacation, sick leave credits, overtime,

premium, night differential, and holiday pay.

The 13th month pay is due on December 24 of each year. An employer, on the other

hand, has the right to provide his or her employees with benefits.

6.13 Parental Leaves

The Philippine Labor Code recognizes three types of parental leave: maternity

leave, paternity leave, and single parent leave.


IE –PC 4117 IE CAPSTONE PROJECT 68

6.13.1 Maternity Leave (as amended by RA 11210)

An act increasing the maternity leave period to one hundred five (105) days for

female workers with an option to extend for an additional thirty (30) days without pay,

and granting an additional fifteen (15) days for solo mothers, and for other purposes

(a) A female Social Security System (SSS) member who has paid at least three (3)

monthly contributions in the twelve (12)-month period immediately preceding the

semester of her childbirth, miscarriage, or emergency termination of pregnancy shall be

paid her daily maternity benefit which shall be computed based on her average monthly

salary credit for one hundred five (105) days, regardless of whether she gave birth via

caesarian section or natural delivery, subject to the following conditions:

■ That the female worker shall have notified her employer of her pregnancy and the

probable date of her childbirth, which notice shall be transmitted to the SSS in

accordance with the rules and regulations it may provide;

■ That the full payment shall be advanced by the employer within thirty (30) days from

the filing of the maternity leave application;

■ That payment of daily maternity benefits shall be a bar to the recovery of sickness

benefits provided under Republic Act No. 1161, as amended, for the same period for

which daily maternity benefits have been received;


IE –PC 4117 IE CAPSTONE PROJECT 69

■ That the SSS shall immediately reimburse the employer of one hundred percent (100%)

of the number of maternity benefits advanced to the female worker by the employer upon

receipt of satisfactory and legal proof of such payment; and

■ That if a female worker shall give birth or suffer a miscarriage or emergency

termination of pregnancy without the required contributions having been remitted for her

by her employer to the SSS, or without the latter having been previously notified by the

employer of the time of the pregnancy, the employer shall pay to the SSS damages

equivalent to the benefits which said female member would otherwise have been entitled

to.

Entitlement

All women workers, regardless of civil status or legitimacy of her child shall be

granted 120 days maternity leave with pay and an option to extend it for another 30 days

without pay. This would make the Philippines compliant with the International Labor

Organizations standards on maternity protection, which mandates a minimum of 98 days

maternity leave.

The employer shall advance full payment of the leave within 30 days from the

filling of the maternity leave application. Women who avail maternity leave and benefit

shall be assured of security of tenure. It cannot be used as basis for demotion in

employment or termination.
IE –PC 4117 IE CAPSTONE PROJECT 70

6.13.2 Paternity Leave (RA 8187)

According to RA 8187, paternity leave benefits are offered to married male employees in

the commercial and public sectors who are lawfully married, cohabiting with their

legitimate wives, and their wives are pregnant, have given birth, or have experienced a

miscarriage.

Paternity Leave Benefits

Paternity leave benefits may be taken before, during, or after delivery, as long as

the total number of working days is not more than seven (7), and he is paid in full,

including his basic salary and any mandatory allowances determined by the Regional

Wage Board, if any, and his pay is not less than the mandated minimum wage.

The benefit, however, will only apply to the employee's lawful wife's first four (4)

deliveries, and it must be used within sixty (60) days of the delivery date.

6.13.2 Solo Parent Leave

RA 8972 established a comprehensive range of services for single parents and

their children. This rule applies to fathers and mothers who are raising their children

alone due to the loss of a spouse, abandonment, separation, or even rape. A single parent

who is left to care for children who are not their own, such as nephews, nieces, or

godchildren, is also covered by this rule. To be eligible for a solo parent leave under RA

8972, an employee must have worked for at least a year.


IE –PC 4117 IE CAPSTONE PROJECT 71

A maximum of seven (7) working days of parental leave shall be granted each year.

6.14 How to obtain Solo Parent ID?

A single parent ID is required for anyone who is qualified and qualifies to obtain

the benefits of the solo parent legislation.

The Local Social Development Office should receive the following materials.

A barangay certificate verifies that you have lived in the barangay for at least six months.

 Any document demonstrating the applicant's income, such as an income tax return

 The documents will be checked by social welfare, and once verified, the applicant

will be granted a case number in the Registry of Solo Parents logbook.

After then, a oneyear solo parent ID will be given, which needs be renewed.

6.15 Sick Leave

Employees are entitled to sick leave under the following conditions:

 For the first two years of service, you are entitled to a total of twelve (12) days of

sick leave per year.

 Starting in the second year of service, you will receive an additional one (1) sick

leave every year.

 Total sick leave is limited to (fifteen) fifteen days.


IE –PC 4117 IE CAPSTONE PROJECT 72

 All unused sick leave days are convertible to cash in December of each year.

6.16 Vacation Leave

Employees are given vacation leave in advance of the following rules:

 A year with thirteen (13) vacation days.

 Starting in the second year of service, you will receive an additional (one)

vacation day per year.

 When unused at the end of the year, it can be converted to cash.

 Maximum total vacation leave is eighteen (18) days a year

6.17 PAG-IBIG Contribution

If an employee has a strong financial standing and is between the ages of 18 and

65, he or she can join the Home Development Mutual Fund (HDMF) under voluntary

membership. He or she must, however, meet with the requirements and submit as a PAG-

IBIG member in accordance with the organization's rules and regulations, as well as the

payment and contribution schedule.

6.18 Phil Health Benefits (RA 7875, As Amended by RA 9241)

6.18.1 National Health Insurance Program


IE –PC 4117 IE CAPSTONE PROJECT 73

Through the National Health Insurance Program, the Philippine Health Insurance

Corporation, or Phil Health, a government body, executes the National Health Insurance

Act of 1995. NHIP replaced and improved the previous Medicare program, which had

been in place for 23 years. In conjunction with other government health initiatives, its

mission is to provide all citizens with a method to get financial access to health care.

Benefits

A unified benefit package for all Phil Health members is being implanted which

includes the following categories of personal health services.

a. For inpatients:

 Room and board

 Services of health care professionals

 Diagnostic, laboratory and other medical examination services

 Use of surgical and other medical examination services

 Prescription drugs and biological, subject to limitations as stated in Section 37 of

RA 7875

 Inpatient education packages

b. For outpatients:

 Services of health care services


IE –PC 4117 IE CAPSTONE PROJECT 74

 Diagnostic, laboratory and other medical examination services

 Personal preventive services

 Prescription drugs and biological, subject to limitations as stated in Section 37 of

RA 7875

 Emergency and transfer services

6.19 Retirement Pay (Article 287. As amended by RA 7641)

The employee is entitled to retirement benefits in the event of retirement.

 An employee who has served at least five (5) years and has reached the age of

sixty (60) years or more, but not beyond sixty-five (65) years, which is hereby

declared the mandatory retirement age, may retire and be entitled to at least one-

half (1/2) month salary for each year of service, with a fraction of at least six (6)

months being considered as one whole year.

6.20 Benefits under the Employees’ Compensation Program (PD 626)

The Employees’ Compensation Program

The Employees Compensation (EC) program aims to assist workers who suffer work-

connected sickness or injury resulting in disability or death.

Coverage
IE –PC 4117 IE CAPSTONE PROJECT 75

 All SSS-registered employers and their employees are compulsory covered under

the program. Employers and employees registered in the SSS need not register

again under EC.

 The SSS has been duly notified of such sickness, injury or death.

Benefits

 Medical services, appliances and supplies provided to the afflicted member

beginning on the first day of injury or sickness, during the subsequent period of

disability, and as the progress of recovery may require.

These benefits are limited to the ward services only of an accredited hospital and

physician. Ward services, consist of all the services some in-patients would ordinarily

receive in a hospital.

 Rehabilitation services, consisting of medical, surgical and hospital treatment.

The SSS also provides as soon as practicable, a balanced program of remedial treatment

for handicapped member.

Income cash benefit for:

 Temporary total disability or sickness. An income cash benefit equivalent to 90%

of the average daily salary credit with a minimum of Php 10 and a maximum of

Php 200.
IE –PC 4117 IE CAPSTONE PROJECT 76

 Permanent total disability (loss of two limbs, permanent complete paralysis of two

limbs, etc.). This benefit is a monthly pension paid for as long as the injured lives

plus 10% for each of the five dependent children beginning with the youngest and

without substitution. This is guaranteed for five years but will be suspended if the

employee is gainfully employed, recovers from permanent total disability, or fails

to present itself for examination at least once a year. The minimum monthly

income benefit is Php 2, 000.00.

 Permanent partial disability (such as loss of one thumb, finger, leg). A monthly

pension is provided to the member equivalent to the pension for permanent total

disability but limited to the number of months designated by law for a particular

disability. The minimum monthly pension is Php 2, 000.00

However, if the period of permanent partial disability pension is less than a year, the

benefit may be paid in lump sum.

 Death. A monthly pension is provided to the deceased member’s primary

beneficiaries, plus 10% of such benefit for each of five dependent children,

subject to some limitations. In the absence of primary beneficiaries, the secondary

beneficiaries are entitled to the monthly pension but not to exceed 60 months. The

minimum monthly pension for the death benefit is Php 2, 000.

Under the EC program, a funeral benefit of Php 10, 000 will also be paid to any person

who actually shouldered the burial expenses of the deceased member.


IE –PC 4117 IE CAPSTONE PROJECT 77

6.21 One-half (1/2) Month Pay per Year of Service

 In case of termination due to the installation of labor-saving devices or

redundancy-at least one (1) month pay for every year of service, whichever is

higher.

 In case of retrenchment to prevent losses and closures due to serious financial

reverses- at least one (1) month pay or at least one-half (1/2) month pay for every

year of service, whichever is higher.

 No separation pays for closures due to business losses.

 For disease- separation pay equivalent to at least one (1) month pay or to one-half

(1/2) month pay for every year of services , whichever is higher.

 Other instances that separation pay may be awarded:

a. When the employee has been declared illegally dismissed and reinstatement is

no longer possible.

b. At the option of the contractor’s employee upon expiration of the Contractor’s

Service Agreement with its principal.

c. In exceptional cases, where separation pay is awarded as a measure of social

or compassionate justice even if the employee is found to have been at fault for his

dismissal.

6.22 Social Security Benefit (RA 1161, as amended by RA 8282)

6.22.1 The Social Security Program


IE –PC 4117 IE CAPSTONE PROJECT 78

In the event of death, disability, sickness, maternity, or old age, covered employees are

entitled to a package of benefits under the Social Security Programs. In essence, the

Social Security System (SSS) offers a replacement for income lost due to the

aforementioned events.

The SSS members can also take out "salary" or "calamity" loans. Wage loans are based

on the employee's monthly salary. Calamity loans are for situations where the

government has declared a calamity in the area where the SSS member lives, such as

flooding, earthquakes, and natural calamities.

Coverage

A private employee, whether permanent, temporary or provisional:

 A household helper earning at least Php. 1,000.00 a month is subjected to

compulsory coverage starting September 1, 1993.

Employees are entitled to a package of benefits under the Social Security program and

Employees’ Compensation (EC) program.

The SSS (Social Security System) provides for a replacement of income lost on account

of contingencies. The benefits under the Social Security Program include:

 Sickness

 Maternity

 Disability
IE –PC 4117 IE CAPSTONE PROJECT 79

 Retirement

 Death

 Funeral

6.23 Separation Pay

A separation pay is the amount received by an employee at the time of his severance and

is intended to give the employee with a source of income while he searches for new

work. Separation compensation is usually only given to employees who have been fired

for good reason or who have diseases that make their ongoing employment illegal or

dangerous to their health or that of their coworkers. The amount of separation pay is

determined by the reason for termination.


IE –PC 4117 IE CAPSTONE PROJECT 80

Chapter VII

QUALITY CONTROL

Quality control is a process through which a business seeks to ensure that product

quality is maintained or improved with either reduced or zero errors. It involves testing of

units and determining if they are within the specifications for the final product. A major

aspect of quality control is the establishment of well- defined controls. These controls

help standardize both production and reactions to quality issues.

In making the Zip Up Hospital Gown, its main objective is to produce product

that can address the difficulty of patients in changing clothes with good quality. The

company shall create a working environment in which both the employees and its

employer strive to do their best to meet the customer’s demands.

These are the following key areas in performing statistical process control in

making Zip Up Hospital Shirt:

 Accuracy of Cutting. The outputs must be inspected in terms of

component sizes to ensure that they are cut to the specified measurement.

 Accuracy of Measurement. The output must be inspected in terms of

component measurement to ensure whether they fit with their co-

components or not in the allocated space.

 Amount of Strength of the Connecting Materials used in Assembly. The


IE –PC 4117 IE CAPSTONE PROJECT 81

amount of strength of connecting material to be used and to be applied in

assembly process should also be tested whether it is durable enough to

withstand possible pressure applied to the product or not.

 Stitches on the Components. The stitches should be inspected to ensure

that the product is in good condition.

7.1 Attributes of the Product Requiring Control

A. Main Material Used in Product

This refers to chosen raw materials mainly used in producing Zip Up

Hospital Gown. This product is primarily composed of a Hospital Gown with the

additional features of having Velcro tape on each side of the gown. It also have

ties on each side to ensure that the gown is properly worn.

Table 7.1

Guidelines of Attributes of Product

PRODUCT NAME Zip Up Hospital Gown


BUYER Patients or patient’s family members
DESCRIPTION A hospital gown with Velcro tapes on
each side and ties to aid in changing
clothes while on IV fluids.
IE –PC 4117 IE CAPSTONE PROJECT 82

Zip Up Hospital Shirt


Specification
Quality Bad Description Good Description
Control
Checking Pill present Smooth
Raw the texture on the fabric texture of the
Material of the fabric
s fabric
Checking
the stitches Poor stitch
technique Properly
stitched

B. Performance of the Worker

Employee performance is the job-related activities expected of a worker and how

well those activities were executed. The objective of business owner is profitability. The

organization’s success depends on the employee’s performance. Many business personnel

directors assess the employee performance of each staff member on an annual or

quarterly basis in order to help them identify suggested areas for improvement. Thus
IE –PC 4117 IE CAPSTONE PROJECT 83

continuous guidance and closer relationship can also enhance the employee’s learning

curve.

Sharing organizational goals with employees are significant since employees have

direct contact with the production of the product. Creating a well-rounded approach to

managing and coaching workforce requires the expertise of a human resource leader and

the support of company’s executive leadership.

7.2 Variables of the Product Requiring Control

Variables of the product are the characteristics that can be measured. The product and

some of its components must be accurately measured. The following must be considered:

 Part Dimensions. Dimensions of the product components should be

accurately cut in order to ensure good quality product by having parts fitly

connected to each other.

 Amount of Connecting Materials Applied. The amount of soldering lead

and other connecting materials applied in the assembly of product parts

that greatly needed its application must be adequate enough to ensure a

strong bond between the components.

7.3 Suggested Practical Methods of Controlling Attributes

The practical methods of controlling variables are extended to the case of than two

related variables. To meet the required product specification, here are some lists of

methods in controlling attributes:


IE –PC 4117 IE CAPSTONE PROJECT 84

1. Give accurate and well defined specification of raw materials to prevent

misunderstanding upon delivery.

2. Proper inspection of the received order should also be done. The packaging of the

orders shall be free from harsh deformities.

3. Performance of workers must be evaluated to ensure their capability in

establishing the job properly and of quality.

7.4 Suggested Practical Methods of Controlling Variables

These are the suggested practical methods in controlling variables:

1. Accurate specification of the outsources parts of the product must be given to the

supplier in order to make sure that accurately measured parts will also be

produced by the supplier.

2. There should be an inspection for the received order and the packaging of orders

also shall be free from harsh deformities. Supplier of orders that fail to conform to

the standards of the company shall be notified of the result of the inspection and

actions shall be taken to resolve this issue.

3. Proper orientation of designated task and training to assigned workers in terms of

its method and appropriate tool to be used.

7.5 Inspection Points along the Line


IE –PC 4117 IE CAPSTONE PROJECT 85

Inspection is an important tool to achieve quality concept. It is necessary to assure

confidence to manufacturer and aims satisfaction to customer.

In order to ensure good quality output, the tailors or seamstress must firstly

inspect the delivery of the raw materials, they must immediately check for the defective

product components before using it to make the Zip Up Hospital Gown.

Another inspection is carried out before packaging and storing of product outputs.

This is to make sure that the product has complied with the standard characteristics of the

expected product. It should be done to protect the consumer from defective products.

The last inspection is done after rework in order to ensure if the product has

already complied with standard requirement of the expected output after undergoing

rework.
IE –PC 4117 IE CAPSTONE PROJECT 86

Figure 11 Inspection Process Flow Chart

7.6 Statistical Method of Controlling Quality

Statistical Quality Control plays a vital role in quality control and

improvement. It is the application of statistical techniques to measure and evaluate the

quality of a product. It provides the principal means by which a product is sampled,

tested, and evaluated, and the information in those data is used to control and improve the

process and the product.

One of the categories of SQC is the Statistical Process Control in which its

application of statistical techniques in order to determine whether the product is produced

as plan or not. Control charts are important tools in Statistical Process Control. Control is

maintained by using them in order to detect whether the process has changed in a way

that will affect product quality as well as to measure the current quality of products or

services.

7.7 Suggested Tool to Control Attributes

Control charts will be used as a tool to control the attributes. Attributes must be

controlled and monitored in order to avoid further defects in the desired operation.

A control chart for attributes is used to monitor characteristics that are discrete

and can be counted. Often, they are distinguished as bad or good or a simple yes or no.

Control charts for attributes of Zip up Shirt will only require one decision and the number

of defective and non-defective raw materials.

7.8 Suggested Tool to Control Variables


IE –PC 4117 IE CAPSTONE PROJECT 87

Control charts will also be used as a tool in controlling variables. This will

contain monitoring of length, width, diameter and the volume of the product components.

7.9 Suggested Policy Regarding Rework

Majority of businesses has undergone rework in producing their products. Rework

is defined as correcting of defective, failed or non-conforming item, during or after

inspection. Rework may include all follow-on efforts such as disassembly, repair,

replacement and reassembly.

There are rules to be considered in producing a Zip Up Hospital Gown;

 Products that need rework must be put in a designated area with a label put on

them.

 Products that need to be rework must be checked accordingly.

 In replacing any product components, they should also be included in the record.

 These are the possible parts that may require rework:

a. Product components that were cut to be resized. Worker may fail to cut the

product parts according to their standard sizes and fail to fit to their co-product

components.

b. Product components that were applied with connecting materials. The

amount of connecting material used is not adequate enough to strengthen the

connection between parts.

c. Velcro Tapes.If the Velcro tapes do not attach with each other.
IE –PC 4117 IE CAPSTONE PROJECT 88

Figure 12. Qualification of Personnel in Charge of Quality Control

Control for quality of product outputs is designated to a personnel-in-charge

known as quality inspector. Quality inspector is responsible for assuring that

manufactured items are made and assembled correctly. He must have the ability and

patience of thoroughly examining material goods on the production line and either

approves or rejects an item based on its final quality. Any matured person may qualify as

long as he is fully knowledgeable in the attributes and variables of the product and knows

how to weigh decisions properly.

Failure to Comply Product Standard Quality

Product failure is the ultimate defining line in poor quality. It happens when a

certain product for in production fails to pass multiple examination in order to determine

the standard. The examination will be done by the general manager described in the job

specification as quality control.

 Rework monitoring sheet should be filled up by the general manager.


IE –PC 4117 IE CAPSTONE PROJECT 89

 Identify the defects or parts that needs to be rework.

 Identify the cause of defects;

o Human Errors

 Errors caused by negligence of the operator may cause penalty to

the organization.

 First warning. The general manager will warn and give a formal

written warning once confirmed of negligence.

 Second warning. The general manager will formally write a letter

and ask for penalty for the damaged raw materials.

 Last warning. The general manager will formally write a letter for

dismissal and the employee will get fired in the position.

o Machine Errors

 Identify which machine caused the error and the seriousness of the

damage.

 Request a technician if necessary.

o Environmental Factors

 Factors such as typhoons, fires and other natural phenomenon that

causes defect to the product. The organization will salvage what

can be save in order to lessen the cost of failures.

Products that failed twice in evaluation of standard or quality will be thrown out

in the recycle bin and make it into something useful. Products that can’t be recycled or
IE –PC 4117 IE CAPSTONE PROJECT 90

salvage will be thrown into garbage disposal bins and will be collected by the Municipal

Solid Waste Management.


IE –PC 4117 IE CAPSTONE PROJECT 91

Chapter VIII

MATERIAL HANDLING

Material handling is an activity that involves movement of material or products

within an organization from one place to another place or the flow of material or products

to vehicles or from vehicles. The activities are usually confined within the boundaries of

an organization. The movement of material from one organization to another is

categorized as transportation work, which is not part of material handling activities.

This is much more than the handling of inventory. It’s the movement, protection, storage

and control of materials and products throughout their lifespan of manufacturing,

warehousing, distribution, consumption, and disposal. It encompasses a range of

components to keep the supply chain running.

It is important to know the significance of material handling because it helps to optimize

work process and lead in reducing the total cost of the production. It also helps to

improve the overall production activity.

8.1 Principle of Material Handling

Material handling principles are essential to optimize processes, reduce costs and

reduce risk. It is critical for manufacturing organization to identify importance of material

handling principles, as the critical step in promoting the job improvement process.

Manual material handling significantly increases health hazard for the workers from

lower back injuries. However, the use of these principles should not be elucidating as a

substitute for experience and judgment.


IE –PC 4117 IE CAPSTONE PROJECT 92

 Planning Principle

-It is a statement of a desirable outcome from a chain of reasoning aimed at reaching, or a

list of appropriate matters to be considered in making, a planning decision.

All material handling should be the result of deliberation of plans, performance

objectives and functional specification of the proposed methods.

 Standardization Principle

-Material handling methods, equipment, controls and software must be standardized

within the limits that achieve global performance objectives without sacrificing

flexibility, modularity and production.

 Work Principle

-Material handling work should be minimized without sacrificing productivity or the

required level of operation. The measure of work is material flow (volume, weight, or

count per unit of time) multiplied by the distance moved

 Ergonomic Principle

- Human capabilities and limitations must be recognized to ensure safe and

effective operations. The material handling workplace and the equipment used to

assist in the work production must be ergonomically designed. Equipment should

be selected to eliminate repetitive and strenuous manual labor and which

effectively interacts with human operators.

-
IE –PC 4117 IE CAPSTONE PROJECT 93

 Unit Load Principle

-A unit load is one that can be stored or moved as a single entity at one time. Less effort

and work is required to collect and move many items one at a time. Unit loads shall be

appropriately sized and configured in a way which achieves the material flow and

inventory objectives at each stage in the supply chain.

 Space Utilization Principle

- Effective and efficient use of available space must be made. In work areas, cluttered and

unorganized spaces and blocked aisles should be eliminated.

 System Principle

-Material movement and storage activities must be fully integrated to form an operating

system that encompasses reception, inspection, storage, production, assembly, packaging,

unification, order selection, shipping, transportation, and claims handling. This principle

will help in organizing the flow and order of the materials throughout the system.

 Automation Principle

-Material handling operations should be mechanized and or automated where feasible to

improve operational efficiency, increase responsiveness, and improve consistency and

predictability. Pre- existing processes and methods should be simplified before any

efforts at installing mechanized or automated systems.


IE –PC 4117 IE CAPSTONE PROJECT 94

 Environmental Principle

- The environmental impact and energy consumption must be considered criteria when

selecting equipment for handling materials.

 Life-Cycle Cost Principle

-Life-cycle cost includes all the cash flows that will occur from the time the first dollar is

spent to plan or procure a new piece of equipment, or to put in place a new method, until

that method and/or equipment is totally replaced. Develop a comprehensive economic

analysis that takes into account the entire life cycle of material handling systems.

8.2 Measure Distance in Moving Materials by MHE

Table 8.1

Distance in Moving Materials

FROM TO DISTANCE (meter)

Storage Area Production Line 1.5- 2.5

Production Area Finish Products Storage 1.5-2.5

8.3 Recommended Material Handling Equipment

The following are the recommended material handling equipment in producing

Zip-Up Hospital Gown.

These trolleys are used also used to hold


IE –PC 4117 IE CAPSTONE PROJECT 95

bundle fabrics

Figure 13 Transport Equipment

Racks used for storing cutting Containers for Sewing Materials

bundles

Figure 14 Storage of Raw Materials and Finished Product


IE –PC 4117 IE CAPSTONE PROJECT 96

Chapter IX

MAINTENANCE FACILITIES

Maintenance involves functional checks, servicing, repairing or replacing of

necessary devices, equipment, machinery, building infrastructure and supporting utilities

in industrial, business, governmental and residential installations. . There are four types

of maintenance: breakdown maintenance, preventive maintenance, corrective

maintenance and maintenance prevention.

Breakdown maintenance means that people waits until equipment fails and repairs

it. Such a thing could be used when the equipment failure does not significantly affect the

operation or production or generate any significant loss other than repair cost.

Preventive maintenance is a routine for periodically inspecting with the goal of

noticing small problems and fixing them before major ones develop. The main goal of

preventive maintenance is for the equipment to make it from one planned service to the

next planned service without any failures caused by fatigue, neglect or normal wear.

Corrective maintenance is a task performed to identify, isolate and rectify fault so

that the failed equipment, machine or system can be restored to an operational condition

within the tolerances or limits established fo in in service operations.

Maintenance prevention indicates the design of new equipment. Weaknesses of

current machines are sufficiently studied and are incorporated before commissioning new

equipment.
IE –PC 4117 IE CAPSTONE PROJECT 97

In the production of Thor Power, preventive maintenance will be adopted since in

making the product doesn’t require large machineries which likely demand for huge

attention upon using. Whenever necessary, corrective actions may also be applied.

9.1 Maintenance of Production Lines

Maintenance is to ensure the maximum efficiency and availability of production

equipment, utilities and related facilities at optimal cost and under satisfactory conditions

of quality, safety and protection for the environment. Maintenance was considered as a

subordinate function, entailing an inevitable waste of money. Maintenance optimizes the

reliability of equipment and infrastructure; ensure that equipment and infrastructure are

always in good condition so as to secure the best possible availability for production.

Maintenance also ensures the operational safety of the employees, contribute finished

product quality and ensure environmental protection.

9.1.1 Preventive Maintenance

Preventive maintenance is the regularly performed on a piece of equipment to

lessen the likelihood of failing. It is performed while the equipment is still working so

that it does not break down unexpectedly. An ideal preventive maintenance program

would prevent all equipment failure before it occurs. The goal of a successful preventive

maintenance program is to establish consistent practices designed to improve the

performance and safety of the equipment. A planned maintenance of equipment will help

improve equipment life and avoid any unplanned maintenance activity.


IE –PC 4117 IE CAPSTONE PROJECT 98

Table 9.1

Maintenance of Tools and Equipment

Equipment/Tools Recommended Maintenance Frequency


Maintenance Technique

Sewing Machine Check Functionality Before and After Use


Storage Cabinets Maintain Cleanliness Before and After Use
Trash Can Maintain Cleanliness Before and After Use
LED Lamps Check Functionality Before and After Use
Computer Set Check Functionality Before and After Use
Printer Check Functionality Before and After Use
Telephone Check Functionality Before and After Use
Time Clock Check Functionality Before and After Use
Desk Maintain Cleanliness Before and After Use
Locker Cabinets Maintain Cleanliness Before and After Use
Scissors Check Functionality Before and After Use
Fire Extinguisher Check Functionality Before and After Use
First Aid Kit Check Functionality Before and After Use
Gloves Check Functionality Before and After Use
Sewing Pins Check Functionality Before and After Use
IE –PC 4117 IE CAPSTONE PROJECT 99

Table 9.2

Maintenance Card

9.1.2 Corrective Maintenance

Corrective Maintenance is a maintenance task performed to identify, isolate, and

directly, and rectify a fault so that failed equipment, machine, or system can be restored

to an operational condition. It is a maintenance work which involves repair or

replacement of components which have failed or broken down.

Corrective maintenance is a maintenance task or operation done in order to

identify, isolate or separate and rectify a particular fault. This is performed in order to

restore the failed machine, equipment or system to an operational condition. It is a form

of maintenance that is performed after a fault or problem emerges in the system, with the

goal of restoring operability.


IE –PC 4117 IE CAPSTONE PROJECT 100

Table 9.3

Corrective Maintenance Card

Table 9.4

Corrective Maintenance Activities

Tools and Equipment Corrective Maintenance Activities

Sewing Machine Clean

LED Lamp Clean

Computer Set Clean

Printer Clean

Telephone Clean
IE –PC 4117 IE CAPSTONE PROJECT 101

9.1.3 Maintenance for Material Handling Equipment

A wide variety of material handling equipment is in the market, some

equipment is for general purpose use and others are of special purposes. The

best equipment will be one which permits smooth and continuous flow

involves less accidents, reduces production cycle time, promotes better

working conditions, incurs less fatigue to the operators and brings down the

total material handling tools.

Table 9.5

Maintenance for Material Handling Equipment

Material Handling Recommended Frequency of

Equipment Maintenance Technique Maintenance

Transport Equipment Clean Every other day

Storage of Raw Clean Every other day

Materials

Product Display Clean Every other day


IE –PC 4117 IE CAPSTONE PROJECT 102

9.1.4 Total Preventive Maintenance Checklist

Total Preventive maintenance is a system of maintaining and improving the

integrity of production and quality systems through the machines, equipment, processes

and employees that add business value to an organization. TPM focuses on keeping all

equipment in top working condition to avoid breakdown and delays in manufacturing

processes.

Table 9.6

Total Preventive Maintenance Checklist


IE –PC 4117 IE CAPSTONE PROJECT 103

9.2 Maintenance for Non-Production Facilities

Non production facilities refer to the facilities that do not directly contribute to the

manufacturing of the product. Even if it does not directly contribute to the manufacturing

of the product, it is necessary to ensure that those facilities are in good condition and can

be use when it is needed. The non- production facilities include the buildings and

electrical systems.

9.2.1 Building

The very important factor on the manufacturing process is a place to produce the product.

Building is a must in every business to start up your production. However, buildings will

rapidly decay and degrade when building maintenance has been neglected. Thus,

knowing the importance of it, it should be also maintained just like the equipment and

tools in the production to have a smooth flow of process and have a safe and sound

working environment for the employees and workers. The main goal is to manage a

building and its grounds as well as customize needs for facilities.

The possible areas of inspection when conducting and making a building maintenance are

shown as follows:

 Check for dust control

Since the product includes electronic circuits, checking the dust control should be done

every day. To have a dust free environment, the employee and workers should observe

proper cleaning routines before and after the work since a clean environment can affect

the productivity of a worker.


IE –PC 4117 IE CAPSTONE PROJECT 104

 Check for the roofing

Check the roof system of the building. Since the product have an electronic component,

good roofing is highly needed. Personnel in charge should see for possible leaks if there

is a rain. Checking should be done quarterly.

Table 9.8

Building Maintenance Card


IE –PC 4117 IE CAPSTONE PROJECT 105

9.2.3 Electrical System

All electrical systems require maintenance in addition to non- scheduled

maintenance caused by unpredictable events such as storms, accidents and equipment

failure. The intent of maintenance is to keep the system operating at an acceptable level

of service away from any possible danger. Certain maintenance activities are common to

all systems regardless of type. These activities should always be performed on the cycle

applicable for the system.

The following are the wiring and connection maintenance:

 Clean conductors, terminals and connectors of all corrosion

 Check the equipment grounding system including conduit end bushing

connections, bonds, equipment grounding conductors, enclosure grounding

connections and pole grounding connections.

 Check grounding installations for damage and repair if necessary.

 Tighten terminals and connectors including breakers, transformers and contactor

connectors.

 Check the grounding electrode and associated connections.

 Replace deteriorated or missing conductor and terminal identification markings.


IE –PC 4117 IE CAPSTONE PROJECT 106

Table 9.9

Electrical System Maintenance Card


IE –PC 4117 IE CAPSTONE PROJECT 107

9.3 Personnel In-Charge of Maintenance Work

Maintenance personnel must perform preventive and inspection maintenance

which requires dismantling and assembling equipment, electrical components and

devices. They are responsible for inspecting, maintaining and repairing devices, machines

and equipment. They should ensure that the building structures, fixtures and the other

related company services are operating smoothly and efficiently.

Qualification of Maintenance Personnel

 Proven maintenance experience for 2 or more years

 Skilled in the use of hand and power tools.

 Eye for detail

 Strong time management skills.

 Male/Female

 Ability to maintain focus while working individually.


IE –PC 4117 IE CAPSTONE PROJECT 108

Table 9.10

Summary of Schedules for Preventive Maintenance

Summary of Schedules for Preventive Maintenance

Key Areas Particulars Schedules/ Maintenance

Frequency

Sewing machine Before use

Production Tools and Led lamps Before use

Equipment
Scissor Before use

Gloves Before use

Sewing pins Before use

Transport Equipment Once a week/ Monday

Material Handling Storage of Raw Materials Once a week/ Monday

Equipment
Product Display Once a week/ Monday

Quarterly/ First Friday of

March, June, September


Roofs
and December
Building
Quarterly/ First Saturday

of March, June, September


Dust control
and December
IE –PC 4117 IE CAPSTONE PROJECT 109

Wirings

Switches Once a Year/ First Week

of December
Electrical System Distribution Box

Socket

Light Fittings
IE –PC 4117 IE CAPSTONE PROJECT 110

Chapter X

SAFETY AND HEALTH

Health and safety are critical factors for all companies to enhance both employee

and employer’s wellness. It is the job and moral obligation of the company to ensure the

safety of its employees. Each employee is entitled to adequate safety and health care

provided by their employers.

Safety is one of the most serious issues and it is entirely the responsibility of the

business owners to ensure that their staff work in a safe atmosphere. On a regular basis,

there should be an appropriate discussion regarding the job and culture of the office, so

that the management is aware of how they an simplify these things for the employees,

comfort. The management should spend their time to ponder and strategize the things that

what safety precautions are essential in the organization to assure that the workers are

safe enough for all the time. This aids in increasing productivity and quality of the

product.

10.1 Measures against Occurrences of Accidents in the Plant

Accidents are unforeseen events that cause injuries, illness, death, and property

and/or productivity losses. While there is no way to totally avoid accidents, certain

strategies, preparations, and activities can be implemented to limit their occurrence.

Employees must be accountable for their own safety. Participation in health and

safety seminars makes a significant contribution to reducing or preventing work-related

accidents.
IE –PC 4117 IE CAPSTONE PROJECT 111

The following are accident prevention strategies organized according to potential

cause.

10.1.1 Electrical Safety

Electricity is required for just about all types of activities in most manufacturing

and other facilities. While electricity has improved the world in many ways, it is still

important to remember that it can be very dangerous. Electricity can kill or severely

injure people and cause damage to property. It has long been recognized as a serious

workplace hazard.

Electrical safety is a set of organizational and technical procedures designed to

protect workers from the damaging and deadly consequences of electric current, arcing,

electromagnetic fields, and static electricity.

The following are some of the basic for electrical safety:

 Extension cords should not be used in the office areas. Generally, extension cords

should be limited to use by maintenance personnel.

 Any electrical equipment causing shocks or high leakage potential must be tagged

with a Danger tag or equivalent.

 Plug power equipment into wall receptacles with power switches in the OFF

position.

 Unplug electrical equipment by grasping the plug and pulling. Do not pull or jerk

the cord to unplug the equipment.

 Check for frayed, cracked, or exposed wiring on equipment cords.


IE –PC 4117 IE CAPSTONE PROJECT 112

 Check for defective cords clamps at locations where the power cord enters the

equipment or the attachment plug.

10.1.2 Machine Safety

Machines can help improve production efficiency in the workplace but, their

moving parts, sharp edges and hot surfaces have the potential to cause severe workplace

injuries. Below are some basic for machine safety:

 Do not use the machine if safeguards are unauthorized or damaged.

 Lubricate machine parts wherever possible withour removing the safeguard.

 Always wear the Proper Protective Clothing while working on a machine.

 All accessible parts of the machine should have no sharp edges, rough surfaces,

protruding parts, etc., if so, do not use the equipment.

 Report problems with machine safeguards to your supervisor immediately.

10.1.3 Tools Safety

The use of safe tools contribute to a safer and more efficient work environment.

Misusing tools is not only harmful, it also demonstrates a lack of understanding of tool

safety and a disregard for others around you. Below are some safety practices to avoid

accidents using tools:

 Inspect the tools regularly

 Always wear appropriate personal protective equipment

 Never use a tool for a different purpose than it was intended

 Clean and return the tool to its proper storage place after using
IE –PC 4117 IE CAPSTONE PROJECT 113

 Don’t work with greasy or oily hands

10.2 Personal Protective Equipment

Worker’s safety is a primary concern in a workplace. Personal Protective

Equipment is worn to minimize exposure to hazards that cause serious workplace injuries

and illnesses. Since the employees ofthe Zippy Tend company are mostly doing

stationaryworkwiththeir handsdoingthe work, at all cost we must protect their hands.

Thefollowing PPEwillbehandeddowntotheemployeesupon theirrequest.

Table 10.1

Personal Protective Equipment

PPE Image Function

Provides extra comfort for

Skin tight gloves the cutters and sewers, also

protect their hands from

pain in long hours of

working.

Measures for Securing the Plant against the Bad Elements of Society

Physical security is the protection of personnel, hardware, software, networks and

data from physical actions and events that could cause serious loss or damage to an
IE –PC 4117 IE CAPSTONE PROJECT 114

enterprise, agency or institution. Measures for securing the plants against bad elements of

society include the following:

1. Deterrence

It is a strategy intended to deter an adversary from taking an action not yet

started by means of threat of reprisal, or to prevent them from doing something

that another state desires.

2. Human Response

Security guards who is in charge in securing safety for all prevent risks

and deter crime, watch out for looming danger, and report any crime they may

encounter. Their presence can provide peace of mind and a sense of security to

the business owner, employees and customers.

3. Detection

It is the act of noticing or discovering something. The use of detection

system such as alarms is one of the preventive measures that greatly help in the

response or trigger of fires and other emergencies. It monitors also a network or

systems for malicious activity or policy violations.


IE –PC 4117 IE CAPSTONE PROJECT 115

4. Vehicles

Any vehicles that will enter and will leave the company premise should be

carefully inspect and check to avoid activities such as smuggling and others. This

activity should be carefully responded by the security guards.

Fire Safety

Fire safety information saves lives. It can teach how to recognize fire

hazards, conduct fire safety risk assessment, prevent a workplace fire, and

respond if a fire occurs. Passage ways where emergency fire exits must be free at

all times.

 Anyone should be aware of the location for fire exits and fire

extinguishers.

 Fire extinguishers are intended for fighting fires, thus, it should be used

purposively.

 Use appropriate safety device

Surveillance Camera

Surveillance camera in the workplace protects both the company and its

employees. It plays a crucial role within the daily running of the business. It is also

recommended to have it in order to monitor all the incoming and outgoing raw materials,

vehicle and people. Aside from being installed to protect against potential theft or

criminal activity, it plays an important role within the productivity levels of employees.
IE –PC 4117 IE CAPSTONE PROJECT 116

10.3 Recommended Policies Regarding Health of Worker

The health of workers is an essential prerequisite for productivity and economic

development. It is one of the main concerns of the company. In order to secure the health

of the workers, the company must implement safety measures strictly.

Health risks at the workplace, such as heat, noise, dust, hazardous chemicals,

unsafe machines and psychological stress, cause occupational diseases and can aggravate

other health problems. In this regard, the workers should be provided with personal

protective equipment (PPE) during working hours and always remind the workers about

the safety instructions. Therefore, restoring and maintaining working capacity is an

important function of the health services. In addition, all workers and particularly those in

high-risk occupations need health services to assess and reduce exposure to occupational

risks as well as detection of occupational and work related diseases and injuries.

10.4 Medical and Dental Services

Medical and dental services take care of protecting and promoting and

maintaining the health and well- being of the workers inside the company. The employer

shall employ a part time occupational health physician and a part time dentist who will

stay at least 4 hours in every three days alternately with each other to provide health care

services to the workers. These health care personnel will have to stay inside the

production premises in order for them to be accessed easily. A full-time nurse will also be

employed and a clinic will be provided for these health care personnel.
IE –PC 4117 IE CAPSTONE PROJECT 117

The company shall provide first aid kits and medicines easily accessible by the

employees in accordance to safety employee benefit regulations as prescribed by the

Department of Labor and Employment throughout the workplace.

Employees can receive dental insurance from the company’s dental provider.

After twenty-four (24) months of employment, they can have an insurance plan that

require a low monthly premium and other co-payment, but allows the freedom to choose

their dentists. If a family member is added by the employee, they will be responsible of

the remaining costs prior to the agreement.


IE –PC 4117 IE CAPSTONE PROJECT 118

Chapter XI

PLANT LAYOUT

Plant lay out refers to the physical arrangement of the facilities in the whole area.

It is important to consider the planning of the plant in starting a business. This is to

ensure the efficiency and effectiveness of attaining the success of the business. Plant

layout is also widely defined as the plan of or act of planning an optimum arrangement of

facilities including personnel, operating equipment, storage space, materials handling

equipment and all other supporting services along with the design of the best structure to

accommodate these facilities. These things should be properly arranged accordingly in

order to have the quickest flow of material at the lowest cost.

The objectives of a good plant layout are to provide comfort to the workers and

catering to worker‟s taste and liking; to give good and improved working conditions; to

minimize delays in production and to make efficient use of the space that is available;

and to have better control over the production cycle by having greater flexibility for

changes in the design of the product.

11.1 Space Requirements

An efficient plant layout is one of the instruments in achieving proper and

efficient utilization for available space and to ensure that work proceed form on point to

another point without any delays. Space requirements are significant for certain machines

and equipment and others in order to operate efficiently and effectively. In manufacturing

Zip-up Gown, the sufficient and adequate spaces for the working area play a big role for

having productive production lines.


IE –PC 4117 IE CAPSTONE PROJECT 119

11.2 Non-Production Functional Area

Non-production Functional Area refers to the areas where there is no direct

contribution or contact to the production processes. These areas are classified into two

different kinds, namely: Auxiliary Service Area and Administrative Area.

Auxiliary Service Area

1. Display Area

It is an area used for displaying the finish product. It is where the

customers can view the product displayed.

2. Parking Area

It is an empty area that is intended for parking vehicles. This is the space

provided for the vehicles used in transporting goods-raw materials or finished

products as well as accommodating different type of vehicles for employee’s and

visitors’ cars.

Administrative Area

1. Administrative Office

Administrative office is where the administrative officers stay and execute

their functions. This includes the General Officer/ Accountant and Human

Resource Personnel.
IE –PC 4117 IE CAPSTONE PROJECT 120

2. Comfort Room

There will be five comfort rooms to be installed – two for the production

area, two for the administrative office and one for display areaintended for

customer. This is the room intended for sanitary purposes. It should be maintained

clean adequately.

Production Functional Area

These areas is directly contributes to the manufacturing of the product.

1. Storage Room

This is the area intended for storing raw materials used in the production.

This must be kept clean and organized in order to locate the materials easily and

avoid stress.

2. Production Area

This is the area where the Zip-up Gown are made from inception to its final form.

This must be designed properly in order to keep the production line effective and efficient

in producing good quality products. The table for Quality Control Personnel is located in

the area to have an ease of inspection.

11. 3 Space Relationship Diagram

Space relationship diagram shows the arrangement of every department and its

relationship on every area. The closeness codes will be used and place in every
IE –PC 4117 IE CAPSTONE PROJECT 121

department areas to acquire good flow of every transaction and to know the importance

of each relationships.

Table 11.1

Closeness Codes

CODES WEIGHT GAUGES SYMBOL DEFINITION

A 4 Absolutely necessary

E 3 Especially Important

I 2 Important

O 1 Ordinary

U 0 Unimportant

X -1 Closeness Undesirable
IE –PC 4117 IE CAPSTONE PROJECT 122

Activity Space Relationship Diagram for Auxiliary Area

Figure15 Closeness Relationships in Auxiliary Area

Activity Relationship Worksheet for the Auxiliary Area

The worksheet interprets the activity relationship diagram and becomes the basic

data for the dimensionless block diagram.

Table 11.2

Degree of Closeness for Auxiliary Area

Degree of Closeness
Department
A E I O U X
1 Display Area 4
2 3
2 Parking Lot
1 3 4
3 Fire Exit
1, 2 4
4 Drainage
2 3 1
IE –PC 4117 IE CAPSTONE PROJECT 123

Dimension less Block Diagram for Auxiliary Area

The Dimensionless Block Diagram is the first attempt and the result of the

Activity Relationship Diagram and worksheet.

Figure 16 Dimensionless Block Diagram for Auxiliary Area

Activity Space Relationship Diagram for Administrative Area

Figure 17 Activity Relationships in Administrative Area


IE –PC 4117 IE CAPSTONE PROJECT 124

Activity Relationship Worksheet for the Administrative Area

The worksheet interprets the activity relationship diagram and becomes the basic

data for the dimensionless block diagram.

Table 11.3

Degree of Closeness in Administrative Area

Department Degree of Closeness


A E I O U X

1 General 2, 3
Manager’s
Office

2 Logistics and 1, 3
HR
Supervisor’s
Office

3 Comfort Room 1,2

Figure 18 Dimensionless Block Diagram for Administrative Area


IE –PC 4117 IE CAPSTONE PROJECT 125

Activity Relationship Worksheet for the Production Area

Figure 19 Activity Relationships in Production Area

Activity Relationship Worksheet for the Production Area

The worksheet interprets the activity relationship diagram and becomes the basic

data for the dimensionless block diagram.

Table 11.4

Degree of Closeness in Production Area

Department Degree of Closeness

A E I O U X
1 Production
Supervisor’s 2,4 3
Office

2 Production
Staff Area 3, 4
3 Storage Area 1
4
4 Comfort Room
3
IE –PC 4117 IE CAPSTONE PROJECT 126

Figure 20 Dimensionless Block Diagram for Production Area

11.4 Space Allocation

Space allocation refers to the division of the plant in order to allocate the different

departments and sections. Materials, machines, equipment and offices should be properly

allocated for the smooth flow of production. Space allocation includes both production

and non-production area.


IE –PC 4117 IE CAPSTONE PROJECT 127

11.4.1 Area Allocation for Non- Production Functional Area

Table 11.5

Area Allocation for Display Area

Display Area

Item Dimension Area (cm2) Quantit Total Area

y (cm2)

Heavy Duty 35.6cm x 104cm 3,702.40 cm2 1 5,553.60 cm2

Rack Clothes

Total Space 5,553.60 cm2

Percent Allowance 50%

Space Allocation 8,330.40 cm2

Table 11.6

Area Allocation for Administrative Office

Administrative Office

Item Dimension Area (cm2) Quantit Total Area

y (cm2)

Office Desk 75cm x 143.60cm 10,770 cm2 1 10,770 cm2

Table 75cm x 115cm 8,625 cm2 1 8,625 cm2

Chair 48cm x 48cm 9,216 cm2 4 36,864 cm2

Filing Cabinet 45cm x 45 xm 2,025 cm2 1 2,025 cm2


IE –PC 4117 IE CAPSTONE PROJECT 128

Total Space 58,284 cm2

Percent Allowance 200%

Space Allocation 116,568 cm2

11.4.2 Area Allocation for Production Functional Area

Table 11.7

Area Allocation for Production Area

Production Area

Item Dimension Area (cm2) Quantit Total Area

y (cm2)

Sewing 4.75cm x 77cm 14,630 cm2 4 58,520 cm2

Machines

Chairs 30cm x 30cm 28,800 cm2 4 115,200 cm2

Total Space 173,720 cm2

Percent Allowance 100%

Space Allocation 347,440 cm2


IE –PC 4117 IE CAPSTONE PROJECT 129

Table 11.8

Area Allocation for Storage Room (R.M.)

Storage Room

Item Dimension Area (cm2) Quantit Total Area

y (cm2)

Wooden 30.48cm x 1,858.07 cm2 1 1,858.07 cm2

Cabinet 60.96cm

Total Space 1,858.07 cm2

Percent Allowance 50%

Space Allocation 2,787.105 cm2

Table 11.9

Area Allocation for Storage Room (F.G.)

Storage Room

Item Dimension Area (cm2) Quantit Total Area

y (cm2)

Open Cabinet 30.48cm x 1,858.07 cm2 1 1,858.07 cm2

60.96cm

Total Space 1,858.07 cm2

Percent Allowance 50%

Space Allocation 2,787.105 cm2


IE –PC 4117 IE CAPSTONE PROJECT 130

Table 11.10

Summary of Space Allocation Per Area

Summary of Space Allocation Per Area

Non-Productive Functional Productive Functional


Area Area

Auxiliary Total Administrative Total Area Production Area Total Area (cm2)
Service Area Area (cm2)
Area (cm2)
Display 8,330.40 Administrative 116,568 Production Area 347,440 cm2
Area Office
cm2 cm2 Storage Room 2,787.105 cm2
(R.M.)
Storage Room 2,787.105 cm2
(F.G.)

11.5 Total Area of the Sections of the Plant

This section presents the total space allocated in the entire plant layout. It includes

the non-production area and the production area. The factory has a total of 48.64 square

meters beside Isidro C. Kintanar Memorial Hospital.


IE –PC 4117 IE CAPSTONE PROJECT 131

11.6 Final Layout

Figure 21 Plant Layout


IE –PC 4117 IE CAPSTONE PROJECT 132

11.7 Plant Location

Figure 22 Plant Location


IE –PC 4117 IE CAPSTONE PROJECT 133

11.8 Percentage of Lot Occupancy

The proposed plant will make use of 18.44 square meters of the leased

commercial building. While the total area is 48.64 square meters.

Total AreaOccupied
Percent Lot Occupancy= x 100
Total Area of the Lot

18.44 sq . m.
= 48.64 sq . m. x 100

Percent Lot Occupancy = 37.91%

Total Area Occupied


Percent Occupancy of Non Productive Area= x 100
Total Area of the Lot

11.92 sq .m .
= x 100
48.64 sq . m.

Percent Occupancy of Non-Productive Area = 24.51%

Total Area Occupied


Percent Occupancy of Productive Area= x 100
Total Area of the Lot

6.51 sq .m .
= x 100
48.64 sq . m.

Percent Occupancy of Productive Area = 13.38%


IE –PC 4117 IE CAPSTONE PROJECT 134

Chapter XII

COST OF DEVELOPMENT

In business, especially, there is always space for development. The cost of

development refers to the expenses incurred throughout the project's implementation. The

cost of development comprises the expense of constructing a new facility, offering a new

product or service, expanding territory, and conducting business with a new client class.

12.1 Cost of Lease

The Zip up hospital gown company production line and shop are located at the

commercial building beside Isidro C Kintanar Memorial Hospital, the target market. The

company will take up 2 spaces for lease. Every room for lease has a value of Php 5, 000

per month, the total lease or renting expense is Php 10,000.

12.2 Cost of Structure

Fortunately, the building is ready for the operation needed for the production of

the Zip-up hospital shirt. The building has been renovated due to minor damages of

typhoon Odette and it has a wide-open space in the front for parking area.

12.3 Cost of Open Space

The open space for parking is within the cost of building lease. The proponents

don’t have to build parking spaces.

12.4 Cost of Tools and Equipment

Below are the tools and equipment needed to operate and optimize the production

of Zip-up hospital gown.


IE –PC 4117 IE CAPSTONE PROJECT 135

12.4.1 Workstation tools and Equipment

Below are the lists of tools and equipment in producing Zip-up hospital gown at

the workstation.

Table 12.1

Cost of Machine, Tools and Equipment

WORKSTATION

MaterialandEquipmen Quantity Price (Php) Total Price


t (Php)
JukiHighspeed 4 20,000 80, 000
SewingmachineDDL-
8700
Needle set 4 220 880

Tailor 4 175 700


andseamstressScissor
Tapemeasure 4 10 40

WhiteCardboard 100 12 120

Cliptablelamp 4 120 480

Razorblades 40 2.8 112

SewingPinand 16 124 1,984


cushion
Jukioil 2 335 670

IzumipedalTrashBin 4 550 2,200

Electric Stand fan 2 1,550 3,100

360- 4 999 3,996


degreeadjustablechair
TOTAL Php 94, 282
IE –PC 4117 IE CAPSTONE PROJECT 136

12.4.2 Administrative Area

Office Tools and Equipment are significant especially during accomplishing

orders and completing important transactions. They also aid in making reports and paper

documenting.

Table 12.2

Cost of Office Tools and Equipment

ADMINISTRATIVE OFFICE

MaterialandEquipment Quantity Price(Php) Total


Price(Php)
OfficeTable 1 5,349 5, 349

Office Chair 3 827 2,481

FilingCabinet 1 7,875 7,875

ComputerSet 1 10,499 10, 499

EpsonPrinter 1 9,152.49 9,152.49

TimeClockfingerprintattendance 1 1,554 1,554

PLDT prepaidlandline 1 2,778.10 2,778.10

IzumipedalTrash Bin 1 550 550

Hanabishi Water Dispenser 1 3001 3001

TOTAL Php 43, 239.1


IE –PC 4117 IE CAPSTONE PROJECT 137

12.4.3 Raw Materials and Finished Product Storage

Table 12.3

Cost of Raw materials and Finished Product Storage

RAWMATERIALSANDFINISHEDPRODUCTSTORAGE

MaterialandEquipmen Quantity Price(Php) Total Price(Php)


t
Wooden cabinet 2 5,500 11,000

TOTAL Php11,000

12.4.4 Store / Display Area

Table 12.4

Cost of Furnitures and Fixtures in Store / Display Area

STORE/ DISPLAY AREA

MaterialandEquipmen Quantity Price(Php) TotalPrice


t (Php)
ReceptionDesk 1 23,000 23, 000

Cash register 1 8,219.24 8,219.24

360 degrees chair 1 827 1,654

Stainless steel display 2 2, 662 5,324


rack
TOTAL Php 38, 197.24
IE –PC 4117 IE CAPSTONE PROJECT 138

12.4.5 Locker Area

Table 12.5

Cost of Furniture in Locker Area

LOCKER AREA

Material Quantity Price(Php) TotalPrice


andEquipment (Php)
Locker 2 9,500 9, 500
Roomcabinet
TOTAL Php 9, 500

12.4.6 Miscellaneous Supplies

These are supplies that also help and support the production of Zip-up hospital gown.

Table 12.6

Cost of Office Supplies

MISCELLANEOUSSUPPLIES

Material Quantity Price(Php) TotalPrice


andEquipment
(Php)

Bondpaper 2reams 155 310

Ballpen 2boxes 200 400

Gloves 50 30 1,500

Firstaidkit 1 1,350 1,350


IE –PC 4117 IE CAPSTONE PROJECT 139

FireExtinguisher 2 6,275 12, 550

Razor Blades 10 20 200

Official 2 20 40

receipts

LED lights 14 185 2,590

Bathroom Tissue 1 660 660

Soap/ sanitizer/ethyl 1 139 139


alcohol

TOTAL Php 19, 739

12.5 Total Cost of Development

Total Cost of Development= Cost of Land + Cost of Structure + Cost of Open Space

+Tools and Equipment + Cost of Furniture and Fixtures + Cost of Office Tools and

Equipment + Cost of Office Supplies + Cost of other Supplies

Total Cost of Development =Php 10,000 + Php 94, 282+ Php 43, 239.1+Php11,000+

Php 38, 197.24+ Php 9, 500+ Php 19, 739

Total Cost of Development = Php 225, 957.34

The total cost of development is Php 225, 957.34 for the first year of production.
IE –PC 4117 IE CAPSTONE PROJECT 140

Chapter XIII

ORGANIZATIONAL STRUCTURE OF THE PLANT

13.1 Organizational Structure

An organizational chart is a diagram that shows the structure of an organization

and the relationships and relative ranks of its positions or jobs. It outlines the roles,

responsibilities and relationships between the organization’s staff members. It guides the

employees to know their rights and responsibilities.

Organizational chart graphically illustrates the concept known as chain of

commands and shows the flow of authority, responsibility and communication. The

importance of using this is felt due to the fact that a business organization needs to

provide guidance and clarity on various organizational and human resource issues.

Zippy Tend Company uses a flat type of organizational chart which directly

illustrates relations between people within an organization, thus bringing the top

management in direct contact with the production workers and shopkeeper. When an

organization chart grows too large it can be split into smaller charts for separate

departments within the organization. It is of great support to create and define the

organizational structure, so that the business objectives may be accomplished accordingly

and yet successfully.

This is vital tool for top management to use when planning the staff required

running the company efficiently and cost - effectively.

The organizational chart of Zip Up Hospital Gown is shown below:


IE –PC 4117 IE CAPSTONE PROJECT 141

Figure 23 Organizational Chart

13.2 Functions of Organizational Positions

13.2.1 General Manager

General Manager is responsible for running the company, he or she has the

biggest responsibilities of all the department manpower.

13.2.2 Shopkeeper

The shopkeeper ensures that the store is kept clean and organized. He or she also

keeps a record of sales and restocks the store accordingly and mediate any confrontation

between staffs and clients. Also responsible for purchases and orders for the raw

materials.

13.2.3 Tailors or Seamstress

Alters or repair, construct, and labels customers’ garments. They also clean work

area, machines and equipment after use.


IE –PC 4117 IE CAPSTONE PROJECT 142

Chapter XIV

CONCLUSIONS AND RECOMMENDATIONS

14.1 Conclusion

Zip Up Hospital Gown is beneficial for those patients in the hospital. It is ideal to

be introduced to the society as it is an innovation that came from the idea of having

hospital gowns to be added with features like Velcro tapes on each side for a convenient

way of changing patients’ clothes while he/she has intravenous fluid connected to his/ her

body. This product allows the wearer to change clothing without any hassle and

eliminating the risk of worsening the patients’ current health condition. The researchers

concluded that with its unique and classic design, improved features, quality and one of a

kind researcher’s idea, Zip Up Hospital Gown will be marked high to market and will

meet customer’s demand. Having and maintaining good quality products of Zip Up

Hospital Gown, can contribute to the trending in the market and be beneficial to the user

in the industry.

14.2 Recommendation

Based on the study done by the researchers, the following recommendations are

raised:

 Expand the company through advertising and promoting on other

hospitals.

 Extend the target market to areas outside the present business target’s

current stage.
IE –PC 4117 IE CAPSTONE PROJECT 143

 Diversify your product mix to offer a greater range of options.

Medium

Table 14.1
Medium Measurement(inches)
Parts Measurements

Length 46"

Sweep 26"

Sleeve 9"
IE –PC 4117 IE CAPSTONE PROJECT 144

Large Size

Table 14.2

Large Measurement(inches)

Parts Measurements

Length 47"

Sweep 27"

Sleeve 10"
IE –PC 4117 IE CAPSTONE PROJECT 145

Extra Large

Table 14.3

Extra Large Measurement(inches)

Parts Measurements

Length 48"

Sweep 28"

Sleeve 11"

The sizes that are shown above such as medium, large and extra-large are collected

from Gorgeous Hospital Gown Website.


IE –PC 4117 IE CAPSTONE PROJECT 146

 Improve the product and service in all feasible ways to increase

commercial potential.This feature will be added soon in the product.

Back ties

Velcro Tape for


extra protection

Figure 24. Front and Back View Added features and variant
IE –PC 4117 IE CAPSTONE PROJECT 147

Appendices
IE –PC 4117 IE CAPSTONE PROJECT 148

Zip-up Hospital Gown Survey Questionnaire

The purpose of this questionnaire is to determine the potential market of the

planned product the Zip-up Hospital Gown. A hospital gown which has an opening from

shoulder hem to the bottom hem of the gown on both sides in order to provide ease in

changing gowns or clothes by only sliding the head while on intravenous injections.

The questions are intended only for Isidro C Kintanar Memorial Hospital.

Name of the respondent (optional):

Position/ Affiliation:

I. Existing product

1. Is there an available patient gowns for minimal risk situations provided by the
hospital? If no, please proceed to number 3 part I.
 Yes
 No
 Yes, but upon patient request.
 Others, please specify
2. If yes, how many times one patient gown can be reuse and washed before
disposal?
 1 time only
 2 times
 3 times
 Others, please specify
3. Is there a standard guideline for patient gowns practiced in the hospital?
(Example, materials used, sizes, color coding, if yes, preferably attached with
documents)
 Yes
IE –PC 4117 IE CAPSTONE PROJECT 149

 No

4. How many patients can the hospital cater at this time?

II. Introduction of the Product

1. If there is an available patient gown in the market, would you like to consider
procuring it for the hospital?
 Yes
 No
2. Will you be interested in procuring our Zip-up Hospital gown which is designed
for patients with intravenous injection to aid in patient changing clothes?
 Yes
 No

3. What market price would you be interested to procure our product?


 Php 100 -131
 Php 131 - 150
 Php 151 - 170
 Php 170 and above
4. What will be the preferences in procuring our Zip-up Hospital Shirt? May check
more than one.
 Quality
 Functionality
 Aesthetics
 Price
 Others, please specify

5. In what way would you like to for us to produce the product?


 Contractual
 Made to order
 Constant supply
 Others, please specify
6. In what way would you like to contact the producer of the product?
IE –PC 4117 IE CAPSTONE PROJECT 150

 Email
 Text message and call
 Social media
 Others, please specify

Curriculum vitae
IE –PC 4117 IE CAPSTONE PROJECT 151

PETERJADEM.TANGPOS
Lugot,Langkas,Dalaguete,Cebu
Email:
peterjademoncedatangpos@
gmail.comMobileNo.
09295393713

PERSONALDATA
Age: 21
Birthdate: June29,2000
Birthplace: Langkas, DalagueteCebu
CivilStatus: Single
Sex: Male
Height: 161cm
Weight: 60 kg
Citizenship: Filipino
Father’sName:

Tirso Tangpos
Sr.Mother’sName:

Susana
TangposSiblings:

GenoTangpos
Cl
ar
a
M
ae
Ta
ng
po
sJ
ud
e
Ni
no
Ta
ng
IE –PC 4117 IE CAPSTONE PROJECT 152

po
s

EDUCATIONALBACKGROUND

Intermediate: LangkasElementarySchool

March2012

Secondary: UniversityoftheVisayas-DalagueteCampus

March2019

Tertiary: CebuTechnologicalUniversity-ArgaoCampus

BachelorOfScienceinIndustri

alEngineering2018-Present

ALLANJ.CENTINO
Balud,Dalaguete,Cebu
Email:
allan.centino@
ctu.edu.phMobi
leNo.09686506
096

PERSONALDATA
Age: 24
Birthdate: May31,1997
Birthplace: Caliongan,DalagueteCebu
CivilStatus: Single
IE –PC 4117 IE CAPSTONE PROJECT 153

Sex: Male
Height: 163cm
Weight: 50 kg
Citizenship: Filipino
Father’sName:

SaturninoCentinoMoth
er’sName:

CenonaCentinoSiblings
:

AlbertoJ.Centino
Alv
inoJ
.Ce
ntin
oAl
exa
nde
r J.
Cen
tino
Alo
na
J.
Cen
tino
An
nari
zaJ.
Cen
tino

EDUCATIONALBACKGROUND

Intermediate: CalionganElementarySchool

March2012
Secondary: Dalaguete

National High
IE –PC 4117 IE CAPSTONE PROJECT 154

SchoolMarch2

019

Tertiary: CebuTechnologicalUniversity-ArgaoCampus

BachelorOfScienceinIndustri

alEngineering2018-Present

CHARISSEJEAND.PELOMINO
Mantalongon,Dalaguete,Cebu
Email:charissejean.pelom
ino@ctu.edu.ph.MobileN
o.09511933251

PERSONALDATA
Age: 22
Birthdate: November6,1999
Birthplace: Mantalongon,Dalaguete,Cebu
CivilStatus: Single
Sex: Female
Height: 143cm
Weight: 38 kg
Citizenship: Filipino
Father’sName: Jose
Edwin G.
PelominoMother’sName:

MarifieD.PelominoSiblings:

CharlesMarvinPelomino
Charit
y Grace
Pelomi
noAlex
IE –PC 4117 IE CAPSTONE PROJECT 155

isRaeni
erPelo
minoJo
shuaNi
ñoPelo
minoY
hancee
Pelomi
no

EDUCATIONALBACKGROUND

Intermediate:

MantalongonEl
ementaryScho
olMarch2012

Secondary: MantalongonNational HighSchool


April2018

Tertiary: CebuTechnologicalUniversity-ArgaoCampus

BachelorOfScienceinIndustri

alEngineering2018-Present

ALMA JOY E. ALVIOLA


Canduran, Lamacan, Argao, Cebu
Email:
almajoy.alviola@ctu.edu.
ph.
MobileNo.09925101976
IE –PC 4117 IE CAPSTONE PROJECT 156

PERSONALDATA
Age: 27
Birthdate: March 1, 1995
Birthplace: Canduran, Lamacan, Argao, Cebu
CivilStatus: Single
Sex: Female
Height: 5’2 inches
Weight: 48 kg
Citizenship: Filipino
Father’sName: Jose R.
Alviola
Mother’sName: Alicia
E. Alviola
Siblings:

JeijuAlexte Egos
Aljie Mae A.
Amamangpang
Jose Alexandre E.
Alviola

EDUCATIONALBACKGROUND

Intermediate: Tulic
Elementary
School
2007-2008

Secondary: The Sisters of Mary School Girlstown


2011-2012

Tertiary: Cebu Technological University-ArgaoCampus

Bachelor Of Science in Industrial

Engineering
IE –PC 4117 IE CAPSTONE PROJECT 157

2012-Present

You might also like