Professional Documents
Culture Documents
A RD.
Cooling Load Estimate
MANIL
Gen Artemio CFM Cooling Capacity
Total Total Floor
Ricarte Senior Room
Btu/h TOR Area, ft2
Infiltration Ventilation Lightings People Appliances Solar
High School BIL- LOCA
Bil-loca Classroom 70 600 4621.16 18000 1944.60 10130.11 54692.83 4.57 678.2
Hwy
Elementary
rthur
School
McA
Air Conditioning Unit
d.
Electrical Characteristics
NR Designation Location Qty Description Rated Cooling Load, Btu/h Remarks
nila
koppel
ACU 5 As Shown 5.0 TOR Split Type-Floor Mounted 60,000 3700 (5) model: KPC-60IH0A
1 208-230/3/60
Inverter Air Conditioning Unit
To Batac City
HE
SHE FL-3
FL-3 NOTES
CLASSROOM CLASSROOM 7000.0000
FL-3 FL-3
GENERAL NOTES
THIRD FLOOR PLAN 4
2 1:200 meters
FROM THE OFFICE OF: PROFESSIONAL MECHANICAL ENGINEER: PROJECT TITLE: CONFORME: APPROVED BY: SHEET CONTENTS: SHEET NO:
VICINITY MAP
NATHANIEL ERICSON R. MATEO ELIZA G. VILLARIN THIRD FLOOR PLAN
RHENZ D. MEDINA PROFESSIONAL MECHANICAL ENGINEER MECHANICAL PLAN OF OF A DX DIRECTOR, UNIVERSITY LIBRARY SYSTEM SCHEDULE OF EQUIPMENT
GEENRAL NOTES
M-1
BRGY. 45 TANGID, LAOAG CITY, ILOCOS NORTE, 2900
PRC NO.: 0004893 AIR CONDDITIONING SYSTEM RECOMMENDING APPROVAL:
EMAIL ADDRESS: znehr.medina58@gmail.com PTR.: 0035353 Drawings and specifications and other contract documents duly signed, stamped or sealed, as instruments of
CP NUMBER: +639562266876 SHIRLEY C. AGRUPIS service, are the intellectual property and documents of the architect, whether the object for which they are made
PLACE ISSUED: CITY OF BATAC UNIVERSITY, PRESIDENT is executed or not. It shall be unlawful for any person to duplicate or to make copies of said documents for use
in the repetition of and for other project or building, whether executed party or in whole, without the written
DATE: FEBRUARY 22, 2023 ROMEO R. DULDULAO
TIN: 212-537-741 LOCATION: BRGY. BIL-LOCA, CITY OF BATAC, ILOCOS NORTE DIRECTOR, PPDO