Branch Office: Mumbai

INSPECTION Stage / Final: stage


REPORT Report Date: 30-12-2022
File No & ISN No: /6601 APEX Call No:
Report No: MUM/22/YRB/076 Revision: 00

Inspection Performed Date (s): 30-12-2022


IRCLASS Client: M/s Essobigi Engineers Pvt.Ltd
Client PO No. (on IRCLASS): PO No - C-494 /2022-23 dtd 28.12.2022
End User/Project: M/s. BPCL, LPG Plant, Rasayani, Maharashtra
Main Vendor Name: M/s Essobigi Engineers Pvt.Ltd
Sub Vendor Name: NA
Main Vendor PO No & Date: 4509142024 DTD.14.09.2022
Sub Order PO No & Date: NA
Inspection Location: BPCL ,RASAYANI
Client Specific Additional
NA
Information: (if any)
Mode of Inspection Request (Verbal / Email / Fax): e-mail/NOI No: DT 28-12-2022

Reference Documents: (Add rows for more documents – Reference standards, drawings, Datasheet, Procedures- NDT/Pressure test/
Performance Test, WPS/PQR/WPQ etc.)
Rev. Document
Doc. Name Doc. Number Date Approved By
No Supplied by
ASME CODE ASME SEC IX :2021 ED NA NA NA
2021

Person Attended / Present for inspection: (Add more rows if required)


Person Name Representing Position / Designation Contact No / e-mail address
Organization
Mr. Yogesh Bharambe IRclass Engineer 9867721208/
Yogesh.Bharambe@irclass.org
MR,Sourabh Dey M/S E.E.P.L QA/QC 8092757270
/souravessobigi@gmail.com

Previous Inspection report Ref. No. & Date: NIL


Pending observations in previous report (if any): (Add more rows if required) NA
Status Document referred to close Remark /
Sr. No. Remark / Deviation Details
(Open / Closed Deviation
1 NA NA NA

Name & Sign of Inspector (s) Name & Sign of Vendor Rep.

30/12/2022
YOGESH R. BHARAMBE Vendor Rep.
Inspector to IRCLASS
Sheet 1 of 5
Effective Date: 04.10.2022 Form No. IS/F/IR/001 Rev. 07
Branch Office: Mumbai
INSPECTION Stage / Final: stage
REPORT Report Date: 30-12-2022
File No & ISN No: /6601 APEX Call No:
Report No: MUM/22/YRB/076 Revision: 00

Details of items offered for inspection: (Table format to be changed as per Item description requirement)
Sr. Item No / Identification PO Offered Accepted
Item Description UOM
no Tag No (lot/heat/sr.no.) Qty Qty Qty
1 --- WPQ SAMPLE -1 E.E.P.L/WPQ/W- 01 6G 01 01 01 Refer
GTAW + SMAW Conclusion
2 --- WPQ SAMPLE-2 E.E.P.L/WPQ/W- 02 6G 01 01 01
SMAW
3 -- WPQ SAMPLE-3 E.E.P.L/WPQ/W- 03 6G 01 01 01
SMAW

Following Inspection done as per ITP / QAP stages, PO and reference document Requirement:
Sr ITP / QAP Inspection details: (Respective supporting documents along with its reports no, Backup Document
No. Sr. No. Rev, and date as applicable to be mentioned and to be attached) Ref. No.
1 --- PQR / WPQ test piece dimensions are checked & found as per requirement. --
2 --- Welder No E.E.P.L/WPQ/W- 01 6G: Alpesh Kumar & E.E.P.L/WPQ/W- 02 6G: ---
Mohanlal Maity, E.E.P.L/WPQ/W- 03 6G Purna chandra sasmal
Previous welding experience certificates are verified & found as per
required qualification.
3 --- Witnessed welder performance qualification test for 03 welder’s – Back up page for
Welder No E.E.P.L/WPQ/W- 01 6G: Alpesh Kumar & E.E.P.L/WPQ/W- 02 6G: PQR & WPQ
Mohanlal Maity, E.E.P.L/WPQ/W- 03 6G Purna chandra sasmal
, in (6G) position of Pipe 2” NB X SCH 80 (thickness 5.54 mm) with reference
to WPS No. EEPL/WPS/01 & EEPL/WPS/02 Rev.00 Dt.27.08.2019
4 --- Root run DPT & final weld visual of WPQ test piece of
is checked & found satisfactory.
WPQ Test Sample hard stamped on test piece as“IRS 286” For
Identification
5 --- For WPQ Test piece - E.E.P.L/WPQ/W- 01 6G & E.E.P.L/WPQ/W- 02 6G, ---
E.E.P.L/WPQ/W- 03 6G, carry out . NDE (RT) In For final acceptance of M/s
IRclass as per ASME Sec.IX- Latest Ed.

Remarks / Deviation (If any):Nil


1 WPQ -3 nos NDE (RT) balance.
2 Calibration certificate of vernier caliper & welding machine to be submit for review.

Name & Sign of Inspector (s) Name & Sign of Vendor Rep.

30/12/2022
YOGESH R. BHARAMBE Vendor Rep.
Inspector to IRCLASS
Sheet 2 of 5
Effective Date: 04.10.2022 Form No. IS/F/IR/001 Rev. 07
Branch Office: Mumbai
INSPECTION Stage / Final: stage
REPORT Report Date: 30-12-2022
File No & ISN No: /6601 APEX Call No:
Report No: MUM/22/YRB/076 Revision: 00

Inspector’s Identification mark Witnessed WPQ samples hard stamped as “I R S ”near ID


(Hard stamp/Hologram/Sticker) & its location on
inspected item:
marking. 286

Attachments:
1 E.E.P.L BACKUP PAGE REPORT

Calibration Status of Instruments used: (Attach Reports for Reference as Applicable)


Acceptable evidence of traceability to national and international standards of measurements of those calibrations performed by:
National Metrology Institutes such as NPL-India or other CIPM (International committee for weights and measures) MRA signatories;
Calibration laboratories accredited by NABL-India, an ILAC and APLAC MRA signatory, or those demonstrating compliance to ISO/IEC 17025;
Calibration Laboratories accredited by other ILAC MRA signatories.
Measuring equipment Calibration validity Calibration National/ International Calibrated from NABL
Name & Sr. No Certificate Ref. / traceability (Master Instrument accredited lab (Yes /
No. Lab Cert. No.) No) (See note 1)
VERNIER CALIPER -- -- -- --
AiL/V/001
WELDING MACHINE -- -- -- --
AUPL/WM/OO1
Note:
1. If the calibration certificate(s) for the measuring instrument(s)/equipment(s) used during inspection do not have traceability to NABL/NPL-
India/CIPM/ILAC/APLAC MRA signatories, then the scope of review is limited only to technical content in the calibration certificates.
2. In lieu of table above inspector may collect master list from manufacturer / vendor/ sub vendor with all above details clearly highlighting the details of
instrument(s)/equipment(s) used during inspection.
Disclaimer for MTC/Lab Reports/Type Test certificate review:
ISSPL has only verified the technical content during the certificate review and is not accountable for any compliance with lab traceability to ISO/IEC 17025 or NABL
Accredited laboratory.
Conclusion (Accepted / Not Accepted / Hold): Witnessed welder performance qualification test for 03
(If not accepted / HOLD, Refer Remarks / Deviation table) welder’s EEPL/W-01,02 & 03 : in (6G) position final weld
visual checked & found satisfactory.
For final acceptance as mentioned in REMARK WPQ Test
piece to be NDE (RT) Tested.

Name & Sign of Inspector (s) Name & Sign of Vendor Rep.

30/12/2022
YOGESH R. BHARAMBE Vendor Rep.
Inspector to IRCLASS
Sheet 3 of 5
Effective Date: 04.10.2022 Form No. IS/F/IR/001 Rev. 07
Branch Office: Mumbai
INSPECTION Stage / Final: stage
REPORT Report Date: 30-12-2022
File No & ISN No: /6601 APEX Call No:
Report No: MUM/22/YRB/076 Revision: 00

Photographs:

WPQ SAMPLE consumable

WELDER –w02 WELDER –W03

WELDER –W01 Root run Visual

Name & Sign of Inspector (s) Name & Sign of Vendor Rep.

30/12/2022
YOGESH R. BHARAMBE Vendor Rep.
Inspector to IRCLASS
Sheet 4 of 5
Effective Date: 04.10.2022 Form No. IS/F/IR/001 Rev. 07
Branch Office: Mumbai
INSPECTION Stage / Final: stage
REPORT Report Date: 30-12-2022
File No & ISN No: /6601 APEX Call No:
Report No: MUM/22/YRB/076 Revision: 00

Stamping

---- End of Report------

Note: This is inspection report for the inspection activity offered for inspection and NOT INSPECTION RELEASE NOTE for dispatch.

This Inspection Report (IR) / Inspection Release Note (IRN) / Certificate is issued upon the following terms and conditions:
The scope of inspection covered in this report/certificate is limited to the Scope of Work agreed in the contract between ISSPL and Its Customer. And also limited to
actual work completed and the applicable reference documents submitted to ISSPL by the Customer or Customer's authorized personnel at the time of Inspection.

Whilst IRCLASS Systems & Solutions Private Limited (hereinafter referred to as ISSPL) and its Committees use their best endeavors to ensure that the functions of
ISSPL are properly carried out, in providing services, information or advice neither ISSPL nor any of its servants or agents warrants the accuracy of any information or
advice supplied. Except as set out herein neither ISSPL nor any of its servants or agents (on behalf of each of whom ISSPL has agreed this clause) shall be liable for
any loss damage or expense whatever sustained by any person due to any act or omission or error of whatsoever nature and however caused of ISSPL its servants
or agents or due to any inaccuracy of whatsoever nature and howsoever caused in any information or advice given in any way whatsoever by or on behalf of ISSPL,
even if held to amount to a breach of warranty. Nevertheless, if any person uses services of ISSPL, or relies on any information or advice given by or on behalf of
ISSPL and suffers loss damage or expenses thereby which is proved to have been due to any negligent act omission or error of ISSPL its servants or agents or any
negligent inaccuracy in information or advice given by or on behalf of ISSPL then ISSPL will pay compensation to such person for his proved loss up to but not
exceeding the amount of the fee charged by ISSPL for that particular service, information or advice.

Any notice of claim for loss, damage or expense as referred to above shall be made in writing to ISSPL Head Office within six months of the date when the service
information or advice was first provided, failing which all the rights to any such claim shall be forfeited and ISSPL shall be relieved and discharged from all liabilities.
Manufacturer / Supplier does not get relieved from the guarantee and obligations set forth in the purchase order and other contractual documents.

Name & Sign of Inspector (s) Name & Sign of Vendor Rep.

30/12/2022
YOGESH R. BHARAMBE Vendor Rep.
Inspector to IRCLASS
Sheet 5 of 5
Effective Date: 04.10.2022 Form No. IS/F/IR/001 Rev. 07