Professional Documents
Culture Documents
Oversea IT CLC Checklist E (I) Rev 2 1
Oversea IT CLC Checklist E (I) Rev 2 1
項 レヘ
Components
objective
番 ゙ル
ambit
要 領 内部統 s of considerations
素 域 制目標 internal / / 考慮すべき事項 (Ver.2.00 Supplementary Edition) 会社の内部統制手続
control No lev
. el
The IT plans aligned business objectives are drawn up and known and the
9 M
1 648557800.xls
拠点名称記入
IT_Company Level Control_Checklist
項 レヘ
Components
objective
番 ゙ル
ambit
要 領 内部統 s of considerations
素 域 制目標 internal / / 考慮すべき事項 (Ver.2.00 Supplementary Edition) 会社の内部統制手続
control No lev
. el
Company Level intent and procedures of IT application management and procedures are
14 L
Monitoring
グ
グ し、必要
な改善を
necessary improvement are addressed.
行う。
内 自己評 内部監査部門は、IT全社統制、IT全 Does the internal audit division carry out its 本社に準拠。
Internal Control Assessment
評 部統制を
価 評価する
。
自己評価や内部監査により、内部統 Are operation of Internal Control assessments 本社に準拠。
制の運用状況を定期的に評価してい performed periodically, using self-assessment
るか? or independent audits.
19 M
2 648557800.xls
Self Check
st
[Status of internal [Status of internal control
Rev.2.1 control design] operation]
○:Execution Evidence
Actual Internal Control 関連資料 Related documents
○:Execution ×:Deficiency An evaluation Management No.
×:Deficiency N/A reason (attach copies of
evidence)
IT manager makes "System Outline" and carries System Outline System Outline no related form
out management. provided, only
1. Person in charge of the IT system and data. maintained
2. Person in charge of the duties about the IT securely in
system.
×:Deficiency ×:Deficiency sharing folder
only accesible by
certain user
(protected by
password)
A role and the responsibility of an IT manager ①Job Description-IT ①Job Description- no internal IT,
and the IT person in charge list it in "Job Director(Manager) IT now in process
Description". ②Job Description-IT Director(Manager) of outsourcing
Structure to understand in "Job Description." Staff ②Job Description- ×:Deficiency for IT service
IT Staff
○:Execution ITCLC-02
3 648557800.xls
Self Check
st
[Status of internal [Status of internal control
Rev.2.1 control design] operation]
○:Execution Evidence
Actual Internal Control 関連資料 Related documents
○:Execution ×:Deficiency An evaluation Management No.
×:Deficiency N/A reason (attach copies of
evidence)
When a serious obstacle and accident occur, the 不具合原因・対策報 Data System immediate action
IT manager publishes "Data System Related 告書 Related Incident of incident
Incident Report" and, with the approval of the Report ×:Deficiency
solving was done
person in charge, wrestles for investigation and by verbally
measures improvement caused by the fact.
(Except for"SAP System" ,IT Manager publishes without relates
"Data System Related Incident Report".) N/A document
4 648557800.xls
Checked day:
①
E
(
J
)
主
導
の
研
修
の
場
合
は
、
E
(
J
)
事
務
局
へ
完
了
報
告
を
し
て
い
る
か
確
認
。
②
E 5 648557800.xls
(
J
)
Checked day:
6 648557800.xls
IT_Company Level Control_Checklist
2.00 Jul 15,2011 CLC_Check List E(J) Finance & K.Hoshino A review by the introduction of the SAP system.
Accounting Dept.
2.10 Jan 10,2012 CLC_Check List E(J) R.sanagi Add supplementary explanation to No17