GORONTALO GFPP 100 MW

LEVELING INSPECTION REPORT

CLIENT : PT PLN (PERSERO) REPORT NO :


SYSTEM : REFF. DRAWING :
SUBJECT : DEMIN WATER PUMP TYPE INSPECTION :
AREA : BOP EQUIP. TAG NO. :

+1000

Elevation Check
No. Point Result Remarks
Design (mm) Actual (mm) Dev. (mm)

1 1

2 2

3 3

4 4

Acceptance Criteria : ± 3mm or design specification

Prepared & Inspected by Inspected by PT PP Accepted by Client


Subcontractor

Name
Date
PROJECT PLTG 500 MW GE - LOMBOK

SOLO RUN TEST REPORT FOR MOTOR

CLIENT : PT PLN BATAM REPORT NO : QAQC/RE/004/00

CLIENT : GENERAL ELECTRIC SUBJECT :

SYSTEM : TYPE INSPECTION :

AREA : EQUIP. NAME :

VIBRATION AND TEMPERATURE MEASUREMENTS


PROCEDURE (Note 1)
Measure vibration and temperature as follows during motor uncoupled run
up to 90 min. for motors rated over 1kVac and 60 min. for others or temperaturer was stabil
Vibration Measure velocity at bearing housings in the horizontal,
vertical and axial directions during motor uncoupled run.
Temperature Measure surface temperature of bearing housings by
non-contact type instrument during motor uncoupled run.
CRITERIA (Note 1)
Vibration ISO-10816
Temperature

TESTING INSTRUMENT Vibration

Temperature

OBSERVED ROTATION The direction of rotation of a motor shall be same as that of a driven machine.
CW CCW

Nominal Voltage (V)

RECORDED VALUE

Time after start (min.) 15 30 45 60 75 90 105 120

Starting current (A)

Nominal current (A)

Speed (rpm)

DE Horizontal

DE Vertical
(mm/s, rms)
Vibration

DE Axial

NDE Horizontal

NDE Vertical

NDE Axial

Ambient

Body
Temp.
(℃)

DE Bearing

NDE Bearing

RESULT Pass Fail Comment

Note: 1 In case of conflicts with the manufacturer's requirements, the manufacturer's requirements shall govern.

Prepared & Inspected by Reviewed/Witnessed by Witnessed & Approved by Acknowledged by


PT. PP (Persero) Tbk GE PT. PLN BATAM

Name

Form IR-M-015
Date

Form IR-M-015
GORONTALO GFPP 100 MW

COUPLE RUNNING TEST REPORT

CLIENT : PT PLN (PERSERO) REPORT NO :


SYSTEM : REFF. DRAWING :
SUBJECT : TYPE INSPECTION :
AREA : BOP EQUIP. TAG NO. :

VIBRATION AND TEMPERATURE MEASUREMENTS


PROCEDURE (Note 1) The equipment has been erected, final inspected and accepted and now ready for test.
Measure vibration and temperature as follows during motor coupled run
up to 90 min. for motors rated over 1kVac and 60 min. for others.
Vibration Measure velocity at bearing housings in the horizontal,
vertical and axial directions during motor coupled run.
Temperature Measure surface temperature of bearing housings by
non-contact type instrument during motor uncoupled run.
CRITERIA (Note 1) Vibration (Note 2) Not greater than xxxx mm/s, refer to ISO XXXXXX
Temperature (Note 2) Not more than 50 ℃ for temperature rise
TESTING INSTRUMENT Vibration
Temperature

RECORDED VALUE
Time after start (min.) 0 10 20

Starting current (A)

No load current (A)

DE Horizontal

DE Vertical
Motor Vibration
(mm/s, rms)

DE Axial

NDE Horizontal

NDE Vertical

NDE Axial

DE Bearing
Temp.
Motor

(°C)

NDE Bearing

DE Horizontal

DE Vertical
Pump Vibration
(mm/s, rms)

DE Axial

NDE Horizontal

NDE Vertical

NDE Axial

DE Bearing
Temp.
Pump

(°C)

NDE Bearing

RESULT Pass Fail Comment

Note: 1 In case of conflicts with the manufacturer's requirements, the manufacturer's requirements shall govern.

Prepared & Inspected by Inspected by Acknowledged by


Inspected by PT PP
Subcontractor PUSERTIF PT PLN UPK KIT SUL 1

Name
Date

Form IR-M-016
PROJECT PLTG 500 MW GE - LOMBOK

SOLO RUN TEST REPORT FOR MOTOR

OWNER : REPORT NO : QAQC/RE/004/00

CLIENT : EQUIP. NAME :

SYSTEM : DATE :

AREA :

MOTOR DATA

Manufacturer : Rated Voltage :

Type : Rated current :

Serial No. : Ins. Class :

Rated power : IP :

CRITERIA (Note 1) Vibration ISO-10816


Temperature Temperature of bearing < 40°C plus ambient temperature

TESTING INSTRUMENT Vibration

Temperature Gun

Tachometer

Multimeter

OBSERVED ROTATION The direction of rotation of a motor shall be same as that of a driven machine.

CW CCW

Nominal Voltage (V)

RECORDED VALUE

Time after start (min.) 15 30 45 60 75 90 105 120

Starting current (A)

No load current (A)

Speed (rpm)

DE Horizontal

DE Vertical
(mm/s, rms)
Vibration

DE Axial

NDE Horizontal

NDE Vertical

NDE Axial

Ambient

Body
Temp.
(℃)

DE Bearing

NDE Bearing

RESULT Pass Fail Comment

Note: 1 In case of conflicts with the manufacturer's requirements, the manufacturer's requirements shall govern.

Prepared by Witnessed By, Witnessed and Approved Acknowledged by


PT. HAP PT. PP ( Persero) Tbk PT GEOI PT. PLN PUSERTIF PT PLN BATAM
Name
Date
PROJECT PLTG 500 MW GE - LOMBOK

RUNNING TEST REPORT


OWNER : REPORT NO : QAQC/RE/004/00
CLIENT EQUIP. NAME :
SYSTEM : DATE :
AREA :

MOTOR DATA PUMP / FAN DATA


Manufacturer : Manufacturer :
Type : Type :
Serial No. : Serial No. :
Rated power : IP :
Rated Voltage : Head :
Rated current : Capacity :
Ins. Class : Power :
IP :

CRITERIA (Note 1) Vibration ISO-10816


Temperature Temperature of bearing < 40°C plus ambient temperature
TESTING INSTRUMENT Vibration
Temperature Gun
Tachometer
Multimeter
Noise

Nominal voltage (V)


Time after start (min.) 15 30 45 60 75 90 105 120

Starting current (A)

Nominal current (A)


Speed (rpm)

Noise (dBa)

Suction Pressure (bar - kg/cm2))

Discharge Pressure (bar - kg/cm2)

Ambient Temp.

DE Horizontal

DE Vertical
Motor Vibration
(mm/s)

DE Axial

NDE Horizontal

NDE Vertical

NDE Axial
Motor Temp.

Body
(°C)

DE Bearing

NDE Bearing

DE Horizontal

DE Vertical
Pump Vibration
(mm/s)

DE Axial

NDE Horizontal

NDE Vertical

NDE Axial
Pump Temp.

Body
(°C)

DE Bearing

NDE Bearing

RESULT Pass Fail Comment

Note: 1. In case of conflicts with the manufacturer's requirements, the manufacturer's requirements shall govern.

Prepared by Witnessed By, Witnessed and Approved Acknowledged by


PT. HAP PT. PP ( Persero) Tbk PT GEOI PT. PLN PUSERTIF PT PLN BATAM
Name
Date
MONITORING RADIOGRAPY
RESULT
NO AREA JOINT DATE REMAKS
ACC REJECT
1

10

11

12

13

14

15

16

17

18

19

20
GORONTALO GFPP 100 MW

SOLO RUN TEST REPORT FOR DIESEL ENGINE

CLIENT : PT PLN (PERSERO) REPORT NO : QC-COM-00


SYSTEM : FIRE FIGHTING REFF. DOC. : GRT-M-05-A1-PC012
SUBJECT : DIESEL ENGINE TYPE INSPECTION : SOLO RUN TEST
AREA : FIRE PUMP EQUIP. TAG NO. :

DATA SHEET
Manufacturer : Versa Corp Pty. Ltd
Type : Internal Combustion Engine
Model : VE 6T59162R
Serial No. : 6591627726
Rated : 119 kW / 162 HP
2900 rpm
Fuel Tank : 1000 ltr

PROCEDURE
Before starting the Engine pump test, the following conditions shall be established
1 Verity that all erection works is completed without major pending items that will hinder the execution of the test.
2 Make sure coupling disconnected from the Engine to Pump
3 Make sure the battery connection is tight
4 Make sure the engine oil is correct level
5 Make sure the Fuel valve is open position
6 Make sure the cooling system is good condition
7 Make sure the heater good function
8 Make sure the belt tension of radiator cooling and alternator are tight.
9 Ensure that required instruments are properly installed and functional
10 Confirm that the startup permissive conditions are established
11 Confirm that the diesel engine day tank is at normal level.
12 The pump to be tested and its related components are secured with proper tagging and clearance.

MANUAL RUNNING
To start engine :
1 Position mode selector switch to MANUAL RUN
2 Lift and hold MANUAL CRANK #1 until engine starts or release after 15 seconds. IF unit fails to start, wait for 15 seconds,
use MANUAL CRANK #2 and repeat step
3 If Cooling water is not flowing or engine temperature is too High, open cooling system cooling manual by-pass valve
4 Confirm the rotating direction, vibration, temperature, speed and recorded.
5 If no abnormally is observed during the jog operation, restart the engine of continuous operation and observed during the jog operation
conditions occurs.
Note: Should any abnormality occur during the diesel engine test (such as line leakage, sudden rise of bearing temperature and abnormal
conditions) stop the engine immediately and correct the problem before continuing the test

6 Record the equipment test data. The test data shall be recorded every 10 minutes for during 30 minutes.

To stop engine :
1 Return mode selector switch to AUTOMATIC and MANUAL STOP position, engine will stop.
2 Close cooling system manual by-pass valve.

Form IR-M-015
GORONTALO GFPP 100 MW

SOLO RUN TEST REPORT FOR DIESEL ENGINE

Form IR-M-015
GORONTALO GFPP 100 MW

SOLO RUN TEST REPORT FOR DIESEL ENGINE

VIBRATION AND TEMPERATURE MEASUREMENTS

TESTING INSTRUMENT Vibration


Temperature

OBSERVED ROTATION The direction of rotation of a motor shall be same as that of a driven machine.
CW CCW ……………….rpm
Nominal Voltage (V)
RECORDED VALUE
Time after start (min.) 0 10 20 30

Starting current (A)

No load current (A)

DE Horizontal

DE Vertical
(mm/s, rms)
Vibration

DE Axial

NDE Horizontal

NDE Vertical

NDE Axial

Ambient
Temp.
(℃)

DE Bearing

NDE Bearing

RESULT Pass Fail Comment

Prepared & Inspected by Witnessed by Approved by


Witnessed by PT PP
Subcontractor PT PLN UPK KIT SUL 1 PT PLN PUSERTIF

Name
Date

Form IR-M-015
GORONTALO GFPP 100 MW

RUNNING TEST REPORT

CLIENT : PT PLN (PERSERO) REPORT NO : QC-COM-00


SYSTEM : REFF. DOC. :
SUBJECT : TYPE INSPECTION :
AREA : EQUIP. NAME :

PUMP MOTOR
1 Manufacturer : Versa Corp Pty. Ltd. 1 Manufacturer : Versa Corp Pty. Ltd.
2 Type : Horizontal Split Case 2 Type : Induction Motor
3 Mfg. Model : V64310 3 Model : T 280M2-2
4 Serial No. : 64310775 4 Serial No. : 11096
5 Suction (inch) : 6inch 5 Rated Power : 110 kW
6 Discharge (inch) : 4inch 6 Rated Voltage : 380/660 Volt
7 Impeller Dia. (mm) : 257mm 7 Rated Current : 195/112 Amp
8 Head (m) : 8 IP :
9 Speed (rpm) : 2900rpm 9 Insulation Class : F
10 Year : 10 Speed : 2980 rpm
11 Years :

Form IR-M-016
GORONTALO GFPP 100 MW

SOLO RUN TEST REPORT FOR DIESEL ENGINE

CLIENT : PT PLN (PERSERO) REPORT NO : QC-COM-00


SYSTEM : FIRE FIGHTING REFF. DOC. : GRT-M-05-A1-PC012
SUBJECT : DIESEL ENGINE TYPE INSPECTION : SOLO RUN TEST
AREA : FIRE PUMP EQUIP. TAG NO. :

VIBRATION AND TEMPERATURE MEASUREMENTS

TESTING INSTRUMENT Vibration


Temperature

OBSERVED ROTATION The direction of rotation of a motor shall be same as that of a driven machine.
CW CCW ……………….rpm
Nominal Voltage (V)
RECORDED VALUE
Time after start (min.) 0 10 20 30 40 50 60

Starting current (A)

No load current (A)

DE Horizontal

DE Vertical
(mm/s, rms)
Vibration

DE Axial

NDE Horizontal

NDE Vertical

NDE Axial

Ambient
Temp.
(℃)

DE Bearing

NDE Bearing

RESULT Pass Fail Comment

Note: 1. In case of conflicts with the manufacturer's requirements, the manufacturer's requirements shall govern.

Prepared & Inspected by Witnessed & Approved by Acknowledged by


Witnessed by PT PP
Subcontractor PT PLN PUSERTIF PT PLN UPK KIT SUL 1

Form IR-M-015
GORONTALO GFPP 100 MW

SOLO RUN TEST REPORT FOR DIESEL ENGINE

Name
Date

Form IR-M-015
GORONTALO GFPP 100 MW

SOLO RUN TEST REPORT FOR DIESEL ENGINE

CLIENT : PT PLN (PERSERO) REPORT NO : QC-COM-00


SYSTEM : FIRE FIGHTING REFF. DOC. : GRT-M-05-A1-PC012
SUBJECT : DIESEL ENGINE TYPE INSPECTION : SOLO RUN TEST
AREA : FIRE PUMP EQUIP. TAG NO. :

VIBRATION AND TEMPERATURE MEASUREMENTS

TESTING INSTRUMENT Vibration


Temperature

OBSERVED ROTATION The direction of rotation of a motor shall be same as that of a driven machine.
CW CCW ……………….rpm
Nominal Voltage (V)
RECORDED VALUE
Time after start (min.) 70 80 90 100

Starting current (A)

No load current (A)

DE Horizontal

DE Vertical
(mm/s, rms)
Vibration

DE Axial

NDE Horizontal

NDE Vertical

NDE Axial

Ambient

Body
Temp.
(℃)

DE Bearing

NDE Bearing

RESULT Pass Fail Comment

Note: 1. In case of conflicts with the manufacturer's requirements, the manufacturer's requirements shall govern.

Prepared & Inspected by Witnessed & Approved by Acknowledged by


Witnessed by PT PP
Subcontractor PT PLN PUSERTIF PT PLN UPK KIT SUL 1

Name

Date
Form IR-M-015

You might also like