You are on page 1of 4

Neminath Plot

Sr No Work Unit
1 Concret column & slab (196 Leter/m3) Tanker/slab
2 Colunm curing Tanker/days
3 Slab Curing Tanker/days
4 Brick Curing Tanker/days
5 Plaster Curing (internal / external) Tanker/days
6 Tiles / Others Work Tanker/days
7 Labour Tanker/days

Sr No Work Unit
1 Concret column & slab (196 Leter/m3) Tanker/slab
2 Colunm curing Tanker/floor

3 Slab Curing Tanker/floor

4 Brick Curing Tanker/floor

5 Plaster Curing (internal / external) Tanker/floor

6 Tiles/ other work Tanker/floor

7 Labour Tanker/Month
BUILDWELL CONSTRUCTION
Neminath Plot 21,45,72

Water Tanker Used per days /floor Curing /Labour used Days
2.25 115 m3
0.25 7days
0.25 7days
0.25 7days
0.25 7days
0.5 floor
0.36 30days
Total Water Tanker Used
one Tanker Rate
Total Amount of Water

Water Tanker Used per floor / Month Total floor/Month


2.25 20slab
1.5 20 Floors

1.5 20 Floors

1.5 20Floors

1.5 20 Floors

0.5 20 Floors
24 month
10.8
Total Water Tanker Used
one Tanker Rate
Total Amount of Water
ONSTRUCTION
Total Construction Area 45000SQFT
Total floor/Month Water used in Tankers Remark
20slab 45.08
20 Floors 30
20 floor 30
20 floor 30
20 floor 30
20 floor 10
24 month 259.2
ater Tanker Used 434.28
Tanker Rate 700
otal Amount of Water 303996

Water used in Tankers Remark


45.08 115 M3
30

30

30

30

10
120 Liter/ Day/per head ( average 30 labour per
259.2 Month)
434.28
700
303996

You might also like