Evaluation of Operational and Maintenance of Clean Water, Wastewater,

Vent, Rain Water, and Firefighting Plumbing Systems at Atria Residence


Gading Serpong
Joshua Nathan1 and Ahmad Soleh Setiyawan, S.T., M.T., Ph.D.2
Environmental Infrastructuce Engineering Study Program
Faculty of Civil and Environmental Engineering, Bandung Institute of Technology,
Jl. Raya Jatinangor Km 20,75 Sumedang 45363
1
popochpopoch@gmail.com and 2ahmad_setiyawan@ftsl.itb.ac.id

Abstract. Atria Residence is a commercial building consisting of hotels and apartments whose operations and
maintenance are managed by PT. Parador Property Management. To support the operation and maintenance of
the building, a plumbing system is needed that is managed in accordance with various standard criteria along with
applicable SOPs so that it needs to be evaluated periodically. The purpose of this practical work is to understand
the operation and maintenance of plumbing systems for clean water, waste water, vents, rainwater, and fire
fighting in a multi-storey building. The results of the evaluation of the clean water plumbing system show that the
need for clean water, pump capacity, and reservoir capacity have met the standard, but the maintenance of the
reservoir and transmission system still does not meet the standard. The results of the evaluation of the sewage
plumbing system show that pipe repairs, provision of HSE-worthy equipment, and vector control still do not meet
the standards. The results of the evaluation of the plumbing vent system show that the vent pipe installation has
met the standards, but the schedule for cleaning the vent pipe still needs to be carried out to meet maintenance
standards. The results of the evaluation of the rainwater plumbing system show that the pipe installation has met
the standard, but the inspection mechanism for the submersible pipe and the installation of infiltration wells still
does not meet the standard. The results of the evaluation of the fire extinguishing plumbing system showed that
the pumping and transmission systems had met the standards, but the repair of the yard hydrant components still
did not meet the standards. The evaluation was carried out by referring to the book “Design and Maintenance of
Plumbing Systems” by Soufyan M. Noerbambang and Takeo Morimura, SNI 03-1745-2000, and Regulation of
the Minister of Public Works Number 26/PRT/M/2008. The operation and maintenance of the Atria Residence
plumbing system is quite good but improvements are needed, especially from the aspect of maintaining the
existing system since the installation as a whole has met the standards.

Keywords: Plumbing System, Clean Water, Wastewater, Vent, Rainwater, Fire Fighting, Atria Residence Gading
Serpong.

INTRODUCTION developments between design and


construction along with their maintenance.
Global competition triggers the In this regard, the authors consider that the
development of high-rise building plumbing field is very relevant to the rapid
construction in various countries to drive construction of buildings in urban areas and
the regional economy. The construction of can be used as an evaluation topic in terms
high-rise buildings is inseparable from of system design and maintenance of the
various complementary components such system to minimize potential damage and
as mechanical, electrical, and plumbing increase the sustainability of the plumbing
systems. The construction of plumbing system designed in buildings both
systems in buildings requires engineers to theoretically and practically.
design buildings appropriately, rationally,
and effectively. Competent engineers are
formed with lecture science education and
understanding related to field conditions so
that they can design synergistic

PL-1
EXISTING CONDITION Table 1. Transmission System
Specification.
Atria Residence is a 21 storey
Reservoir Reservoir Pumps Pump’s
apartment and hotel building with an area
Capacity Pressure
of 1550 m² which is managed by PT. Ground 400 m³ Transfer 8 bar
Parador Property Management with a total Tank Pump
of 310 rooms located in the city of Gading Roof Tank 30 m³ Booster 2,2 bar
Serpong, Tangerang, Banten, Indonesia Pump
with a dense commercial infrastructure
environment. PT. Parador Property In Table 1. Transmission System
Management is part of the company and is Specifications, it can be seen that the base
directly responsible to PT. Paramount tank capacity is larger than the roof tank
Enterprise is responsible for the because the roof tank is used only to
construction and management of a distribute water to each floor. The transfer
commercial building located in Gading pump used is a jockey pump with a pressure
Serpong, Tangerang. PT. Parador Property of 8 bar while the booster pump has a
Management was established in 2012 and pressure of 2.2 bar because it only adds
was inaugurated as a PT in 2014. The pressure to the top 3 floors. The capacity of
buildings are managed by PT. Parador the clean water transfer pump is 8 bar,
Property Management such as Atria which is 81.6 meters of vertical water
Residence has been completely completed column, which has met the minimum
and can operate according to its function. requirement of 69.45 meters of building
The technical aspects that are maintained at height. The capacity of the ground water
Atria Residence are managed by the tank and roof tank has exceeded the
General Maintenance field. The scope of theoretical requirement of 275.78 m and
management of the Atria Residence 8.65 m respectively, while the actual
building by technicians in the General conditions are 400 m and 30 m. The flow of
Maintenance field is a plumbing system for clean water from the roof tank to each floor
cold clean water, hot clean water, waste is carried out using a main shaft in the
water, vents, rainwater, fire fighting, building which contains a main pipe for
electrical, mechanical, and building transmission. The pipe is made of GIP and
aesthetic maintenance. the standpipe for distribution is also made
of GIP. The distribution standpipe carries
water up to a horizontal pipe of clean water
ANALYSIS made of PPR on each roof from the floor
and continues to each room unit.
Atria Residence's clean water plumbing The quality of the water collection
system is sourced from PDAM Tirta Kerta system from the source has been tested
Raharja and is accommodated in a ground regularly by the PDAM, even though it is
water tank with 2 compartments. The only on the ground water tank and meets the
collected water is channeled into the roof standards in the Ministry of Health
tank under pressure and flowed to each Regulation no. 492 of 2010 concerning
floor by gravity except the top 3 floors. Drinking Water Quality Requirements
(Ministry of Health of the Republic of
Indonesia, 2010). However, there are
weaknesses, namely the presence of cracks
in the walls of the ground water tank,
leakage through the faucet that is connected
directly to the ground water tank, and the
use of clean water for watering plants. In

PL-2
the clean water drainage system there are of wastewater is carried out completely by
leaks on the UG floor, the loss of the gravity and all types of waste water piping
recirculation pump in the swimming pool, end in the same sewage treatment plant.
there is a lot of rust on the roof tank, there
is rust on the pipes, and technical drawings
that do not match the actual conditions.

Table 2. Clean Water Usage


Source Clean Water Usage
(m³/month)
Existing 2829
Theoritical 7662,6

Figure 1. Sewage Treatment Plant


In Table 2. Clean Water Usage it is
found that the use of clean water in actual The Sewage Treatment Plant (STP)
conditions is smaller than the theoretical is located under the semi-basement floor
use of clean water because most of the which is the lowest elevation of all types of
floors at Atria Residence are hotels that are piping and plumbing equipment so that it
often empty so that water use and its supply does not require pressurized drainage at all.
are much more optimal. Maintenance of the In Figure 1. Sewage Treatment Plant it is
clean water plumbing system in the form of found that the Atria Residence STP
testing water quality is still not optimal Processing uses the activated sludge
because it only tests the quality of the method for processing which is equipped
ground water tank every 3 months without with 2 blower aerators which are controlled
testing the quality of the water in the roof from the STP panel and the processed
tank and piping. The existing technical products have met the standards in
drawings are kept very different from the accordance with PerMen LHK no. 68 of
actual conditions and are not listed on the 2016 (Ministry of Environment of the
dimensions of the piping and other Republic of Indonesia, 2016). The effluent
components so that they cannot be relied on from the STP will flow directly into the city
as an operational reference. Cleaning of drainage channel without being reused as
ground water tanks and roof tanks has not water for watering plants or flushing water.
yet been carried out with the process of Separation of drainage from 3 types
disinfection of officers along with the of waste water categories is effective in
equipment and equipment used beforehand preventing scaling, especially if the drains
so that they are not in accordance with the are combined so that the dirt will be
standards in the Plumbing System Design concentrated in one pipeline. In the
and Maintenance book (Noerbambang & wastewater drainage system, there is a
Morimura, 1984). standpipe for waste water that is not
Atria Residence's sewage plumbing installed according to the standard, namely
system is classified into three, namely used using the funnel principle to drain water so
water, dirty water, and kitchen waste water. that there is an open cavity that can cause
Used water comes from plumbing unpleasant odors or explosions.
equipment such as sinks and floor drains,
dirty water comes from toilets and urinals,
while kitchen waste water comes from
sinks that have been equipped with grease
traps. The used water and dirty water pipes
are made of PVC, while the kitchen waste
water pipes are made of GIP. The drainage

PL-3
Figure 2. Grease Trap Under Sink
In Figure 2. The Grease Trap Under
the Sink it is found that the installation of Figure 3. STP Check
the grease trap on each kitchen sink is in
accordance with the standards in the In Figure 3. The STP inspection
Plumbing System Design and Maintenance found that the sewage treatment plant
book, which is not attached to the wall with inspection had been carried out properly
the grease trap wall made of concrete but due to the inspection being carried out
made of stainless steel (Noerbambang & twice a week even though the book
Morimura, 1984). However, the installation stipulates once every 6 months. The
of the grease trap must be equipped with schedule for the inspection of the sewerage
draining the grease that is accommodated in piping is not specified by the Plumbing
it periodically at least once a month, if it is System Design and Maintenance book
not fulfilled, the water and fat content in the (Noerbambang & Morimura, 1984), but has
grease trap will overflow and cause been checked every night by a technician.
puddles. The Sewage treatment plant uses The inspection of the piping is carried out
an activated sludge system to treat manually and not coordinated with the
wastewater from the plumbing system and reference technical drawings due to the
then flows it into the city's drainage canals. discrepancy between the field conditions
The quality of processed STP is tested and the conditions described on the
every 3 months and the quality is compared technical drawings so that it has the
with the standard in PerMen LHK no. 68 of potential to cause certain piping points to be
2016 concerning domestic wastewater unchecked. Inspection of machines on the
quality standards (Ministry of the sewage plumbing system is carried out with
Environment of the Republic of Indonesia, the same procedure as the inspection of
2016). Some of the problems encountered machines on the clean water plumbing
in this system are the presence of several system. The evaluation of the machine
leaking wastewater pipes in the STP, the inspection is to design a submersible pump
large number of vectors in the STP, and the lift to make it easier for technicians to
mixing of wastewater treatment between inspect directly. STP cleaning is carried out
the 3 types of wastewater classifications. every week 2 times although the book on
The maintenance of the sewage Design and Maintenance of Plumbing
plumbing system was evaluated using the Systems recommends once every 6 months
book Design and Maintenance of Plumbing so that it is optimal in terms of frequency
Systems (Noerbambang & Morimura, (Noerbambang & Morimura, 1984). The
1984). problem with this procedure is that the
availability of equipment and tools for
cleaning workers is very minimal, so that it
endangers the health of the cleaners.

PL-4
The Atria Residence vent plumbing directly to the city drainage while
system uses a wet vent plumbing system pressurized drainage utilizes gutters and
that unites the waste water standpipe with floor drains that drain water to the sump pit
the vent standpipe which is forwarded to and pumped it into the city drainage
the roof of the building to remove excess channel. The problem with this system is
gas. This method will save much more cost that there are images of infiltration wells on
and space, but it will be problematic if there the technical drawings, but in actual
is a problem with the sewage plumbing conditions, rainwater from the sump pit is
system. The effects that can be prevented directly channeled into the city's drainage
from this system include the siphon effect channels.
itself, namely the withdrawal of water Maintenance on this system is
stored in the goose neck of the plumbing scheduled regularly every night by
tool to the waste water standpipe. checking components such as rainwater
standpipes, clamps, and the condition of the
sump pit. Inspections on rainwater piping
components for each room balcony are not
carried out routinely but every time there is
a request from room occupants. Inspection
of damage to the sump pit pump cannot be
done by hand directly but by observation
from afar because there is no pump lifting
pulley so that it can reduce the effectiveness
Figure 4. Exhaust Vent Pipe of pump maintenance. Technical drawings
of the rainwater plumbing system are not
In Figure 4. The Exhaust Vent Pipe
equipped with clear length dimensions and
it is found that the installation of the
are very different when compared to actual
plumbing vent system is also in accordance
conditions. This can hinder the repair
with the standards in the Plumbing System
operation because it will not be in
Design and Maintenance book, which is
accordance with the established reference.
higher than the potential for puddles and 1.5
The Atria Residence fire
meters higher than the highest plumbing
extinguisher plumbing system flows water
device in the system (Noerbambang &
Morimura, 1984). with pressure from a ground water tank
with a volume of 400 m to the sprinkler
Maintenance on this system is not
piping system and the hydrant piping
available because the only countermeasures
system assisted by 3 types of pumps,
carried out by the technician team are pipe
namely jockey pumps, electric pumps, and
repairs if damage is found at night. Based
diesel pumps.
on the book on Plumbing System Design
and Maintenance, pressurized water should
be sprayed into the system to destroy
Table 3. Active Condition of Pump
potential blockages in the system
Against Water Pressure
periodically (Noerbambang & Morimura,
1984). Pump Types Active Condition
The plumbing system of Atria Jockey > 10 bar
Residence rainwater flows by gravity at Electric 8 – 10 bar
elevations above the ground floor while at Diesel < 8 bar
elevations below the ground floor it flows
under pressure. Pipes for gravity drainage In Table 3. Pump Active Condition
are located on the north and south building Against Water Pressure It is found that the
shafts along with the standpipes on each pump will be active alternately depending
balcony of the room and then flowed on the water pressure in the system. The

PL-5
jockey pump is the main pump that is relied for at least 30 minutes (Ministry of Public
on to provide pressure when it has not been Works, 2008). With a half capacity ground
used, the electric pump will be active if water tank that is 200 m and a jockey pump
there is a pressure drop due to the use of a pumping discharge of 45 m/hour, the
hydrant or sprinkler, while the diesel pump supply time is 4.4 hours so that it meets the
will be active if the water pressure drops criteria in the standard. There is a standard
drastically and there is also an electrical regarding the pump room in SNI 03-6570-
death if the fire has spread so that rely on 2001 regarding the installation of fixed
energy from diesel. The piping of the waste pumps installed for fire fighting where the
water plumbing system uses a Galvanized pump room must withstand fire attacks for
Iron Pipe (GIP) type pipe to hold at least 2 hours (National Standardization
pressurized water of 13 bar or equivalent to Agency, 2001). This is filled with pump
130 meters of water column in the sprinkler room wall material, which is thick heat-
and hydrant piping system so that it is ready resistant reinforced concrete. In the same
to release pressurized water in the event of standard it is determined that the pump
a fire in accordance with SNI 03-standard. room must be prevented from flooding and
1745-2000 (National Standardization is proven to be fulfilled by the presence of
Agency, 2000). The fire extinguishing a sump pit in the pump room and the pump
piping system consists of a wet standpipe which is 30 cm above the floor level. Based
for sprinklers and a wet standpipe for on SNI 03-1745-2000 concerning
hydrants, but there is no dry standpipe like procedures for planning and installing
the classification of fire fighting piping in standpipes and hoses for fire prevention in
the Plumbing System Design and houses and buildings, there are various
Maintenance book. The dry pipe contained criteria related to the completeness of
in the system is only a horizontal dry pipe hydrants, namely having hose valves,
connecting the seammese connection with hoses, and nozzles (National
the ground water tank used by fire engines Standardization Agency, 2000). This is met
in the event of a water shortage by indoor hydrants but not met by outdoor
(Noerbambang & Morimura, 1984). hydrants and also very poorly maintained
Based on the book Design and since the hose is disconnected from the
Maintenance of Plumbing Systems, dry valve. At the same standard, Atria
standpipes are mandatory for buildings Residence's sprinklers have met the
with more than 10 meters to provide access standard since on a floor area of 734 m²
to direct water flow to hydrants and there are 2 sprinkler shafts which should
sprinklers on each floor (Noerbambang & have at least 1 sprinkler shaft. Maintenance
Morimura, 1984). of the fire extinguishing plumbing system
was evaluated by Permen PU number 26 of
Table 4. Water Supply for Fire Fighting 2008 and reviewed 5 systems, namely the
piping system, hydrant system, sprinkler
Source Water Supply Capacity
system, ground water tank, and pump room
Existing 4,4 hour
Theoritical 30 minutes (Ministry of Public Works, 2008). Piping
maintenance is carried out every week and
In Table 4. Water Supply for Fire every 3 months checked by the city fire
Fighting, it is found that the water supply department so that it meets the minimum
capacity has met the standards in the standard of once every 3 months. The
Minister of Public Works Regulation maintenance of the hydrant system is not up
number 26 of 2008 concerning the technical to standard as the valve seals should be
requirements for a building fire protection checked weekly but are checked every 3
system which requires the capacity of the months. The maintenance of the sprinkler
water reservoir to be able to provide water system is quite optimal because the

PL-6
inspection is carried out every 3 months Sistem Pipa Tegak Dan Slang
even though the standard is set every 1 year. Untuk Pencegahan Bahaya
The maintenance of the ground water tank Kebakaran Pada Bangunan
follows the evaluation of the clean water Gedung. Badan Standarisasi
plumbing system, which is quite good on Nasional: Jakarta.
schedule but lacks a disinfection process Badan Standarisasi Nasional. 2001. SNI
before cleaning. Inspection of the pump 03-6570-2001. Instalasi Pompa
system is optimal, namely inspection and Yang Dipasang Tetap Untuk
drill run every week according to the Proteksi Kebakaran. Badan
criteria in the standard. Therefore, the Standarisasi Nasional: Jakarta.
evaluation obtained in the maintenance Kementerian Kesehatan Republik
aspect is an increase in hydrant Indonesia. 2010. Peraturan
maintenance and ground water tank Kementerian Kesehatan No. 492
maintenance. Tahun 2010 Tentang Persyaratan
Kualitas Air Minum. Sekretariat
Negara: Jakarta.
CONCLUSION
Kementerian Lingkungan Hidup Republik
Overall the operation and Indonesia. 2016. Peraturan Menteri
maintenance of the Atria Residence Lingkungan Hidup dan Kehutanan
plumbing system is quite good, however, Republik Indonesia Nomor
there are still some things that need to be P.68/Menlhk/Setjen
improved because they do not meet various /Kum.1/8/2016. Sekretariat Negara:
existing standards. The clean water Jakarta.
plumbing system is good enough, but Kementerian Pekerjaan Umum Republik
several aspects such as maintenance of Indonesia. 2008. Peraturan Menteri
ground water tanks, roof tanks, and water Pekerjaan Umum Nomor
quality testing need to be improved. The 26/PRT/M/2008 Tentang
sewage plumbing system is still not good, Persyaratan Teknis Sistem Proteksi
especially in terms of HSE for personnel Kebakaran Pada Bangunan Gedung
equipment, maintenance of standpipes, dan Lingkungan. Sekretariat
STP processing categories, and utilization Negara: Jakarta.
of STP processed products. The vent
Noerbambang, Soufyan & Takeo
system is good but requires the preparation
Morimura. 1984. Perancangan dan
of a scheduled vent pipe maintenance SOP.
Pemeliharaan Sistem Plumbing. PT
The rainwater distribution system is good
Pradnya Paramitha: Jakarta.
enough but requires the construction of
infiltration wells in accordance with the
design and scheduling of the balcony
standpipe maintenance. The fire
suppression system is already very optimal
in terms of installation and overall
maintenance, it just needs to improve
maintenance for outdoor hydrants.