TO: MR. KELVIN ONG


PROJECT: WATERPROOFING PROJECT
LOCATION: 33 DERBY ST, WHITE PLAINS, QUEZON CITY
SUBJECT: QUOTATION FOR LABOR AND MATERIALS
____________________________________________________________________________
We are pleased to present you our best price for the needed for the above-mentioned project:
SCOPE OF WORK
1. General Requirements
1.1 Mobilization/demobilization
1.2 Provision of tools
1.3 Flood testing
1.4 Transportation/food allowance
13,430.00
2. Waterproofing works
2.1 Front and Rear deck
2.1.1 Surface preparation also includes provision and grouting of all-purpose structural epoxy in floor and wall
corner, clearing of debris and other foreign materials and must free from dust for good adhesion of membrane,
chipping of wall 30 cm and half inch depth for front deck 9.4x12.4m and rear deck12.4x5.5m
27,740.00
2.1.2 Supply and application of polyurethane solvent-based waterproofing for front deck 9.4x12.4m and rear
deck12.4x5.5m that includes 30cm high wall applications
332,598.00
2.2 Canopy
2.2.1 Surface preparation also includes provision and grouting of all-purpose structural epoxy in floor and wall
corner, clearing of debris and other foreign materials and must free from dust for good adhesion of membrane,
chipping of wall 30 cm and half inch depth for 3rd floor left and right canopy (2x1.0x33m) 2nd floor sides, front and
rear canopy (2x1x33m and 2x1.0x12.4m) and lower ground right canopy (2.0x9m and 1.5x19m) and front rear
(2x1.0x12.4m)
34,270.00
2.2.2 Supply and application of polyurethane solvent-based waterproofing for 3rd floor left and right canopy
(2x1.0x33m) 2nd floor sides, front and rear canopy (2x1x33m and 2x1.0x12.4m) and lower ground right canopy
(2.0x9m and 1.5x19m) and front rear (2x1.0x12.4m)
410,550.00

PROJECT COST PHP 818,588.00

Upon signing hereof, this instrument shall become a Contract of Agreement between the Contractor and the Client, and
hereby agrees to the Terms and Conditions stated herein:
• The owner/client shall secure all any permit and licenses needed in the project
• Terms of Payment
• 50% down payment before mobilization
• 50% progress billing
• Estimated Date of Completion 7-15 days
• Water & electrical consumption should be provided by the owner/client
• The owner/client shall make the site accessible for any equipment and tools to be used on site
• Quotation is valid for 30 days

1
• We offer a full five (5) years of warranty for our waterproofing. However, damages caused by the force majeure such as earthquake, fire
explosion, lightning, settlement, structural failure and movement of metal work use in conjunction with waterproofing work are not
covered by this guarantee.
• Vat exclusive

Thank you Very much and we are hoping to be part of your project.

Very Truly Yours

Engr. Julius Caesar T. Batilo Jr


General Manager CONFORME:_______________
09171005350/ julsbatilo@gmail.com (Signature over Printed Name)
DATE: __________________________