You are on page 1of 10

FR-04-BIM-009-rev.

A&E–BIMD
ARCHITECTURAL AND ENGINEERING DIVISION – BUILDING INFORMATION MODELING DEPARTMENT

CERCA PHASE 3 TOWER 1


DCM-017: DESIGN ISSUES & CONCERN
June 24, 2022
ARCHITECTURAL AND ENGINEERING DIVISION – BUILDING INFORMATION MODELING DEPARTMENT

OUTSTANDING DESIGN ISSUES & CONCERNS


• DCM-ALV-019-015

www.mdc.com.ph
ARCHITECTURAL AND ENGINEERING DIVISION – BUILDING INFORMATION MODELING DEPARTMENT

ARCHITECTURAL

www.mdc.com.ph
ARCHITECTURAL AND ENGINEERING DIVISION – BUILDING INFORMATION MODELING DEPARTMENT

DESIGN ISSUE SUMMARY 015 JUNE 20, 2022

ITEM REFERENCE NUMBER DESCRIPTION STATUS RESOLUTION

ARCHITECTURAL

DCM-ALV-019-15:
1 DCM-ALV-019-015- FOR VERIFICATION OF DELETION OF DOOR AT • PRSP (Sir Wes) suggest to interchange left side FCU and glass door. Glass door will
001 FUNCTION ROOM GROUND FLOOR DUE TO CONFLICT Done be transom. (06/10/2022)
WITH THE FCU. • As per IDG (Sir Dustin) email sent dated 06/13/2022, Okay to relocate
and combine pantry room service door with function room windows.

DCM-ALV-019-15:
FOR VERIFICATION OF DOOR LOCATION AT LOBBY • As per IDG (Sir Dustin) follow door location of ID Plans. (06/10/2022)
DCM-ALV-019-015- GROUND FLOOR. DOOR LOCATION IS CONFLICT • As per IDG (Sir Dustin) email sent dated 06/13/2022,
2 Done
002 WITH FLOOR MOUNTED FCU, -Follow as per MPI FCU layout.
-Provide cladding for ref pipes. We can remove window panel on the conflicted
portion only

DCM-ALV-019-15:
• As per IDG (Sir Dustin) FCU location at elevator lobby is okay, check if ref pipe can
pass thru slab. Might provide console table or potted plants. IDG for study.
(06/10/2022)
DCM-ALV-019-015- FOR VERIFICATION OF LOCATION OF FLOOR • As per IDG (Sir Dustin) email sent dated 06/13/2022,
3 Done
003 MOUNTED FCU AT ELEVATOR LOBBY GROUND FLOOR -Follow as per MPI FCU layout.
-Follow window as per AR intent
-Option 1 – Check if we can have ref pipes pass through the slab instead to
retain glass window intent
-Option 2 – If not possible, wall off conflicted window panel.

www.mdc.com.ph
ARCHITECTURAL AND ENGINEERING DIVISION – BUILDING INFORMATION MODELING DEPARTMENT

AR FOR VERIFICATION OF DELETION OF DOOR AT FUNCTION ROOM GROUND FLOOR.


PROJECT

GROUND FLOOR FOR VERIFICATION OF DELETION OF DOOR AT FUNCTION ROOM GROUND FLOOR DUE TO CONFLICT WITH THE FCU. CERCA PHASE 3 T1
KEYPLAN
GROUND FLOOR

FUNCTION ROOM REMARKS


DCM-ALV-019-15:
• PRSP (Sir Wes) suggest to interchange
left side FCU and glass door. Glass door
will be transom. (06/10/2022)

• As per IDG (Sir Dustin) email sent


Click to add text dated 06/13/2022, Okay to relocate
ID BASEPLAN PRSP PLAN and combine pantry room service door

SENT DATED JUNE 03, 2022 SENT DATED MARCH 22, 2022 with function room windows.

VERIFY IF GLASS
DOOR IS FOR
DELETION

FLOOR FLOOR
MOUNTED MOUNTED SIGN – OFF
FCU FCU

PRSP OPEN
DCM-ALV-019-015-001
AS PER PLAN 3D VIEW www.mdc.com.ph
ARCHITECTURAL AND ENGINEERING DIVISION – BUILDING INFORMATION MODELING DEPARTMENT

AR FOR VERIFICATION OF DELETION OF DOOR AT FUNCTION ROOM GROUND FLOOR.


PROJECT

GROUND FLOOR FOR VERIFICATION OF DELETION OF DOOR AT FUNCTION ROOM GROUND FLOOR DUE TO CONFLICT WITH THE FCU. CERCA PHASE 3 T1
GROUND FLOOR KEYPLAN

REMARKS
DCM-ALV-019-15:
• PRSP (Sir Wes) suggest to interchange
left side FCU and glass door. Glass door
will be transom. (06/10/2022)

• As per IDG (Sir Dustin) email sent


FLOOR FLOOR
MOUNTED MOUNTED
dated 06/13/2022, Okay to relocate
FCU FCU and combine pantry room service door
with function room windows.

3D VIEW

AS PER PLAN

SIGN – OFF

PRSP OPEN
DCM-ALV-019-015-003

www.mdc.com.ph
VERIFY DOOR LOCATION AT LOBBY GROUND FLOOR. ARCHITECTURAL AND ENGINEERING DIVISION – BUILDING INFORMATION MODELING DEPARTMENT

AR DOOR IS CONFLICT WITH FLOOR MOUNTED FCU. PROJECT

GROUND FLOOR
FOR VERIFICATION OF DOOR LOCATION AT LOBBY GROUND FLOOR. DOOR LOCATION IS CONFLICT
WITH FLOOR MOUNTED FCU,
CERCA PHASE 3 T1
KEYPLAN

GROUND FLOOR

REMARKS
DCM-ALV-019-15:
• As per IDG (Sir Dustin) follow door
location of ID Plans. (06/10/2022)

• As per IDG (Sir Dustin) email sent


dated 06/13/2022,
-Follow as per MPI FCU layout.
-Provide cladding for ref pipes. We
PRSP PLAN can remove window panel on the
SENT DATED MARCH 22, 2022 conflicted portion only

FLOOR
MOUNTED
FCU

VERIFY DOOR
LOCATION.
CONFLICT WITH FCU

SIGN – OFF
AS PER PLAN 3D VIEW

PRSP OPEN
DCM-ALV-019-015-002
ID BASEPLAN
SENT DATED JUNE 03, 2022 www.mdc.com.ph
VERIFY DOOR LOCATION AT LOBBY GROUND FLOOR. ARCHITECTURAL AND ENGINEERING DIVISION – BUILDING INFORMATION MODELING DEPARTMENT

AR DOOR IS CONFLICT WITH FLOOR MOUNTED FCU. PROJECT

GROUND FLOOR
FOR VERIFICATION OF DOOR LOCATION AT LOBBY GROUND FLOOR. DOOR LOCATION IS CONFLICT
WITH FLOOR MOUNTED FCU,
CERCA PHASE 3 T1
KEYPLAN
GROUND FLOOR

REMARKS

DCM-ALV-019-15:
• As per IDG (Sir Dustin) follow door
location of ID Plans. (06/10/2022)

• As per IDG (Sir Dustin) email sent


dated 06/13/2022,
-Follow as per MPI FCU layout.
-Provide cladding for ref pipes. We
can remove window panel on the
conflicted portion only

AS PER PLAN
SIGN – OFF

PRSP OPEN
DCM-ALV-019-015-004

3D VIEW www.mdc.com.ph
ARCHITECTURAL AND ENGINEERING DIVISION – BUILDING INFORMATION MODELING DEPARTMENT

AR FCU LOCATION AT ELEVATOR LOBBY.


PROJECT

GROUND FLOOR FOR VERIFICATION OF LOCATION OF FLOOR MOUNTED FCU AT ELEVATOR LOBBY. CERCA PHASE 3 T1
GROUND FLOOR KEYPLAN

REMARKS
DCM-ALV-019-15:
• As per IDG (Sir Dustin) FCU location at
elevator lobby is okay, check if ref pipe
can pass thru slab. Might provide
console table or potted plants. IDG for
study. (06/10/2022)

FLOOR • As per IDG (Sir Dustin) email sent


MOUNTED dated 06/13/2022,
FCU
-Follow as per MPI FCU layout.
-Follow window as per AR intent
AS PER PLAN -Option 1 – Check if we can have ref
pipes pass through the slab instead
to retain glass window intent
-Option 2 – If not possible, wall off
conflicted window panel.

3D VIEW
SIGN – OFF

PRSP OPEN
DCM-ALV-019-015-003
MPI PLAN
SENT DATED JUNE 01, 2022 www.mdc.com.ph
ARCHITECTURAL AND ENGINEERING DIVISION – BUILDING INFORMATION MODELING DEPARTMENT

AR FCU LOCATION AT ELEVATOR LOBBY.


PROJECT

GROUND FLOOR FOR VERIFICATION OF LOCATION OF FLOOR MOUNTED FCU AT ELEVATOR LOBBY. CERCA PHASE 3 T1
GROUND FLOOR KEYPLAN

REMARKS
DCM-ALV-019-15:
• As per IDG (Sir Dustin) FCU location at
elevator lobby is okay, check if ref pipe
can pass thru slab. Might provide
console table or potted plants. IDG for
study. (06/10/2022)

• As per IDG (Sir Dustin) email sent


FLOOR
MOUNTED dated 06/13/2022,
FCU -Follow as per MPI FCU layout.
-Follow window as per AR intent
-Option 1 – Check if we can have ref
pipes pass through the slab instead
to retain glass window intent
-Option 2 – If not possible, wall off
conflicted window panel.

3D VIEW
SIGN – OFF

PRSP OPEN
AS PER PLAN DCM-ALV-019-015-005

www.mdc.com.ph

You might also like