You are on page 1of 2

REPUBLIC OF THE PHILIPPINES

SORSOGON STATE UNIVERSITY


I ISO 9001: 2015 CERTIFIED

UTILITY BILLING REPORT


Facility : College Canteen
Location : Sorsogon State University – College of Engineering and
Architecture (Sitio Baribag, Brgy. Bibincahan, Sorsogon City)
Lessee/Tenant : Jarick Abainza
Utility Service : Electricity
Billing Date : February 3, 2022
Billing Period : November 6, 2022 – February 3, 2023

ELECTRIC UTILITY
BILLING KWHR METER
1
Meter Number : 18931724
Present Reading : 01786 KWHR
Previous Reading : 00774 KWHR
Figure 1 KWHR Meter 2
KWHR Used : 1,012.00
kWHr

KWHR METER 2
Meter Number : 103268397
Present Reading : 00765 KWHR
Previous Reading : 00216 KWHR
KWHR Used : 549.00 kWHr

Price/KWHR : ₱ 19.36/kWHr (Price based on the current electricity


bill of SorSU Main Campus)
Total Consumption : 1,012.00 kWHR + 549.00 kWHR = 1,561.00 kWHR
Figure 2 KWHR Meter 1

Electricity Bill (Meter 1 + Meter 2) : 1,561.00 kWHR x ₱ 19.36 = ₱ 30,220.00

Prepared By:

RUFO D. DURIAN III, ME


Dean – College of Engineering and Architecture
REPUBLIC OF THE PHILIPPINES

SORSOGON STATE UNIVERSITY


I ISO 9001: 2015 CERTIFIED

UTILITY BILLING REPORT


Facility : College Canteen
Location : Sorsogon State University – College of Engineering and
Architecture (Sitio Baribag, Brgy. Bibincahan, Sorsogon City)
Lessee/Tenant : Jarick Abainza
Utility Service : Water
Billing Date : February 3, 2022
Billing Period : November 6, 2022 – February 3, 2023

WATER UTILITY BILLING


Meter Number : -
Present Reading : 126.00
Previous Reading : 54.00
Cubic meter Used : 72.00 cu.m.
Price/cu.m. : ₱ 23.0425/cu.m. (Price based on the
current water bill of SorSU Main
Campus)

Water Bill : 72.00 cu.m. x ₱ 23.0425/cu.m = ₱ 1,659.06

Prepared By:

RUFO D. DURIAN III, ME


Dean, College of Engineering and Architecture

You might also like