Project Name : PT.

ISTW
Site Manager : ERI AHMAD
Date : 12 - 03 - 2023
Pipe Check List Electrical Check List

Water Supply / Tightening & Marking Trial Remarks


Panel Name/ M/C No. Current Status Compresed Air Meggering Cable Phase Rotation Voltage Measuring
Return (Bolt Size-N) Commissioning

Before
After
Before
After
Before
After
Before
After
Before
After
Before
After
Before
After

Acknowledge by, Checked by, Witnessed by,


Customer Site Manager Supervisor
( ) ( ERI AHMAD ) ( Dede S )