DATE: 19.02.23.
X
PENDING
(client busy 1. Render Image sent - 18 Jan
Jan-Feb '23) Mail sent- 29 & 30 Jan. 2. Tiles
Approved installed, wiring done, switch
5 D4 Zarjish Alam 01713-084283 √ √ √ √ √ √ √ 18.01.23. X by phone. X √ % pending for lack of main door
Remodelling, dismantling
7 A3 Shafiul Haq Sourav 01770-033663 X X X X X X X X X X √ % ongoing. No tiles. No wiring.
Interior Ongoing. All cabinet body
done (Excep Kitchen). পা ার
কাজ চলেছ। Kitchen Top Cabinet
will start. Bottom cabinet after
8 A6 Zaedul Haq Dipu 01793-591982 √ √ √ √ √ √ √ 29.11.22. √ √ 14.12.22. √ √ 75% gas connection.
Single paint coat. Tiles + thai
Kazi Abdullah Al done. Door laquer ongoing.
9 A8 Mahmud 01755-516640 X √ 31.01.23. √ X X X X X X √ % Budget sent- 07.02.23.
X PENDING Remodelling ongoing. , plaster
(Non will be done. Tiles not installed
10 B2 Abdullah Al Ahad 01717-194486 √ √ X √ 11.01.23. √ Rsponsive) X X X X X % yet. Wiring ongoing.