You are on page 1of 14

Planning

Group Work 02

Polytechnic University of the Philippines


BS Arch 3-3
Project Overview
Nation’s infrastructure development is leaning towards the north. Expedited
formation of ‘Clark Metropolitan’.
Real Estate Developments
Project Site

Project
Site
Project Site

Project Accessibility
Project Site
SITE VISUAL SURVEY
24 JULY 2018

SCTEX Tunnel Access


MacArthur Road Site
Frontage and Access

Tollgate Phase 1

SCTEX interchange

Exit Ramp to Clark


Airport

Entry Ramp to North


(Tarlac Province)
Project Site
SITE VISUAL SURVEY
24 JULY 2018

Other Hausland
Properties

Phase 1

future land
acquisition

Quarried lands

Long-term future land acquisition


Underpass
Project Site
SITE VISUAL SURVEY
24 JULY 2018

Underpass Phase 1

Quarried lands Sacobia River

future land
acquisition

Long-term future land acquisition


Project Site
SITE VISUAL SURVEY
24 JULY 2018

Phase 1

future land
acquisition
Project Site
SITE VISUAL SURVEY
24 JULY 2018

Mabalacat City Hall New Clark


Hausland Economic Housing
CIty
Phase 1

future land
acquisition

Quarried Lands
Area Distribution
SALEABLE
%
RESIDENTIAL
AFFORDABLE
MID
MID-UP
WALK-UPS
CONDO
MIXED USE 33%
COMMERCIAL
RETAIL
BPO/OFFICE
HOTEL 7%
INSDUSTRIAL
22%
PUBLIC FACILITIES
SCHOOL 1%
HOSPITAL 0%
CHURCH + SCHOOL 1%
NON-SALEABLE
ROAD 27%
GREEN & WATER 7%
UTILITY 2%
TOTAL 100%
Deliverables
• Scaled Model (1:2000)
• Design Concept (Reference Images)
– Site Analysis
– Land Use Distribution
– Township Design Concept
– Design Concept for each use (commercial, mixed
use, institutional – hospital, school, church, etc…)
– Area Distribution Computation
Time Table
• Jan 12 – Scaled Model Progress
• Jan 19 – Township Design Concept Progress
• Jan 26 – Presentation