IWT Sector- Construction of a Lock cum bridge across Badagara Mahe canal at Karingali mukku
in Kozhikkode District.
(Cost Index Applied for this estimate is 32.04%)
1 12.1.B.1
Earth work in excavation of foundation of structures as per drawing and technical specification, including
setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing
of sides and bottom and backfilling with approved material.
Ordinary Soil - Depth upto 3m - Mechanical Means
2 od41706/2019_2020/IA
Irrigation
:RING BUND - Putting up ring bund using driving Z type MS sheet piles of 12 m height(400x185x7.5/8.5
PRICE
or equivalent -confirming to IS 2314-1986) on one side driven with minimum driving length of 6m for
ensuring sufficient anchorage and horizontally braced with MS flats and angles wherever necessary and
the other side with coconut piles 6 to 9 m length driven 4.5 m as shown in figure, tied with halfsplit
coconut piles as wailing piece at 1 m c/c and filled in between with empty gunny /polythene bags
filledwith earth are placed bottom width 3.5m and top width 2m and 6 m height, and including dismantling
the bund, driven out sheet pile after completion of the work etc complete as directed by the departmental
officers at site. (Data from PRICE estimate ID 2016/997/IA for Reconstruction of Navigational
Lockat<br>Thrikkunnapuzha)
5 m extra
across canal 2 46.000 92.000 on either
side
70+(2*11.
65)+8.00d/
s+3.00u/s
along the canal on
2 114.300 228.600 +5
either side
.00+5.00
m( either
side
3 12.22
Providing Steel Liner 10mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and
Setting out as per Detailed Drawing.
Piling
platform at
+ 1.30; as
for abutment 2*12 12.800 3.14*1.00 0.006 7.85 45.434 per bore
hole
11.50+1.3
0=12.80.
depths as
per Bore
Bank side pier -left 6 18.000 3.14*1.20 0.006 7.85 19.168 hole are
18.38/
18.10;
depths as
per Bore
do - right 6 13.000 3.14*1.20 0.006 7.85 13.843 hole are
12.74/
Irrigation 13.15
PRICE
1*6 18.000 3.14*1.00 0.006 7.85
Total Quantity
94.418 MT
0.000 MT
do
4 12.24.6
BBored cast-in-situ M35 grade R.C.C. Pile Using Concrete Mixer excluding Reinforcement complete as
per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000
m.
Pile diameter-1000 mm
20.50+0.3
for abutment- Left 0-
1*12 19.900 238.800
bank 2.2+1.30=
19.90
17.7+0.3-
do - Right bank 1*12 18.550 222.601 0.75+1.30
=
20.48+0.3
Pier inside River 1*6 17.130 102.780 0-3.65 for
low level
5 12.25.6
Bored cast-in-situ M35 grade R.C.C. Pile Using Concrete Mixer excluding Reinforcement complete as per
Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.
Pile diameter-1200 mm
6 od5766/2016_2017/IA
Chipping and removing the extra projection of R.C.C Piles to lines and levels carefully without damaging
the structure including labour charges and other incidental charges and stacking the useful materials etc.
complete as per the directions direction of the deptl. officers at site.(State data, CPWD Rate)
Irrigation
Pile for abutment and
pier inside river
12
0.500
0.600
0.500
0.600
1.500
1.500
3.14
3.14
Total Quantity
35.325
20.348
55.673 cum
7 12.39
Providing and laying of PCC M15 leveling course 100 mm thick below the pile cap
8 12.38.C.1
Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical
Specificationn
RCC Grade M30 - Using Concrete Mixer
9 12.40
Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing
and Technical Specifications
Pile
do -RB
-do- overlap
PRICE
1*12*22
2*12*22
18.850
1.160
0.0063
0.0063
31.352
3.859
18.55+0.3
0 for L
L=(3.14x0.
Stiffner 16mm tor steel 2*12*14 2.985 0.0016 1.605
766)+0.58
L=(3.14x0.
Stiffner 16mm tor steel 2*6*13 3.600 0.0016 0.899
962)+0.58
L=(3.14x0.
Stiffner 16mm tor steel 1*6*13 3.050 0.0016 0.381
786)+0.58
10 od9701/2019_2020/IA
Providing spot welding fot the pile reinforcement with verticals to links and cage rings before erecting and
placing in the bore hole including cost of electrodes, current charges, hire for winch, welding plants and
all other labour charges, etc. complete.(Data based on Viyyam RCB, Ponnani)
12 piles,
22 bars,
133 spots
1*12*22*1
abutment - LB 35112.000 (
33
19.90/0.15
) forlateral
rings
do -RB
1*12*22*1 Irrigation 32736.000
24
Bank Pier
1*6*21*11
27600.000
14490.000
5
11 od9702/2019_2020/IA
Providing lap welding fot the pile reinforcement for vertical overlaps on erecting reinforcement stage by
stage and placing in the bore hole including cost of electrodes, current charges, hire for winch, welding
plants and all other labour charges, etc. complete.(Data based on Viyyam RCB, Ponnani)
22 nos, 32
Abutment- 2*12*22 1.600 844.801
mm dia
30 nos, 32
Bank pier 2*6*30 1.600 576.000
mm dia
21 nos, 20
pier inside river 1*6*21 1.000 126.000
mm dia
12 od5771/2016_2017/IA
Vertical load testing (INITIAL) of piles in accordance with IS : 2911(Part -IV) including<br>installation of
loading platform and preparation of pile head or construction of test cap and dismantling of<br>test cap
after test etc. compete as per specification & above 50MT and up to 100 MT<br>Single pile above 50
tonne and upto 100 tonne capacity<br>Initial test
2 2.000
13 13.5.C.P.1
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications
PCC Grade M25 - Using concrete Mixer - Height upto 5m
Abutment counterfort
2
Irrigation
11.500 1.200 4.889 134.937
stem
Counterfort
End counterfort
Pier at bankside
PRICE2*3
2*2
2
0.5*3.8
3.800
2.000
4.889
0.500
2.000
0.500
4.889
10.239
27.868
37.157
81.912
(7.500+2.0
-do- 3 2.000 0.800 22.800
0)/2
14 13.5.C.q.1
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications
PCC Grade M25 - Using concrete Mixer - Height 5m to 10m
from level
Abutment cap 2 11.300 1.200 0.400 10.848 + 6.189 to
+ 6.589
from
Dirt wall 2 11.300 0.400 1.761 15.920 +6.589 to
+ 8.350
15 13.6
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and
Technical Specifications
PRICE
5 +1 =10;
12mm dia. @150mm 2(7.15+4.1
1*10 23.050 9.0E-4 0.205
c/c side bars 5) +
0.45=23.0
5
nos=(4.25/
Pile cap Main bar 0.12)+1=3
20mm dia @ 120mm 2*2*37 10.000 0.0025 3.641 7; 735 +
c/c at top and bottom (2*132.5)=
10.00
2(7.35+4.2
12mm dia. @150mm 5)
2*12 23.650 9.0E-4 0.505
c/c side bars +0.45=23.
65
nos. =
(600/15)+
Pile cap Main bar
1=41;
25mm dia @ 150mm 2*2*41 13.950 0.0039 8.815
11.35+(2*
c/c at top
1.30)=13.9
5
nos.
=(11.35/0.
Distributors 16mm dia
2*2*77 8.450 0.0016 4.107 15)+1=77;
@ 150mm c/c at top
5.85+(2*1.
30)=8.45
50 d =
25mm dia overlap 2*2*41 1.250 0.0039 0.790
1.25 m
nos=(1.35/
0.15)+1=1
12mm dia. @150mm 0;
2*10 34.850 9.0E-4 0.619
c/c side bars 2(11.35+5.
85)+0.45=
34.85
Irrigation
nos=(1.35/
12 mm overlap PRICE
2*10*2 0.600 9.0E-4 0.022
0.15)+1=1
0;
2(11.35+5.
85)+0.60=
35.00
16 14.1C.1.2.B
Furnishing and Placing RCC Grade M30 using concrete mixer as per drawing and Technical
Specification
For T-beam & slab Super structure - Height 5m to 10m
17 od5782/2016_2017/IA
Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set
above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and
other stores, pay of staff etc complete
1200 1200.000
18 14.2
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and
technical specifications
(2.01+0.30
Dirt wall vertical )*2
2*47 5.120 9.0E-4 0.434
stirrups 12mm +0.50=5.1
2
nos=
11.5/0.2
+1 =59 ;
Vertical bar 16mm for
2*2*59 7.389 0.0016 2.791 6.589+0.2
stem
=6.789
+2*0.3=7.
389
nos=
(6.589-
1.3)/0.18
Horizontal bar 20mm 2*2*30 13.450 0.0025 4.035
+1 =30 ;
11.35+2*1
.05 =13.45
nos=3.80/
0.15 ; avg
[(
6.24+1.05)
Vertical stirrups for *2]+0.60=
2*3*27 11.040 9.0E-4 1.610
counterfort 12mm Irrigation 15.18 and
(2.10+1.05
PRICE )*2
+0.60=6.9
0 =11.04
nos=
(6.189-
1.30=4.88
9/0.15+1=
34; avg of
[(
Horizontal stirrups 2*3*34 7.200 9.0E-4 1.322 4.85+0.35
0*2+0.60=
11.00 & (
1.05+0.35)
*2
=0.60=3.4
0 ]=7.20
from+6.18
Main bar for end 9 to (-)
2*2*8 6.590 0.0039 0.823
counterfort 25mm 0.10=6.29
+0.30 for L
(6.29+0.35
)*2 +
Vertical stirrups 12mm 2*2*27 13.880 9.0E-4 1.332
0.60=13.8
8
nos=4.85/
0.15+1=33
;
Horizontal stirrups
2*2*33 11.000 9.0E-4 1.290 (4.85+0.35
12mm
)*2
+0.60=11.
00
Pier
length=6.1
Main bar vertical 9+3.65+1.
3*66 11.520 0.0039 8.789
25mm 38+0.30=1
1.52
length=
(6.19+3.65
Stirrups 12mm 3*50 8.000 9.0E-4 1.066
Irrigation )/0.2 +1 =
PRICE
50
Piercap
length=1.9
main bar bottom 2+2.86+2.
3*18 9.740 0.0039 2.052
25mm 86+1.05+1
.05
length=7.3
5+
mainbar top 25mm 3*36 9.450 0.0039 3.981
1.05+1.05
=9.45
n0s=
Side bar 16mm 3*8*2 9.450 0.0016 0.726 105/15 +1
=8
nos=
Side bar slop side
3*6*2 7.410 0.0016 0.427 80/15
16mm
+1=6
Stirrups 8 legged
3*4*14 5.040 9.0E-4 0.763
12mm
Stirrups 8 legged at
3*2*4*19 4.240 9.0E-4 1.741
slop portion 12mm
19 13.14
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83
(Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per
drawing and Technical Specifications.
142923.00
15 71.000 22.000 6.100
0
20 14.6
PRICE
Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and
grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical
post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as
per approved drawings and technical specifications.
4*14 +
2*3.0 +
2 68.200 136.400 1*3.80
+2*1.20=6
8.20
21
14.22
Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70
mm, complete as per approved drawings and standard specifications to be installed by the
22 14.9
Drainage Spouts complete as per drawing and Technical specification
40 40.000 4*2*5=40
23 5.15
Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen (VG - 30)
meeting the requirements given in table 500-40, prepared by using mastic cooker and laid to required
level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated
finegrained hard stone chipping of 13.2 mm nominal size at the rate of 0.005cum per 10 sqm and at an
Irrigation
approximate spacing of 10 cm center to center in both directions, pressed into surface when the
temperature of surfaces is not less than 1000C, protruding 1 mm to 4 mm over mastic surface, all
1 68.200 7.500
Total Quantity
511.500
511.500 sqm
24 14.5.a
Mastic ASphalt
Providing and laying 12 mm thick mastic asphalt wearing course on top of deck slab excluding prime coat
with paving grade bitumen meeting the requirements given in table 500-29, prepared by using mastic
cooker and ladi to required level and slope after cleaning the surface, including providing antiskid surface
with bitumen precoated fine grained hard stone chipping of 9.5 mm nominal size at the rate of 0.005 cum
per 10 sqm and at an approximate spacing of cm center to center in both directions, pressed into center
in both directions, pressed into surface when the temperature of surfaces not less than 100 deg. C,
protruding 1 mm to 4 mm over mastic surface, all complete as per clause 515
25 od5787/2016_2017/IA
12 mm cement plaster finished with a floating coat of neat cement of mix:<br>1:3 ( 1 cement : 3 fine
sand)
4 spans, 7
posts with
junction
Joints of Hand rail
2*28 0.165 0.175 -1.617 joints (
post and hand rails
total 9
post/span
)
PRICE
Colour washing such as green, blue or buff to give an even shade:<br>New work ( two or more coats)
with a base coat of white washing with lime
4 spans, 7
posts with
junction
Joints of Hand rail
2*28 0.165 0.175 -1.617 joints (
post and hand rails
total 9
post/span
)
1 3.13.5.B
Earth work in excavation of foundation of structures as per drawing and technical specification, including
setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing
of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining
earth locally for road work.
Marshy soil - Mechanical Means
[(
excavn for lock 2.2+2.0)/2
chamber from GL to 1 113.000 45.000 1.740 8847.900 + ( 2.0
+0 level +0.75)/2
]=1.74 avg
pile
platform
level
proposed
at + 0
level,
bottom
do from + 0 to (-) 3.65
1 113.000 45.000 3.650 18560.250 level of
level
pile cap is
(-) 5.6,
Irrigation level of
PRICE
Piling
platform
proposed
is (-) 5.4.5
2 od5757/2016_2017/IA
Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually /
by mechanical means including stacking of serviceable and disposal of unserviceable material within 50
metres lead as per direction of Engineer-in-Charge:<br>In cement mortar
3 od5759/2016_2017/IA
Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal
of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
4 od5762/2016_2017/IA
Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work ( Payment
shall be made on the cross sectional area of R.C.C. or R.B work) as per direction of Engineer-in-charge.
PRICE
Total Deducted Quantity 0.000 sqm
5 12.22
Providing Steel Liner 10mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and
Setting out as per Detailed Drawing.
piling
Lock Wall Bank side platform
2*22 13.000 3.14*1.2 0.006 7.85 101.515
of river- Left level- at
+0
Lock Wall inside river 2*20 15.000 3.14*1.00 0.006 7.85 88.737 do
extra ples
provided
Pile for Elevated Lock for
2 13.000 3.14*1.00 0.006 7.85 3.846
Cabin supporting
cabin
room
6 12.24.6
BBored cast-in-situ M35 grade R.C.C. Pile Using Concrete Mixer excluding Reinforcement complete as
per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000
m.
Pile diameter-1000 mm
pile
platform
lvl at +0
m, but
only the
provision
for pile
upto (-)
2.5 m is
given.
Lockwall inside river -
2*20 12.500 500.000 Bore hole
upto (-) 2.50 level
depth, avg
of of 15.29
Irrigation &
PRICE
15.14=15.
21
+0.30=15.
51, say
15.50 -
2.50=12.5
0
pile
Pile for Lock Cabin on
2 15.000 30.000 platform
Left bank
lvl at ) m.
7 12.25.6
Bored cast-in-situ M35 grade R.C.C. Pile Using Concrete Mixer excluding Reinforcement complete as per
Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.
Pile diameter-1200 mm
18.00-
do do - Right - do - 2*22 15.500 682.000 2.50=15.5
0
8 od5776/2016_2017/IA
Vertical load testing of piles in accordance with IS 2911( Part IV) including installation of loading platform
and preparation of pile head or construction of test cap and dismantling of test cap after test etc.
complete as per specification & the direction of engineer -in-Charge.
6 6.000
9 od5766/2016_2017/IA Irrigation
Chipping and removing the extra projection of R.C.C Piles to lines and levels carefully without damaging
3.14*0.6*0
.6=1.1304,
4*22 1.1304 2.950 293.452
from (-) 2.5 to (-) ; D= 5.45-
5.45=2.95 M 2.50=2.95
3.14*0.5*0
Lock Wall inside river 2*20 0.785 2.950 92.631
.5=0.785
3.14*0.5*0
Pile for Lock Cabin 2 0.785 1.500 2.355
.5=0.785
10 12.39
Providing and laying of PCC M15 leveling course 100 mm thick below the pile cap
length=93.
3-7.5(
Lock Wall Bank side 2 85.800 4.600 0.100 78.936
Lock pier
portion )
length=93.
Lock Wall inside river 1 86.000 4.500 0.100 38.700
3-7.3
3.14*.375*
Deduct pile portion-
4*22 1.1304 0.100 -9.947 .375=0.44
Bankside pile
156
3.14*.375*
Pile for lockwall inside
2*20 0.785 0.100 -3.140 .3750=0.4
river
4156
PRICE
Total Deducted Quantity -13.087 cum
11 12.38.C.1
Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical
Specificationn
RCC Grade M30 - Using Concrete Mixer
12
12.8.B.1
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical
Specifications
PCC Grade M20
13 12.40
Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing
and Technical Specifications
Pile
PRICE
pier- Left
Stirrups 12mm
2*6*101 2.970 9.0E-4 3.240
@150mm c/c
Stirrups 12mm @
2*14*84 2.970 9.0E-4 6.287
180mm c/c
14 od9701/2019_2020/IA
Providing spot welding fot the pile reinforcement with verticals to links and cage rings before erecting and
placing in the bore hole including cost of electrodes, current charges, hire for winch, welding plants and
all other labour charges, etc. complete.(Data based on Viyyam RCB, Ponnani)
Irrigation
22 piles,
PRICE
lock wall-bank side-left
2*22*30*7
1
93720.000
30 nos
bars, 71
lat. rings
22 piles,
2*22*30*1 137280.00 30 nos
do right
04 0 bars, 104
lat. rings
6 piles, 26
2*6*26*10 nos bars,
lock shutter pier 31512.000
1 101 lat.
rings
14 piles,
2*14*21*8 21 nos
lock wall - inside river 49392.000
4 bars, 84
lat. rings
15 od9702/2019_2020/IA
Providing lap welding fot the pile reinforcement for vertical overlaps on erecting reinforcement stage by
stage and placing in the bore hole including cost of electrodes, current charges, hire for winch, welding
plants and all other labour charges, etc. complete.(Data based on Viyyam RCB, Ponnani)
16 od5781/2016_2017/IA
Providing Z steel sheet pile of size 400x185x7.5/8.5 driving down vertically in lines and levels interlocking
with adjacent piles with suitable pile driving unit and all accessories including all labour hire charges etc.
Irrigation
complete and as per the directions of departmental officers at site.
35 +
do- widthwise 2 38.300 3.200 245.120 2*1.65=38
.300
17 od5783/2016_2017/IA
Cathodic protection including all cost of conveyance of materials, labour, etc, complete and as per the
direction of departmental officers at site
Apron
Surface rienforcement
L=12.55+0
for apron 10mm@200 2*472 13.150 0.0062 76.592
.3x2
for shorter span
L=94.2+0.
-do- longer span 2*64 94.800 0.0062 74.870
3x2
PRICE
a n d b o t t o m 2*2*29 45.220 0.0247 129.355
85x2+Ld
@150mmc/c long
L=42.8+0.
-do- overlap 2*2*29*3 0.910 0.0247 7.810
85x2+Ld
L=(42.8+4
-do-overlap 2*10*8 0.550 0.0089 0.782
.3)*2
18 13.6
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and
Technical Specifications
Apron
Surface rienforcement
L=12.55+0
for apron 10mm@200 2*472 13.150 6.0E-4 7.660
.3x2
for shorter span
L=94.2+0.
-do- longer span 2*64 94.800 6.0E-4 7.487
3x2
L=42.8+0.
-do- overlap 2*2*29*3 0.910 0.0025 0.792
85x2+Ld
L=(42.8+4
-do-overlap 2*10*8 0.550 9.0E-4 0.080
.3)*2
L=(42.8+4
-do-overlap 4*12*8 0.550 9.0E-4 0.191
.3)*2
19 14.1.A.1
Furnishing and Placing Reinforced Cement Concrete Grade M20 Using Concrete Mixer in super-structure
as per drawing and Technical Specification
20 14.1.C.1
Furnishing and Placing Reinforced Cement Concrete Grade M30 Using Concrete Mixer in super-structure
as per drawing and Technical Specification
[70-
Irrigation 2*(8.15+2.
PRICE
Lock wall 3*2 23.350 1.200 6.150 1033.939 0+0.5)-
2.00] /
2=23.35
21 14.2
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and
technical specifications
L=
Horizontal 10mm @
2*32 56.450 6.0E-4 2.230 Perimeter-
200 c/c
8cover
Vertical 10mm
4*268 8.700 6.0E-4 5.755
@200c/c
Horizontal 10mm @
4*32 53.280 6.0E-4 4.208
200 c/c
16mm@200
2*11
4.440
23.250
0.0016
0.0016
1.677
0.819
0.12+2x0.
41+2Ld
22 od5785/2016_2017/IA
Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various
strata bellow bed level including cost coveyance labour charges etc complete.
35/0.9=40
Nos.,
Below appron of lock
3/0.9=4
shutter canal side@ 160 7.500 1200.000
nos.,
90cm C/C
40*4=160
nos.
35/0.9=40
Nos.,
River side 400 7.500 3000.000 8/0.9=10
nos., 40*
10 = 400
23 od5786/2016_2017/IA
Coconut Pile - Driving down coconut pile to lines and levels through variuos strata including all hire
charges and labour for fixing , staging platform and all other appliances necessary for pile driving down
after pointing the bottom end
35/0.9=40
Nos.,
Below appron of lock
shutter canal side@ 160
Irrigation
6.000 960.000
3/0.9=4
nos.,
90cm C/C
PRICE 40*4=160
nos.
35/0.9=40
Nos.,
River side 400 6.000 2400.000 8/0.9=10
nos., 40*
10 = 400
24 od5788/2016_2017/IA
Cutting and removing the excess length of wooden piles to lines and levels and removing the cut end of
piles and stacking within 150m
25 od5790/2016_2017/IA
DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality blasted rubble
including packing to compactness to lines levels, cost and conveyance of all materials labour charges
etc. complete as per direction of Departmental officers at site
26 od5791/2016_2017/IA
DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality departmental rubble
obtained during dismantling existing structures including packing to compactness to lines levels, cost and
conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
27 od5792/2016_2017/IA
PRICE Net Total Quantity
Rs 240266.71
BAILING OUT WATER USING PUMP ABOVE 20HP AND UP TO 30HP -Bailing out water with engine
and pump set above 25HP and up to 30HP, including conveyance to site and errection,cost of fuel,
lubrication oil and other stores, pay of staff etc complete
20 nos x
1 4000.000 4000.000
200 days
3 App.C.Approach Road
1 12.22
Providing Steel Liner 10mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and
Setting out as per Detailed Drawing.
2 sides,
13
3.140*0.3 nos/side;
Wing wall - left 2*13 0.006 12.600 7.85 16.958
5 11.30
+1.30
=12.60
d=(12.60
+
3.140*0.3
do - right 2*13 0.006 13.000 7.85 17.496 13.55/2=1
5
3.08,
say13.00
2 od5760/2016_2017/IA
Boring, providing and installing bored cast-in-situ reinforced cement concrete piles of grade M-30 of
specified diameter and length below the pile cap to carry a safe working load not less than specified,
Irrigation
excluding the cost of steel reinforcem5ent but including the cost of boring, with bentonite solution and
temporary casing of appropriate length for setting out and removal of same and the length of the pile to
PRICE
be embedded in the pile cap etc. all complete, including removal of excavated earth with all lifts and leads
(Length of pile for payment shall be measured upto bottom of pile cap).<br>350 mm dia piles
13 nos on
one side;
Wing wall - left 13 18.400 239.200 length= (-)
18.6 to (-)
0.2=18.40
from (-)
18.80 to (-
do do 13 18.600 241.800
)
0.2=18.60
from (-)
17.40 to (-
do Right 13 17.200 223.600 )
0.20=17.2
0
from (-)
17.250 to
do do 13 17.050 221.650 (-)
0.20=17.0
5
3 od5764/2016_2017/IA
Chipping and removing the extra projection of R.C.C Piles to lines and levels carefully without damaging
the structure including labour charges and other incidental charges and stacking the useful materials etc.
complete as per the directions direction of the deptl. officers at site.(State data, CPWD Rate)
4 12.39
Providing and laying of PCC M15 leveling course 100 mm thick below the pile cap
Irrigation
3.14/4=0.7
pile portion
PRICE
wing wall -pile cap bed
4*13
4
0.350
6.500
0.350
3.900
0.100
0.100
0.785 -0.500
10.140
85
(5.40+2.40
)/2=3.90
5 12.38.B.1
Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical
Specification
RCC Grade M25 - Using concrete Mixer
4*13=52,
3.14*.175*
52 0.350 0.350 0.075 0.785 -0.375
.175=0.09
616
(5.40+2.40
wing wall -pile cap bed 4 6.500 3.900 0.900 91.260
)/2=3.90
6 12.40
Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing
and Technical Specifications
4*13*6=31
do do 13*6 20.100 0.0039 6.115
2
4*13*6=31
do right 13*6 18.700 0.0039 5.689
2
4*13*6=31
do do 13*6 18.550 0.0039 5.643
2
4*13*91=4
732,(
Lateral rings 8mm dia
13*75 0.935 4.0E-4 0.365 3.14*0.25)
,25cm c/c- left
+0.15=0.9
35
Irrigation 4*13*91=4
PRICE
732,(
do do 13*76 0.935 4.0E-4 0.370 3.14*0.25)
+0.15=0.9
35
4*13*91=4
732,(
do right 13*70 0.935 4.0E-4 0.341 3.14*0.25)
+0.15=0.9
35
4*13*91=4
732,(
do do 13*69 0.935 4.0E-4 0.336 3.14*0.25)
+0.15=0.9
35
4*13*10=5
1 2 m m t o r 20,(
steel,stiffner @ 1.50 m 13*13 0.985 9.0E-4 0.150 3.14*0.25)
c/c- left +0.2=0.98
5
4*13*10=5
20,(
do do 13*13 0.985 9.0E-4 0.150 3.14*0.25)
+0.2=0.98
5
4*13*10=5
20,(
do right 13*13 0.985 9.0E-4 0.150 3.14*0.25)
+0.2=0.98
5
4*13*10=5
20,(
do do 13*13 0.985 9.0E-4 0.150 3.14*0.25)
+0.2=0.98
5
1 overlap
2 5 m m t o r
4*13*6 1.250 0.0039 1.521 for each
steel,overlap
main bar
PRICE
Say 27.848 MT @ Rs 68532.96 / MT Rs 1908505.87
7 od5768/2016_2017/IA
Providing spot welding fot the pile reinforcement with verticals to links and cage rings before erecting and
placing in the bore hole including cost of electrodes, current charges, hire for winch, welding plants and
all other labour charges, etc. complete.(Data based on Viyyam RCB, Ponnani)
4*13*6*91
28392 28392.000
=28392
4*13*6*10
3120 3120.000
=3120
8 od5770/2016_2017/IA
Providing lap welding fot the pile reinforcement for vertical overlaps on erecting reinforcement stage by
stage and placing in the bore hole including cost of electrodes, current charges, hire for winch, welding
plants and all other labour charges, etc. complete.(Data based on Viyyam RCB, Ponnani)
4*13*6*2=
624 1.250 780.000
624
9 od5774/2016_2017/IA
:Vertical load testing (INITIAL) of piles in accordance with IS : 2911(Part -IV) includinginstallation of
loading platform and preparation of pile head or construction of test cap and dismantling oftest cap after
test etc. compete as per specification & above 50MT and up to 100 MT
4 4.000
10 14.1.A.1.A
Furnishing and Placing Reinforced Cement Concrete Grade M20 Using Concrete Mixer as per drawing
and Technical Specification.
For solid slab super-structure - Height upto 5m
Wing wall
superstructure-
- PRICE 4 1.500 0.560 5.000 16.800
ht=0.30,
width at
5.00 m
ht=0.42m;
straight portion
avg
width=(.70
+0.42)2=0
.56
top width
at 3.00 m
ht=0.53,t ;
do do - sloping portion
4 5.000 0.615 3.000 36.901 avg
-upto 3.00 m
width=(.70
+0.53)2=0
.615
avg
.length=(5.
0+2.54)/2
=3.77; top
width at
3.00 m
do do do - from 3.00
4 3.770 0.475 2.000 14.326 ht=0.53,wi
to 5.00 m
dth at 5.00
m=0.42 mt
; avg
width=(0.5
3+0.42)=0
.475
11 14.1B.1.1.B
Furnishing and Placing Reinforced Cement Concrete Grade M25 Using Concrete Mixer as per drawing
and Technical Specification.
For solid slab super-structure - Height 5m to 10m
width at
Irrigation 5.00
length at
5.00 m
=2.54 m,
length at
do sloping portion - do 4 1.270 0.360 2.050 3.750
7.05 m =0,
avg
.length=1.
27 m
12 14.2
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and
technical specifications
13 od5777/2016_2017/IA
PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm
including cost of materials, conveyance, labour charges etc. complete.
4x16=64
nos., avg
Wingwall 64 0.600 38.400
length _ =
0.60
PRICE
Net Total Quantity 38.400 metre
14 od5778/2016_2017/IA
Providing filter media with woven fabric filter GWF-26-130 weight not less than 130gm/m2 pore size(mm)
less than 0.075 with and overlap of 30cm at all joints stitched toghther pulled up in to folds uniformly and
sufficiently in both direction for avoiding over extension of fibre of which it is composed and forming the
toe to prevent scourage including conveyance and all leads and lifts etc. complete.
15 od5779/2016_2017/IA
Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set
above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and
other stores, pay of staff etc complete
3600 3600.000
16 3.16
Construction of embankment with approved material obtained from borrow pits with all lifts and leads,
transporting to site, spreading, grading to required slope and compacting to meet requirement of table
300-2.
17 od6726/2016_2017 Irrigation
PRICE
Construction of Embankment with Material obtained from departmental work site :- Construction of
embankment with approved material obtained from departmental work site of -formation of Badagara
Mahe canal bet Ch. 457.380 and 460.620 ( Reach-III) with all lifts and leads, transporting to site,
spreading, grading to required slope and compacting to meet requirement of table 300-2.
botom =
12+2*8.35
=28.70,
top=12,
LB 1 180.000 20.350 4.175 15293.026
avg=20.35
,
ht=(8.35+
0)/2=4.175
width=
(28.70+
Extra near Exg VCB 1 41.000 31.700 3.000 3899.101
34.70)/2=3
1.70
18 4.1.B.1
Construction of granular sub-base by providing graded material, spreading in uniform layers with motor
grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with
vibratory roller to achieve the desired density, complete as per clause 401.
Grading-V - For sub base cum drainage layer - Mix in Place Method
260 m -
approach
2 180.000 8.000 0.300 864.000
on one
side
19 4.12
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification
including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by
tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and
compacting with vibratory roller to achieve the desired density.
2 Irrigation
180.000 7.700 0.200 554.400
PRICE
Total Quantity 554.400 cum
20 5.3.2.a
Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of
75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder (VG
30), transported to site, laid over a previously prepared surface with paver finisher to the required grade,
level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.
For Grading II - (19 mm nominal size)
21 5.6.1.a
Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of
75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder(
NRMB) @ 5.2 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic
paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No.
507 complete in all respects
For Grading - I ( 19 mm nominal size )
22 od5793/2016_2017/IA
12 mm cement plaster finished with a floating coat of neat cement of mix:<br>1:3 ( 1 cement : 3 fine
sand)
Edge
Top PRICE4
4
0.300
8.030
3.000
0.300
Total Quantity
3.600
9.636
158.448 sqm
1.50 +
6.53=8.03
23 od5789/2016_2017/IA
Colour washing such as green, blue or buff to give an even shade:<br>New work ( two or more coats)
with a base coat of white washing with lime
Qty same as
1 158.448 158.448
plastering
24 3.22
Furnishing and laying of the live sods of perennial turf forming grass on embankment slope, verges or
other locations shown on the drawing or as directed by the engineer including preparation of ground,
fetching of sods and watering.
260-
150(stone
Left bank & right bank 4 110.000 3.000 1320.000
piching)=1
10
25 12.4
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size
mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
2*2*3=12,
Step L/B & R/B - both
3 flights
sides of approach 12 12.960 1.800 0.200 55.988
for each
road
step
2*2*2*3=2
do foundn 24 12.960 0.300 0.400 37.325
4
Irrigation
2*2*36=14
do - step
Landing
PRICE144
12
1.800
1.200
0.300
1.800
0.200
0.200
0.5 7.777
5.185
4, 12
steps in
each flight
2*2*3=12
2*2*7=28,
7 nos on
each side,
SIDE DRAIN- bed 28 10.000 1.300 0.200 72.800 avg
.length=
(16+4)/2=
10-
26 15.4.A
Providing and laying Pitching on slopes laid over prepared filter media including boulder Stone/Boulder
apron laid dry in front of toe of embankment complete as per drawing and Technical specifications
Embankment slope -
4 150.000 10.000 0.300 1800.000
LB & RB
Downstream &
Upstream of Lock 4 50.000 9.000 0.300 540.000
basin
27 10.2
Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on
shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
Irrigation
Say 720.000 sqm @ Rs 36.47 / sqm Rs 26258.40
PRICE
28 3.24.A
Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil by mechanical
Means to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309.
Excavated material to be used in embankment within a lead of 50 metres (average lead 25 metres)
4 180.000 720.000
29 8.13
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass
beads on Bituminous Surface @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface
applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and
holes.
30 8.23.A
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal
beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm
spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be
galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed
on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per
clause 811.3
4 180.000 720.000
31 8.4.1
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years
warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting vide clause
801.3.3 fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick
with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB
Irrigation
confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15
grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all
PRICE
exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and
clause 801 including lettering symbols etc.
90 cm equilateral triangle
4 4.000
32 8.6
Providing and fixing of direction and place identification retro-reflectorised sign with 7 years warranty
manufactured as per IRC :67 High Intensity Micro Prismatic (Type IV) grade sheeting fixed over
aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with area exceeding
0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on suitably designed
GI pipe pole not less than 50mm NB , 2 Nos. confirming to IS 1239, firmly fixed to the ground by means
of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60
cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy
primer and as per approved drawing and clause 801 including lettering symbols etc.
Place identification
3 1.200 0.750 2.700
board
33 od5798/2016_2017/IA
Supplying, providing and laying woven Geotextile fabric ( Polyester or polypropylene having 3.00 Metre
minimum width & minimum 10% elongation at yield and minimum Tensile strength of 50 KN/M ) in wrap
direction right angle to the alignment of the embankment with suitable laps instead of removel of slush
proposed in the embankment design as directed by the departmental officers at site. [Referance as per
MORT & H specification first revision section 700&2504-Sr No 15.6 page524]
34 od5799/2016_2017/IA
Irrigation
Aggregate blanket <br>Supplying and spreading 6.7mm coarse aggregate under the Geo textile fabric
already laid on the entire plan area of the road alignment with a minimum 30CM thickness as a filter
PRICE
media where slush removel proposed as per the direction of departmental officers at site.[Asper MORT&
H specification firstrevision 2504 Sr No.15.5 page523]
35 od5800/2016_2017/IA
Prefabricated Vertical Drain<br>Supplying and installing Flexible Pre- Fabricated Vertical drain (MEBRA
DRAIN version HD 747088of Geo Technics Holland BV ) & 7407 or equlant ) consisting of high strength
high permeability synthetic filter fabric surrounding a fluted core for water drainage of 10CM width and
3mm to 4mm thickness for an average depth of 18 Metre below the operating platform level as per
standard specification @ 1.3 Metre equilateral triangle spacing on entire plan area of the road alignment
where stabilistion of soil proposed in the soil invetigation report and embakment design [As per MORT &
H specification section 300-Clause 309 ]
20/.52=38
rows,, 58
n0+19
988 988.000
n0/2=38 ,
38x26=98
8 n0
36 9.3.B
Laying Reinforced cement concrete pipe NP4 / prestressed concrete pipe for culverts on first class
bedding of granular material in double row including fixing collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .
1200 mm dia
PRICE
Sl No Description No L B D CF Quantity Remark
1 50.6.7.1
Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement
mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.
2
50.6.7.2
Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement
mortar 1:6 for super structure above plinth level up to floor two level including all cost of materials, labour
charges etc.
3 5.3
Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings,
Irrigation
balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor
4.73+.05+
Beam for Cabin floor
2 5.980 0.300 0.300 1.077 1.20 proj
slab
=5.98
D = (0.10
Sunshade Front 1 6.230 0.900 0.090 0.505 +0.08)/2 =
0.09
D = (0.10
Sunshade Back 1 6.230 0.750 0.090 0.421 +0.08)/2 =
0.09
D = (0.10
Two sides 2 3.720 0.750 0.090 0.503 +0.08)/2 =
0.09
D = (0.10
2 3.720 0.100 0.100 0.075 +0.08)/2 =
0.09
5.33+4.32
Parapet wall 2 9.650 0.100 0.100 0.194
=9.65
4 5.2.2
PRICE
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth
and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level
excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand :
3 graded stone aggregate 20 mm nominal size)
from level
column for supporting
2 0.300 0.300 5.000 0.900 +0.60 to
Cabin floor
+5.60
from level
+2.30 to
do 2 0.300 0.300 3.300 0.594 +5.60 over
lock wall
bank side
5 5.9.5
Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams,
girders bressumers and cantilevers
0.3+0.3+0.
Floor beam 2 5.980 0.900 10.765
3=0.90
0.3+0.3+0.
do 2 3.000 0.900 5.400
3=0.90
0.30*4=1.
column 2 3.000 1.200 7.200
20
0.30*4=1.
do 2 1.300 1.200 3.120
20
Sunshade PRICE1
1
16.060
6.530
3.720
0.100
0.750
0.750
1.606
9.795
2.790
(0.180+0.1
2 5.220 0.280 2.924
0) = 0.280
(5.33+4.32
) = 9.65,
Slab Edge with
2 9.650 0.300 5.790 (0.20 +
parapet
0.10) =
0.30
(5.33+4.32
) = 9.65,
2 9.650 0.300 5.790 (0.20 +
0.10) =
0.30
6 5.22A.6
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and
binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
Qty of
concrete =
17.352
+0.774=18
1 18.126 120.0 2175.121 .126 m3,
Qty of
steel @
120 kg
/m3
PRICE
Total Deducted Quantity 0.000 kg
7 9.1.1
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed
and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or
dash fastener shall be paid for separately).Second class teak wood
Door Horizontal
2 1.200 0.060 0.120 0.018
member
W i n d o w W 3
4 1.880 0.060 0.120 0.055
Horizontal member
Ventilator Horizontal
2 0.950 0.060 0.120 0.014
member
8 9.5.1.1
Providing and fixing panelled or panelled and glazed shutters for shutters for doors, windows and
clerestory windows, including ISI marked M.S. pressed butt hinges bright finished of required size with
necessery screws, excluding panelling which will be paid for separately, all complete as per direction of
Engineer - in-charge.Second class teak wood35 mm thick shutters
9 9.48.2
Providing and fixing M.S. Grills of required pattern in frames of windows etc. with M.S. flats, square or
round bars etc. including priming coat with approved steel primer all complete.Fixed to openings/ wooden
frames with rawl plugs screws etc
Irrigation 2window
Window 6 13.0 78.000 x3=6,13kg
Ventilator
PRICE 1 9.0 9.000
/each
1window
x1=6,9kg/
each
10 9.119
Providing and fixing factory made P.V.C. door frame of size 50x47 mm with a wall thickness of 5 mm,
made out of extruded 5 mm rigid PVC foam sheet, mitred at corners and joined with 2 Nos. of 150 mm
long brackets of 15x15 mm M.S. square tube, the vertical door frame profiles to be reinforced with 19x19
mm M.S. square tube of 19 gauge, EPDM rubber gasket weather seal to be provided through out the
frame. The door fame to be fixed to the wall using M.S. screws of 65/100 mm size, complete as per
manufacturer's specification and direction of Engineer-in Charge.
11 9.120.1
Providing and fixing factory made panel PVC door shutter consisting of frame made out of M.S. tubes of
19 gauge thickness and sized of 19 mm x 19 mm for styles and 15x15 mm for top & bottom rails. M.S.
frame shall have a coat of steel primers of approved make and manufacture. M.S. frame covered with 5
mm thick heat moulded PVC 'C' channel of size 30 mm thickness, 70 mm width out of whicj 50 mm shall
be flat and 20 mm shall be tapered in 45 degree angle on both side forming styles and 5mm thick, 95 mm
wide PVC sheet out of which75 mm shall be tapered in 45 degree on th inner side to form top and bottom
rail and 115 mm wide PVC sheet out of which 75 mm shall be flat and 20 mm shall be tapered on both
sides to form lock rail. Top, bottom and lock rails shall be provided both side of the panel. 10 mm (5
mmx2) thick, 20 mm wide cross PVC sheet be provided as gap insert for top rail & bottom rail. paneling of
5 mm thick both side PVC sheet to be fitted in the M.S. frame welded /sealed to the styles & rails with 7
mm (5 mm + 2 mm ) thick x 15 mm wide PVC sheet beading on inner side, and joined together with
solvent cement adhesive. An additional 5 mm thick PVC strip of 20 mm width is to be stuck on the interior
side of the 'C' Channel using PVC solvent adhesive etc. complete as per direction of Engineer -in-charge,
manufacture's specification & drawing.30 mm thick plain PVC door shutters
PRICE
Net Total Quantity 1.310 sqm
12 13.1.2
12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand).
(4.31 +
Inside room 2 7.610 3.000 45.661 3.30)
=7.61
(1.10 +
Toilet 2 2.500 3.000 15.000 1.40)
=2.50
(4.73+3.72
Outside 2 8.450 3.000 50.700
) =8.45
(4.87+3.80
Basement 2 8.670 0.450 7.803
) =8.67
13 11.41.2
Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer)
with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and
shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including grouting the joints
with white cement and matching pigments etc., complete.Size of Tile 600 x 600 mm.
1.61+1.1=
Toilet wall 1 2.710 0.210 -0.569
2.71
Providing and fixing I st quality ceramic glazed wall tiles conforming to IS : 15622 (thickness to be
specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green,
black of any size as approved by Engineer -in-Charge, in skirting, risers of steps and dados, over 12 mm
thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3 kg
per sqm, including pointing in white cement mixed with pigment of matching shade complete.
(2x1.4)+(2
1 5.000 1.800 9.000
x1.1)=5.00
15 13.85.1
Applying priming coats with primer of approved brand and manufacture, having low VOC ( Volatile
Organic Compound) content.With ready mixed pink or grey primer on wood work (hard and soft wood )
16 13.80
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and
manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.
Area same as
1 134.170 134.170
plastering
17 13.84.2
Irrigation
Painting with synthetic enamel paint, having VOC (Volatile Organic Compound) content less than 150
grams/ litre, of approved brand and manufacture, including applying additional coats wherever required to
18 13.81.2
Dis tempering with Ist quality acrylic distemper, having VOC (Volatile Organic Compound) content less
than 50 grams /litre, of approved brand and manufacture, including applying additional coats wherever
required, to achieve even shade and colour.Two coats
Area same as
1 134.137 134.137
plastering
19 10.2
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including
cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
from +8.30
Stair towards the
12 1.500 0.450 25.0 202.501 to +6.05
Cabin from Bridge
downward
3.85+0.90
do hand rail 2 8.250 0.900 20.0 297.000 +3.50=8.2
5
Total Amount
Rs 83532.66
307759060.00
Total 307759060.00
TOTAL Rs 308000000.00