Project tittle : 2x7.

5 MW - Cogeneration Power Plant

PT. SURYA BORNEO INDUSTRI


Client :
Pangkalan Bun, Kalimantan Tengah, Indonesia

PT. EUROASIATIC JAYA


EPC :
Jakarta, Indonesia

PT. HAMAN ENERGY INDONESIA


Commissioning Team :
Jawa Timur, Indonesia

Description : Motor Solo Run, Motor/Pump Trial Run

No. Document:

DWIKI
1 1/19/2023 FAHRI FOR INFORMATION
JHOANTORO
Rev DATE PREPARED CHECKED APPROVED STATUS
Doc. NO
Project Name :
FEEDER - TRIAL RUN TEST Rev
SBI Pangkalan Bun
Date :

System
Equipment Name
Rated Speed
Motor Maker
Motor Capacity
Rated Volt/Freq
Rated Current

MOTOR
Vibration (mm/s)
Temp NDE DE Ambient
No Time RPM Winding VFD (%)
Temp Temp (°C)
(°C) H V A H V A
(°C) (°C)

GEARBOX

Vibration (mm/s)
NDE DE
No
Temp
H V A Temp (°C) H V A
(°C)

NOTE :
- Start :
- Stop :

Tested by, Witnessed by, Approved by


Haman Energy Indonesia Euro Asiatic Surya Borneo Industri
Doc. NO
Project Name :
FEEDER - TRIAL RUN TEST Rev
SBI Pangkalan Bun
Date :

Signature

Name
Date of Signing
Doc. NO

Rev

Date :

Current (A)
Doc. NO

Rev

Date :