SAND - FILLED BOREHOLE SAND - FILLED BOREHOLE COLUMN COLUMN

-0.800 -0.800 -0.800 -0.800


-1.800 -1.800 -1.800 -1.800
GW GW GW GW

-4.500 -4.500
GW

500
-7.800
GW

500
CUT OFF

GW: GROUND WATER LEVEL

STEP 1 : INSTALL D-WALL STEP 2 : EXCAVATE 1ST TIME STEP 4 : DROP DOWN GW LEVEL, EXCAVATE 2ND TIME STEP 6 : DROP DOWN GW LEVEL, EXCAVATE 3RD TIME
INSTALL BORED PILE AND KINGPOST BƯỚC 2 : ĐÀO ĐẤT LẦN 1 BƯỚC 4 : HẠ NƯỚC NGẦM, ĐÀO ĐẤT LẦN 2 BƯỚC 6 : HẠ NƯỚC NGẦM, ĐÀO ĐẤT LẦN 3

BƯỚC 1 : THI CÔNG TƯỜNG VÂY STEP 3 : CONSTRUCT GROUND FLOOR STEP 5 : CONSTRUCT BASEMENT FLOOR B1 STEP 7 : CONSTRUCT BASEMENT FLOOR B2
THI CÔNG CỌC NHỒI VÀ KINGPOST BƯỚC 3 : THI CÔNG SÀN TRỆT BƯỚC 5 : THI CÔNG SÀN HẦM B1 BƯỚC 7 : THI CÔNG SÀN HẦM B2

-0.800 -0.800 -0.800


-1.800 -1.800 -1.800
GW GW GW

-4.500 -4.500 -4.500


500

-7.800 -7.800 -7.800


3000

3000
3000

-11.800 GW
-12.900 -12.900
GW
500

-14.900
GW

1000
GW: GROUND WATER LEVEL

STEP 8 : DROP DOWN GW LEVEL, EXCAVATE 4TH TIME STEP 10 : DROP DOWN GW LEVEL, EXCAVATE 5TH TIME STEP 12 : DROP DOWN GW LEVEL, EXCAVATE 5TH TIME
BƯỚC 8 : HẠ NƯỚC NGẦM, ĐÀO ĐẤT LẦN 4 BƯỚC 10 : HẠ NƯỚC NGẦM, ĐÀO ĐẤT LẦN 5 BƯỚC 12 : HẠ NƯỚC NGẦM, ĐÀO ĐẤT LẦN 5

STEP 9 : INSTALL INCLINED STEEL BEAM SUPPORT STEP 11 : CONSTRUCT SUB TANK COVER STEP 13 : CONSTRUCT SUB TANK COVER
BƯỚC 9 : LẮP ĐẶT DẦM THÉP CHỐNG XIÊNG BƯỚC 11 : THI CÔNG SÀN NẮP BỂ NGẦM BƯỚC 13 : THI CÔNG SÀN NẮP BỂ NGẦM

STEP 14 : REMOVE INCLINED SUPPORT


AFTER B3 SLAB CONCRETE ARCHIVE STRENGTH
BƯỚC 14 : THÁO CHỐNG XIÊNG
SAU KHI BÊ TÔNG SÀN HẦM B3 ĐẠT CƯỜNG ĐỘ

Rev Ngày/ Date Nội dung/ Description By Sơ đồ vị trí/ Key Plan: Chủ đầu tư/ Client: Tư vấn thiết kế kiến trúc/ Architecture design consultant: Tư vấn thiết kế kết cấu/ C&S design consultant: Chủ trì/ Design Chief Dự án/ Project: @A1
A 17/08/2018 BASIC DESIGN ICE
C.TY TNHH PTW VIỆT NAM INDOCHINE KHỔNG VIỆT HÙNG
KHU ĐÔ THỊ NAM ĐƯỜNG VÀNH ĐAI 3 Công trình
NHÀ Ở CAO TẦNG 5CT2
NEW URBAN SOUTHERN BELT ROAD NO.3
Building:
PTW VIET NAM CO.,LTD ENGINEERING VIET NAM Thiết kế/ Designer
L5, Han-Viet Tower, 203 Minh Khai Street, Tel: (84-4) 39744 252 Unit 12-01. Pearl Plaza, 561A Dien Bien Phu Tel: (84-8) 3512 4100 HIGH-RISE RESIDENTIAL TOWER 5CT2
Hai Ba Trung District, Hanoi City, Vietnam. Fax:(84-4) 39744 255 Street,Binh Thanh Dictrict, HCMC, Viet Nam Fax:(84-4) 3512 4108 PHƯỜNG ĐẠI NAM, QUẬN HOÀNG MAI VÀ XÃ THANH LIỆT, HUYỆN THANH TRÌ, HÀ NỘI, VIỆT NAM
PHẠM ANH TUẤN DAI NAM WARD, HOANG MAI DICTRICT, AND THANH LIET WARD, THANH TRI TOWN, HA NOI, VIET NAM Tỷ lệ Phát Hành 17/08/2018
Thể hiện/ Drawn by: DWG Title/
Scale: 1 : 150 @A1 Plot Date:

Tên bản vẽ: Số Hiệu/ Mã dự án Hiệu chỉnh

Tháp The Manor – Đường Mễ Trì, Phường Mỹ Đình 1,


PHAN HÙNG VŨ
TRÌNH TỰ CHỈ ĐỊNH THI CÔNG SEMI - TOP DOWN
Dwg No:
S - 2010 Job No: E115 Revision No.
A
Quận Nam Từ Liêm, Hà Nội, Việt Nam Phê duyệt/ Approved By: Giai đoạn/
The Manor Tower, Me Tri Road, My Dinh 1 Ward,
TỔNG GIÁM ĐỐC / TỔNG GIÁM ĐỐC / Status: HỒ SƠ THIẾT KẾ CƠ SỞ
Nam Tu Liem District, Hanoi, Vietnam
Tel: (+84)4 3794 8888; Fax: (+84)43794 0537 GENERAL DIRECTOR : HENRIK FOLKAR GENERAL DIRECTOR : CARL GAY WARREN GOODIE SEMI-TOP DOWN INDICATIVE CONS. SEQUENCE BASIC DESIGN

C:\Users\phuckha\WORK\REVIT LOCAL\E115\180809\ICE_E115_The Manor Central Park_2019_5CT2_khaphuc.rvt


LEGEND
CHÚ THÍCH

GS1
1 2 3 4 5 6 7 8 9 PROPOSED GROUND SETTLEMENT CHECK POINT (GS1 - GS4)
MỐC ĐO LÚN DỰ KIẾN (GS1 - GS4)
S1 GS1

A 1. CONCRETE STRENGTH
LOCATIONS OF INCLINOMETER TUBES PROVIDED FOR FULL
LENGTH OF D-WALL Ø70
CẤP ĐỘ BỀN BÊ TÔNG: VI TRÍ NHỮNG ỐNG ĐO ĐỘ NGHIÊNG ĐƯỢC CUNG CẤP CHO TOÀN
TYPICAL D-WALL PANEL - REFER TO GENERAL NOTES SHEET 1 BỘ CHIỀU DÀI CỦA TƯỜNG VÂY Ø70
REFER S - 2012 - THAM KHẢO GHI CHÚ CHUNG TỜ 1

2. PROPERTIES FOR ALL REINFORCEMENT SHOULD BE AS FOLLOWS:


ĐẶC TÍNH CƯỜNG ĐỘ CỐT THÉP:
- REFER TO GENERAL NOTES SHEET 1 PROPOSED STANDPIPE PIEZOMETERS
ỐNG ĐỨNG ĐO ÁP LỰC VÀ CAO ĐỘ MỰC NƯỚC NGẦM
B - THAM KHẢO GHI CHÚ CHUNG TỜ 1

3. MINIMUM COVERAGE OF REBAR :


CHIỀU DÀY LỚP BÊ TÔNG BẢO VỆ CỐT THÉP TƯỜNG VÂY:
- REFER TO GENERAL NOTES SHEET 1
- THAM KHẢO GHI CHÚ CHUNG TỜ 1

4. LAPPING OF BARS MUST BE HELD TOGETHER WITH TIE WIRE IN A HALF AND THE REST ARE
OVERLAPPED EITHER WITH U-BOLT OR WEDLING
C TẤT CẢ CÁC MỐI NỐI THÉP DỌC PHẢI ĐẢM BẢO 50% NỐI BUỘC VÀ 50% NỐI CÓC HOẶC NỐI HÀN.

GS2 5. THE CONTRACTOR HAS TO MAKE EXCAVATION PROCEDURE REPORT AND BASEMENT
CONSTRUCTION METHOD REPORT. THE DRAWINGS AND METHOD STATEMENTS HAVE TO BE
S4 APPROVED BY EMPLOYER 'S REPRESENTATIVE
NHÀ THẦU PHẢI LẬP THIẾT KẾ VÀ BIỆN PHÁP THI CÔNG HỐ ĐÀO, TẦNG HẦM. BẢN VẼ CHI TIẾT VÀ BIỆN
D PHÁP THI CÔNG PHẢI ĐƯỢC TRÌNH VÀ PHÊ DUYỆT BỞI BAN QLDA TRƯỚC KHI TIẾN HÀNH THI CÔNG.
GS4
S2 S6 6. THE CONTRACTOR HAS TO MAKE THE METHOD STATEMENT TO ENSURE THAT THE EXCAVATION
WORKS DO NOT AFFECT BUILDINGS NEARBY
E NHÀ THẦU PHẢI LẬP THIẾT KẾ BIỆN PHÁP THI CÔNG ĐỂ KHÔNG ẢNH HƯỞNG ĐẾN CÔNG TRÌNH LÂN
S5 CẬN TRONG QUÁ TRÌNH ĐÀO ĐẤT VÀ THI CÔNG NGẦM.

7. THE CONTRACTOR HAS TO OBSERVE THE DIAPHRAGM WALL CONSTRUCTION WORKS TRICKLY AND
REPORT THE DIAPHRAGM WALL CONSTRUCTION WORKS TO EMPLOYER 'S REPRESENTATIVE
TRONG SUỐT QUÁ TRÌNH THI CÔNG NHÀ THẦU CẦN KIỂM TRA THEO DÕI VÀ BÁO CÁO VỀ TÌNH TRẠNG
THI CÔNG TƯỜNG VÂY.

F 8. THE CONTRACTOR HAS TO INVESTIGATE LOCATION AND ELVEVATION OF BUILDING SURROUNDING


BEFORE THE CONSTRUCTION. THEO CONTRACTOR HAS TO OBSERVE THAT LOCATION AND THAT
ELEVATION DURING THE CONSTRUCTION. THE METHOD AND PROCEDURE OF OBSERVATION MUST BE
APPROVED BY EMPLOYER 'S REPRESENTATIVE BEFORE THE CONSTRUCION.
NHÀ THẦU PHẢI KHẢO SÁT VỊ TRÍ VÀ CAO TRÌNH CỦA CÁC CÔNG TRÌNH LIỀN KỀ TRƯỚC KHI THI CÔNG.
NHÀ THẦU PHẢI THEO DÕI KIỂM TRA VỊ TRÍ VÀ CAO TRÌNH ĐÓ TRONG SUỐT QUÁ TRÌNH THI CÔNG.
PHƯƠNG PHÁP, QUY TRÌNH THEO DÕI PHẢI ĐƯỢC ĐỆ TRÌNH VÀ PHÊ DUYỆT CỦA BAN QLDA TRƯỚC
KHI THI TIẾN HÀNH THI CÔNG.

G 9. THE CONTRACTION HAS TO INSTALL INCLINOMETER DEVICES TO BROWSE THE MOVEMENT OF


DIAPHRAGM WALL PANEL AT LOCATION INDICATED BY CONSULTANT. IN ANY CASE, THE CHANGE OF
INDICATED LOCATION MUST BE APPROVED BY CONSULTANT AND EMPLOYER 'S REPRESENTATIVE
GS3 NHÀ THẦU PHẢI ĐẶT SẴN THIẾT BỊ ĐO ĐỘ NGHIÊNG ĐỂ THEO DÕI CHUYỂN VỊ CỦA TƯỜNG THEO ĐÚNG
S3
VỊ TRÍ MÀ THIẾT KẾ CHỈ ĐỊNH TRONG HỒ SƠ NÀY. TRƯỜNG HỢP NHÀ THẦU CÓ ĐỀ XUẤT VỊ TRÍ KHÁC
THÌ PHẢI TRÌNH TƯ VẤN THIẾT KẾ VÀ BQLDA DUYỆT TRƯỚC KHI THI CÔNG.

10. THE CONTRACTOR HAS TO KEEP UNDERGOUND WATER OUT OF THE BASEMENTS IN EXCAVATION

DIAPHGRAM WALL - LAYOUT PLAN AND BASEMENT CONSTRUCTION AS WELL AS IN SERVICEABLE STAGE.
NHÀ THẦU PHẢI ĐẢM BẢO NƯỚC NGẦM KHÔNG ĐƯỢC NGẤM VÀO CÔNG TRÌNH TRONG TRÌNH THI
CÔNG SÀN HẦM VÀ GIAI ĐOẠN SỬ DỤNG.
SCALE: 1 : 200
11. THE CONTRACTOR HAS TO INSTALL WATERSTOP PANEL TO COMPLY WITH THE REGULATION.
NHÀ THẦU PHẢI ĐẶT TẤM CÁCH NƯỚC ĐÚNG THEO QUY ĐỊNH.

12. THE CONTRACTOR HAS TO COMPLY WITH THE TECHNICAL DOCUMENTATION APPROVED BY
EMPLOYER 'S REPRESENTATIVE IN INSTALLATION OF THE DIAPHRAGM WALL AND DEWATERING
NHÀ THẦU PHẢI THI CÔNG TƯỜNG VÂY VÀ CẮT NƯỚC THEO ĐÚNG HỒ SƠ KỸ THUẬT ĐƯỢC BAN QLDA
DUYỆT.

13. THE HEIGHT OF CAPPING BEAM VARIES THROUGHOUT THE GROUND FLOOR LEVEL
CHIỀU CAO DẦM MŨ THAY ĐỔI THEO CAO ĐỘ TẦNG TRỆT.

14. DIAPHRAGM WALL'S LOCATION IS BAESED ON THE ARCHITECTURAL DRAWING. BEFORE


INSTALLING DIAPHRAHM WALL, CONTRACTOR SHOULD COMPARE THE LOCATION TO ARCHITECTURAL
DOCUMENTATATION
ĐỊNH VỊ TƯỜNG VÂY ĐƯỢC XÁC ĐỊNH THEO BẢN VẼ KIẾN TRÚC. CÔNG TRƯỜNG CẦN KIỂM TRA LẠI SO
VỚI HỒ SƠ KIẾN TRÚC TRƯỚC KHI THI CÔNG.

15. EXSITING GROUND LEVEL IS +6.700M ACCORDING TO NATIONAL ELEVATION ASSOCIATES


WITH -0.800 ELEVATION IN ARCHITECTURAL DRAWINGS. THE CONTRACTOR CAN ADJUST THE
FREQUENCY REVIEW LEVELS DIMENSION OF (*) TO BE SUITABLE TO THE EXISTING GROUND LEVEL IN THE CONSTRUCTION SITE.
CAO ĐỘ MẶT ĐẤT TỰ NHIÊN HIỆN TRẠNG +6.700M THEO CAO ĐỘ QUỐC GIA TƯƠNG ỨNG VỚI CAO
INSTRUMENT ĐỘ -0.800M TRONG BẢN VẼ KIẾN TRÚC. TÙY THEO CAO ĐỘ MẶT ĐẤT TỰ NHIÊN HIỆN TRẠNG MÀ CÔNG
BACKFILLING & TRƯỜNG CHỦ ĐỘNG ĐIỀU CHỈNH KÍCH THƯỚC (*) CHO PHÙ HỢP.
DWALL / PILLING EXCAVATION SUPPER ALERT VALUE 1ST ACTION VALUE 2ND ACTION VALUE
STRUCTURE 17. DIAPHRAGM WALL PANELS ARE INSTALLED WITH SONIC TUBE ENTIRELY. A QUATRER OF WHOLE
AMOUNT OF PANEL ARE MADE SONIC TEST
ĐỀ XUẤT ĐẶT ỐNG SIÊU ÂM 100% TỔNG SỐ PANEL TƯỜNG VÂY. SỐ LƯỢNG PANEL ĐƯỢC THỰC HIỆN
THÍ NGHIỆM SIÊU ÂM LÀ 25% TỔNG SỐ PANEL TƯỜNG VÂY. THÍ NGHIỆM ĐƯỢC TIẾN HÀNH NGẪU
INCLINOMETER 2 x WEEKLY 1 x DAILY 1 x WEEKLY 85MM 115MM 130MM
NHIÊN.

18. ALL DIMENSIONS ARE IN MILLIMETER. ELEVATIONS ARE IN METER UNLESS OTHER NOTES.
TẤT CẢ KÍCH THƯỚC ĐƯỢC THỂ HIỆN THEO ĐƠN VỊ mm. CAO ĐỘ THEO ĐƠN VỊ m. NGOẠI TRỪ CÓ GHI
PIEZOMETER 2 x WEEKLY 1 x DAILY 1 x WEEKLY - 435KPa - CHÚ KHÁC.

BUILDING
SETTLEMENT 2 x WEEKLY 1 x DAILY 1 x WEEKLY 20MM 25MM 30MM
MAKER

TILT MAKER 2 x WEEKLY 1 x DAILY 1 x WEEKLY L/600 L/550 L/500

L : CHIỀU DÀI NHÀ LIỀN KỀ / LENGTH OF ADJACENT HOUSE

• CHUYỂN VỊ NGANG CHO PHÉP CỦA TƯỜNG VÂY TẠI KHU VỰC TRỐNG TRẢI ĐƯỢC CHỌN 0.5% H. H LÀ CHIỀU SÂU ĐÀO
ALLOWABLE HORIZONTAL DISPLACEMENT OF DWALL AT EMPTY AREA IS CHOOSEN BY 0.5% H. H IS DEEP OF EXCAVATION

• TRƯỜNG HỢP GIÁ TRỊ HÀNH ĐỘNG : NHÀ THẦU THÔNG BÁO ĐẾN TƯ VẤN THIẾT KẾ ĐỂ XÁC ĐỊNH BIỆN PHÁP GIA CƯỜNG
INCASE ACTION VALUES : CONSTRUCTOR NOTIFIES DESIGNER TO DETERMINE STRENGTHENING OPTIONS

Rev Ngày/ Date Nội dung/ Description By Sơ đồ vị trí/ Key Plan: Chủ đầu tư/ Client: Tư vấn thiết kế kiến trúc/ Architecture design consultant: Tư vấn thiết kế kết cấu/ C&S design consultant: Chủ trì/ Design Chief Dự án/ Project: @A1
A 17/08/2018 BASIC DESIGN ICE
C.TY TNHH PTW VIỆT NAM INDOCHINE KHỔNG VIỆT HÙNG
KHU ĐÔ THỊ NAM ĐƯỜNG VÀNH ĐAI 3 Công trình
NHÀ Ở CAO TẦNG 5CT2
NEW URBAN SOUTHERN BELT ROAD NO.3
Building:
PTW VIET NAM CO.,LTD ENGINEERING VIET NAM Thiết kế/ Designer
L5, Han-Viet Tower, 203 Minh Khai Street, Tel: (84-4) 39744 252 Unit 12-01. Pearl Plaza, 561A Dien Bien Phu Tel: (84-8) 3512 4100 HIGH-RISE RESIDENTIAL TOWER 5CT2
Hai Ba Trung District, Hanoi City, Vietnam. Fax:(84-4) 39744 255 Street,Binh Thanh Dictrict, HCMC, Viet Nam Fax:(84-4) 3512 4108 PHƯỜNG ĐẠI NAM, QUẬN HOÀNG MAI VÀ XÃ THANH LIỆT, HUYỆN THANH TRÌ, HÀ NỘI, VIỆT NAM
PHẠM ANH TUẤN DAI NAM WARD, HOANG MAI DICTRICT, AND THANH LIET WARD, THANH TRI TOWN, HA NOI, VIET NAM Tỷ lệ Phát Hành 17/08/2018
Thể hiện/ Drawn by: DWG Title/
Scale: As indicated @A1 Plot Date:

Tên bản vẽ: Số Hiệu/ Mã dự án Hiệu chỉnh

Tháp The Manor – Đường Mễ Trì, Phường Mỹ Đình 1,


PHAN HÙNG VŨ Dwg No:
S - 2011 Job No: E115 Revision No.
A
Quận Nam Từ Liêm, Hà Nội, Việt Nam Phê duyệt/ Approved By: Giai đoạn/
The Manor Tower, Me Tri Road, My Dinh 1 Ward,
TỔNG GIÁM ĐỐC / TỔNG GIÁM ĐỐC / Status: HỒ SƠ THIẾT KẾ CƠ SỞ
Nam Tu Liem District, Hanoi, Vietnam
Tel: (+84)4 3794 8888; Fax: (+84)43794 0537 GENERAL DIRECTOR : HENRIK FOLKAR GENERAL DIRECTOR : CARL GAY WARREN GOODIE DIAPHRAGM WALL LAYOUT PLAN BASIC DESIGN

C:\Users\phuckha\WORK\REVIT LOCAL\E115\180809\ICE_E115_The Manor Central Park_2019_5CT2_khaphuc.rvt


EARTH SIDE 2T14 - 125
PHÍA ĐẤT D1
PHÍA ĐÀO 800 PHÍA ĐẤT
SITE
EXCAVATION SIDE EARTH SIDE -800

GUIDE WALL
DWALL REINFORCEMENT
SITE
-800 Mark Comments

800
B1 7T14 - 150
C1 A1 T25 - 150
Basement 1
-4500 A2 2T40 - 150
EXCAVATION SIDE
A3 T40 - 150
A1 Basement 1 PHÍA ĐÀO A4 T32 - 150
8000

8000
-4500 2800
B1 T25 - 150
?

Basement 2
B2 T40 - 150
-7800 B3 T40 - 150
A TYPICAL D-WALL SECTION 1 B4 2T28 - 150
1 : 20
Basement 2 B5 T25 - 150
-7800 C2 3T14 - 125
L.L

L.L
?
Basemnet 3 - Mezz 2T14 - 125
EXCAVATION SIDE
A A -10500 PHÍA ĐÀO D2
C3 3T14 - 200
S - 2012 S - 2012 D1 7T14 - 150
D2 7T14 - 125
Basemnet 3 - Mezz Basement 3 D3 7T14 - 150
-10500
C2 -12900
B2 D4 7T14 - 150

800
8700

A2 9000
Basement 3
-12900 ?
?

-15000 EARTH SIDE


PHÍA ĐẤT NOTES:
2800
L.V : LENGTH VARIES OF MAIN REINFORCEMENT
L.L

B B
L.L

S - 2012 S - 2012 B TYPICAL D-WALL SECTION 2


1 : 20

EXCAVATION SIDE
PHÍA ĐÀO D3 2T14 - 125
A3
11700

11700

800
B3
?

46500

EARTH SIDE
PHÍA ĐẤT 2800
?

-26700
C TYPICAL D-WALL SECTION 3
L.L

L.L

1 : 20

C C
S - 2012 S - 2012

EXCAVATION SIDE 2T14 - 125


PHÍA ĐÀO D4
?

C3
B4
L.V
11700

800
-33000
?

EARTH SIDE
PHÍA ĐẤT
A4
L.L

2800
L.L

D TYPICAL D-WALL SECTION 4


1 : 20
11700
L.V

B5
?

A5 D D
S - 2012 S - 2012

-46500
?

DWALL SIDE SECTION BRACING LAYOUT BR1 BRACING LAYOUT BR2


SCALE: 1 : 100 SCALE: 1 : 100 SCALE: 1 : 100
Rev Ngày/ Date Nội dung/ Description By Sơ đồ vị trí/ Key Plan: Chủ đầu tư/ Client: Tư vấn thiết kế kiến trúc/ Architecture design consultant: Tư vấn thiết kế kết cấu/ C&S design consultant: Chủ trì/ Design Chief Dự án/ Project: @A1
A 17/08/2018 BASIC DESIGN ICE
C.TY TNHH PTW VIỆT NAM INDOCHINE KHỔNG VIỆT HÙNG
KHU ĐÔ THỊ NAM ĐƯỜNG VÀNH ĐAI 3 Công trình
NHÀ Ở CAO TẦNG 5CT2
NEW URBAN SOUTHERN BELT ROAD NO.3
Building:
PTW VIET NAM CO.,LTD ENGINEERING VIET NAM Thiết kế/ Designer
L5, Han-Viet Tower, 203 Minh Khai Street, Tel: (84-4) 39744 252 Unit 12-01. Pearl Plaza, 561A Dien Bien Phu Tel: (84-8) 3512 4100 HIGH-RISE RESIDENTIAL TOWER 5CT2
Hai Ba Trung District, Hanoi City, Vietnam. Fax:(84-4) 39744 255 Street,Binh Thanh Dictrict, HCMC, Viet Nam Fax:(84-4) 3512 4108 PHƯỜNG ĐẠI NAM, QUẬN HOÀNG MAI VÀ XÃ THANH LIỆT, HUYỆN THANH TRÌ, HÀ NỘI, VIỆT NAM
PHẠM ANH TUẤN DAI NAM WARD, HOANG MAI DICTRICT, AND THANH LIET WARD, THANH TRI TOWN, HA NOI, VIET NAM Tỷ lệ Phát Hành 17/08/2018
Thể hiện/ Drawn by: DWG Title/
Scale: As indicated @A1 Plot Date:

Tên bản vẽ: Số Hiệu/ Mã dự án Hiệu chỉnh

Tháp The Manor – Đường Mễ Trì, Phường Mỹ Đình 1,


PHAN HÙNG VŨ
CHI TIẾT ĐIỂN HÌNH TƯỜNG VÂY
Dwg No:
S - 2012 Job No: E115 Revision No.
A
Quận Nam Từ Liêm, Hà Nội, Việt Nam Phê duyệt/ Approved By: Giai đoạn/
The Manor Tower, Me Tri Road, My Dinh 1 Ward,
TỔNG GIÁM ĐỐC / TỔNG GIÁM ĐỐC / Status: HỒ SƠ THIẾT KẾ CƠ SỞ
Nam Tu Liem District, Hanoi, Vietnam
Tel: (+84)4 3794 8888; Fax: (+84)43794 0537 GENERAL DIRECTOR : HENRIK FOLKAR GENERAL DIRECTOR : CARL GAY WARREN GOODIE DIAPHRAGM WALL TYPICAL DETAIL BASIC DESIGN

C:\Users\phuckha\WORK\REVIT LOCAL\E115\180809\ICE_E115_The Manor Central Park_2019_5CT2_khaphuc.rvt

You might also like