DCM-ALV-019-15:
1 DCM-ALV-019-015- FOR VERIFICATION OF DELETION OF DOOR AT • PRSP (Sir Wes) suggest to interchange left side FCU and glass door. Glass door will
001 FUNCTION ROOM GROUND FLOOR DUE TO CONFLICT Done be transom. (06/10/2022)
WITH THE FCU. • As per IDG (Sir Dustin) email sent dated 06/13/2022, Okay to relocate
and combine pantry room service door with function room windows.
DCM-ALV-019-15:
FOR VERIFICATION OF DOOR LOCATION AT LOBBY • As per IDG (Sir Dustin) follow door location of ID Plans. (06/10/2022)
DCM-ALV-019-015- GROUND FLOOR. DOOR LOCATION IS CONFLICT • As per IDG (Sir Dustin) email sent dated 06/13/2022,
2 Done
002 WITH FLOOR MOUNTED FCU, -Follow as per MPI FCU layout.
-Provide cladding for ref pipes. We can remove window panel on the conflicted
portion only
DCM-ALV-019-15:
• As per IDG (Sir Dustin) FCU location at elevator lobby is okay, check if ref pipe can
pass thru slab. Might provide console table or potted plants. IDG for study.
(06/10/2022)
DCM-ALV-019-015- FOR VERIFICATION OF LOCATION OF FLOOR • As per IDG (Sir Dustin) email sent dated 06/13/2022,
3 Done
003 MOUNTED FCU AT ELEVATOR LOBBY GROUND FLOOR -Follow as per MPI FCU layout.
-Follow window as per AR intent
-Option 1 – Check if we can have ref pipes pass through the slab instead to
retain glass window intent
-Option 2 – If not possible, wall off conflicted window panel.
www.mdc.com.ph
ARCHITECTURAL AND ENGINEERING DIVISION – BUILDING INFORMATION MODELING DEPARTMENT
GROUND FLOOR FOR VERIFICATION OF DELETION OF DOOR AT FUNCTION ROOM GROUND FLOOR DUE TO CONFLICT WITH THE FCU. CERCA PHASE 3 T1
KEYPLAN
GROUND FLOOR
SENT DATED JUNE 03, 2022 SENT DATED MARCH 22, 2022 with function room windows.
VERIFY IF GLASS
DOOR IS FOR
DELETION
FLOOR FLOOR
MOUNTED MOUNTED SIGN – OFF
FCU FCU
PRSP OPEN
DCM-ALV-019-015-001
AS PER PLAN 3D VIEW www.mdc.com.ph
ARCHITECTURAL AND ENGINEERING DIVISION – BUILDING INFORMATION MODELING DEPARTMENT
GROUND FLOOR FOR VERIFICATION OF DELETION OF DOOR AT FUNCTION ROOM GROUND FLOOR DUE TO CONFLICT WITH THE FCU. CERCA PHASE 3 T1
GROUND FLOOR KEYPLAN
REMARKS
DCM-ALV-019-15:
• PRSP (Sir Wes) suggest to interchange
left side FCU and glass door. Glass door
will be transom. (06/10/2022)
3D VIEW
AS PER PLAN
SIGN – OFF
PRSP OPEN
DCM-ALV-019-015-003
www.mdc.com.ph
VERIFY DOOR LOCATION AT LOBBY GROUND FLOOR. ARCHITECTURAL AND ENGINEERING DIVISION – BUILDING INFORMATION MODELING DEPARTMENT
GROUND FLOOR
FOR VERIFICATION OF DOOR LOCATION AT LOBBY GROUND FLOOR. DOOR LOCATION IS CONFLICT
WITH FLOOR MOUNTED FCU,
CERCA PHASE 3 T1
KEYPLAN
GROUND FLOOR
REMARKS
DCM-ALV-019-15:
• As per IDG (Sir Dustin) follow door
location of ID Plans. (06/10/2022)
FLOOR
MOUNTED
FCU
VERIFY DOOR
LOCATION.
CONFLICT WITH FCU
SIGN – OFF
AS PER PLAN 3D VIEW
PRSP OPEN
DCM-ALV-019-015-002
ID BASEPLAN
SENT DATED JUNE 03, 2022 www.mdc.com.ph
VERIFY DOOR LOCATION AT LOBBY GROUND FLOOR. ARCHITECTURAL AND ENGINEERING DIVISION – BUILDING INFORMATION MODELING DEPARTMENT
GROUND FLOOR
FOR VERIFICATION OF DOOR LOCATION AT LOBBY GROUND FLOOR. DOOR LOCATION IS CONFLICT
WITH FLOOR MOUNTED FCU,
CERCA PHASE 3 T1
KEYPLAN
GROUND FLOOR
REMARKS
DCM-ALV-019-15:
• As per IDG (Sir Dustin) follow door
location of ID Plans. (06/10/2022)
AS PER PLAN
SIGN – OFF
PRSP OPEN
DCM-ALV-019-015-004
3D VIEW www.mdc.com.ph
ARCHITECTURAL AND ENGINEERING DIVISION – BUILDING INFORMATION MODELING DEPARTMENT
GROUND FLOOR FOR VERIFICATION OF LOCATION OF FLOOR MOUNTED FCU AT ELEVATOR LOBBY. CERCA PHASE 3 T1
GROUND FLOOR KEYPLAN
REMARKS
DCM-ALV-019-15:
• As per IDG (Sir Dustin) FCU location at
elevator lobby is okay, check if ref pipe
can pass thru slab. Might provide
console table or potted plants. IDG for
study. (06/10/2022)
3D VIEW
SIGN – OFF
PRSP OPEN
DCM-ALV-019-015-003
MPI PLAN
SENT DATED JUNE 01, 2022 www.mdc.com.ph
ARCHITECTURAL AND ENGINEERING DIVISION – BUILDING INFORMATION MODELING DEPARTMENT
GROUND FLOOR FOR VERIFICATION OF LOCATION OF FLOOR MOUNTED FCU AT ELEVATOR LOBBY. CERCA PHASE 3 T1
GROUND FLOOR KEYPLAN
REMARKS
DCM-ALV-019-15:
• As per IDG (Sir Dustin) FCU location at
elevator lobby is okay, check if ref pipe
can pass thru slab. Might provide
console table or potted plants. IDG for
study. (06/10/2022)
3D VIEW
SIGN – OFF
PRSP OPEN
AS PER PLAN DCM-ALV-019-015-005