TOCONVERTRATEPER TORATEPER MULTIPLYBY
Cube M3 0.353
Square M2 0.1075
Sq.ft. M2 10.7584
L.ft. M 3.28
Cwt Kg 0.02
2
CONCRETE
PREAMBLE
Assumptions:
¾ Mixingconcreteusingaconcretemixer14/10cu.ft.Capacity&manualloadingare
thebasisonwhichthenormsareworked.
¾ Agangofoneskilled&sixunskilledlabourersproduce3.00cubesofconcreteper
dayusinga14/10cu.ftcapacityconcretemixer.Thisisasperacceptedpractice.
¾ Theproductionofconcreteisatthemixersite;transportingmixedconcrete&
placingsameinpositionispaidforseparately.
¾ Inconcreteitems26to39bothinclusive,placingofconcretecolumns,Beams&
floorslabsonthegroundfloorthelabourcomponentallowedisfortheplacingof
concretebetweenthegroundfloor&thetopofthe1stfloorslabwhichareais
calledthegroundfloorarea.Similarlytheareabetweenthetopofthe1stfloor
slab&thetopofthe2ndfloorslabiscalledthe1stfloorareaetc.
19.MixingConcrete1:3:6(1½“)
PerCube
Materials;
13cwt(50kgbags)Cement
0.53CubesSand
0.92Cubes1½”Metal
1/3Dayhireofmixer
Water(110gals)
Labour;
1/3DaysSK.labourer
2daysU/SKLabourer
RateperCube
NOTE:
¾ Wateravailableatsite
¾ Ifwaterisnotavailableallowancesshouldbemadefortransportofwater
¾ Sandincluded15%forbulking
10
20.MixingConcrete1:2:5(1“)
PerCube
Material;
14cwt(50kgbags)Cement
0.60CubesSand
0.90Cubes1”Metal
1/3Dayhireofmixer
Water(110gals)
Labour;
1/3DaysSK.labourer
2daysU/SKLabourer
RateperCube
NOTE:
¾ Wateravailableatsite
¾ Ifwaterisnotavailableallowancesshouldbemadefortransportofwater
¾ Sandincluded15%forbulking
21.MixingConcrete1:2:4(3/4“)
PerCube
Material;
18cwt(50kgbags)Cement
0.50CubesSand
0.88Cubes3/4”Metal
1/3Dayhireofmixer
Water(120gals)
Labour;
1/3DaysSK.labourer
2daysU/SKLabourer
RateperCube
NOTE:
¾ Wateravailableatsite
¾ Ifwaterisnotavailableallowancesshouldbemadefortransportofwater
¾ Sandincludes15%forbulking
11
22.MixingConcrete1:1½:3(3/4“)
PerCube
Materials;
23cwt(50kgbags)Cement
0.42CubesSand
0.82Cubes3/4”Metal
1/3Dayhireofmixer
Water(150gals)
Labour;
1/3DaysSK.labourer
2daysU/SKLabourer
RateperCube
NOTE:
¾ Wateravailableatsite
¾ Ifwaterisnotavailableallowancesshouldbemadefortransportofwater
¾ Sandincludes15%forbulking
23.MixingConcrete1:1:2(3/4“)
PerCube
Materials;
31cwt(50kgbags)Cement
0.44CubesSand
0.96Cubes3/4”Metal
1/3Dayhireofmixer
Water(200gals)
Labour;
1/3DaysSK.labourer
2daysU/SKLabourer
RateperCube
NOTE:
¾ Wateravailableatsite
¾ Ifwaterisnotavailableallowancesshouldbemadefortransportofwater
¾ Sandincludes15%forbulking
12