0% found this document useful (0 votes)
124 views7 pages

Ayat Design Department Structure Overview

This document outlines the organizational structure of Ayat Design Department. It details the personnel and office layout, responsibilities of each design section (architectural, structural, sanitary, electrical), and procedures for design review and checklists. The architectural and structural sections are responsible for reviewing all designs at inception and commenting/approving before construction. They also handle any needed modifications if the original designer is not responsible after final submission.

Uploaded by

Wedesu Eyob
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
124 views7 pages

Ayat Design Department Structure Overview

This document outlines the organizational structure of Ayat Design Department. It details the personnel and office layout, responsibilities of each design section (architectural, structural, sanitary, electrical), and procedures for design review and checklists. The architectural and structural sections are responsible for reviewing all designs at inception and commenting/approving before construction. They also handle any needed modifications if the original designer is not responsible after final submission.

Uploaded by

Wedesu Eyob
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

AYAT DESIGN DEPARTMENT ORGANIZTIONAL STRUCTURE

CONTENTS

1. PERSONNEL AND OFFICE LAYOUT

2. RESPONSIBILTY
2.1 ARCHITECTURAL
2.2 STRUCTURAL
2.3 SANITARY
2.4 ELECTRICAL
2.5 OFFICE ENGINEER

3. PROCEDURES
3.1 ARCHITECTURAL DESIGN REVIEW
3.2 STRUCTURAL DESIGN REVIEW
3.3 SANITARY DESIGN REVIEW
3.4 ELECTRICAL DESIGN REVIEW

4. CHECKLISTS
4.1 ARCHITECTURAL
4.2 STRUCTURAL
4.3 SANITARY DESIGN
4.4 ELECTRICAL DESIGN
1. PERSONNEL AND OFFICE LAYOUT
Ayat design department shall comprise senior Architectural, Structural, Sanitary, Electrical and Office
Engineers with at least one junior engineer under each senior engineer. Senior Drafts person (both
structural and architectural) shall also be part of the department.

Well-equipped office should be allocated to the department and senior members should be provided
with private offices.
2. RESPONSIBILITY
2.1 ARCHITECTURAL DESIGN SECTION:
 Shall involve in every architectural design at inception level
 Shall comment on designs before approval and make sure the design is revised
according to the comments. The design should be submitted for approval only after
Ayat design department agrees on the design’s major concepts.
 Make sure the design has satisfied sales office demands and other unforeseen
conditions before going in to construction.
 If the original agreement mentions the responsibility of the original designer to do
modifications even after final submission, then the responsibility of Ayat design
department shall only be commenting on the submitted design and make sure the
designer has revised the design according to comments.
 However, if the designer is not responsible for any modifications after final submission,
then Ayat design department shall do design modifications. All modifications should
be approved by the design office before going in to construction. If under rare
conditions the designer could not approve the modification but the client decides to
construct it anyway, Ayat design department should not be responsible for any
scenarios that may arise due to this modification.

2.2 STRUCTURAL DESIGN SECTION:


 Shall comment on designs before approval and make sure the design is revised
according to the comments. The design should be submitted for approval only after
Ayat design department agrees on the design’s major concepts.
 Shall make sure reinforcement is optimized before construction.
 If the original agreement mentions the responsibility of the original designer to do
modifications even after final submission, then the responsibility of Ayat design
department shall only be commenting on the submitted design and make sure the
designer has revised the design according to comments.
 However, if the designer is not responsible for any modifications after final submission,
then Ayat design department shall do design modifications. All modifications should
be approved by the design office before going in to construction.
 If under rare conditions the designer could not approve the modification but the client
decides to construct it anyway, Ayat structural design department should not be
responsible for any scenarios that may arise due to this modification.
2.3 SANITARY DESIGN SECTION

2.4 ELECTRICAL DESIGN SECTION

2.5 OFFICE ENGINEERING SECTION