1.

Complete construction works in 06 towns of Amolatar, Patongo, Purongo, Ibuje, Opit and
Ovujo.

2. Commence construction works in the 08 towns of Dokolo T.C, Midigo, Okollo, Pacego,
Kalongo, Pajule, Amach and Moyo T.C.

3. Complete detailed designs of piped water supply systems for the 10 towns of Loro,
Namasale, Bibia/Elegu, Pabbo, Pacego, Zombo T.C, Acholibur, Rackoko, Amach and
Agago T.C.

4. Complete detailed designs of integrated sanitation systems for the 03 towns of Kitgum
TC, Paidha TC and Dokolo TC.

5. 03 water schemes in former IDP camps (installed with ERT-II Solar energy packages) re-
sized/ converted.

6. Construct 641 sanitation facilities in 08 towns of Dokolo T.C, Midigo, Okollo, Pacego,
Kalongo, Pajule, Amach and Moyo T.C.

7. Rehabilitation and O&M 2support to 04 TSs/RGCs under nUws.

8. Complete WSDF-N office fencing and landscaping.

9. Construction 01 integrated sanitation for Kitgum T.C.

10. Extend hydropower national grid to 04 towns of Kamdini, Oyam, Adjumani and
Amolatar.

1
40units at HHs, 16 units at primary schools, 08 units in public places
2
Operation and Maintenance