PRODUCTION LINE
Client’s requirements:
1. Raw material size: <200mm
2. Capacity: 120000tons per year (24 working
hours/day, 300 working days per year
3. Fuel: Natural gas or diesel
Notes:
1.All the equipment is subject to final design.
2.The silos and installation materials used for making support, platform, ladder, crossway are prepared by
Buyer.
1. Payment Term: 30% down payment by T/T, 70% to be paid before goods leave seller’s factory by T/T.
2. Time schedule:
Month
1st 2nd 3th 4th 5th 6th 7th
Item
Design
Purchasing
Manufacture
Shipment
Installation
Commissioning
Civil work&workshop
4. Packing: Before delivery, the equipment is treated for anti-corrosion. All the machines will be transported to
destination port by containers or by special vessel. Detailed quantity of containers may vary according to client’s
5. Warranty: The guarantee period is one year from the date when the trial run is finished, but not exceeds eighteen
months since the goods arrive at customer’s port. Wearing parts are not included in this term.
6. Installation and commissioning: After receiving advance payment, the seller will provide operation manual and
foundation drawing to the buyer. If the buyer requires, the seller shall send technicians to direct installation,
commissioning, trial-run, and training local workers. The buyer is responsible for board and lodging, round-trip
flight tickets, safety of technician. In addition, the buyer is responsible for technician’s salary, which is USD150-200
per day per person. If buyer installs the equipment by himself, the buyer himself will also be responsible for any
7. Validity: The quotation is valid for one month from the date stated in the first page above.