INDIVIDUAL ASSIGNMENT
CASESTUDY:
INSPECTION ON EXISTING CONDITION OF SMALL-SCALE SPACE AND PROPOSED
REFURBISHMENT WORKS AT AHMAD SHUKRI ENTERPRISE, PENGKALAN HULU,
PERAK.
Prepared for:
ENCIK MAHAYUDIN MAHMOOD
Prepared by:
NAME STUDENT ID.
FARAH NURSAFIKA BINTI FAZAIL 2019217944
Class:
AP2294A
Semester:
MARCH 2021-AUGUST 2021
Date of Submission:
WEEK 10
ACKNOWLEDGEMENT
First and foremost, I would want to express my gratitude to Allah, the highest power,
for providing me with direction and support throughout my life, allowing me to complete this
assignment report without any major issues. Despite the fact that problems came with lessons
after lessons, I completed my work without further delay thanks to His direction. In the time
allotted, I was able to complete this individual project for subject BSR 555 Building
Pathology III for the assigned case study.
Next, I would like to express my gratitude to Mr. Mahayudin Bin Mahmood, who
served as the lecturer for this subject and provided guidance as well as information about the
subject through consultation throughout the tutorial and lecture classes. I would not have
been able to complete this assignment without the assistance of my lecturer.
Thank you to Encik Shukri, the owner of Ahmad Shukri Enterprise, for cooperating
with me in allowing me to inspect the building and interview him. I will not be able to
complete this task without the knowledge from this case study. Finally, I'd like to express my
gratitude to my family and friends for their assistance in helping me achieve this BSR 555
individual project.
TABLE OF CONTENT
NO CONTENT PAGE
Acknowledgement
List of Contents
List of Figures
List of Tables
List of Charts
1.0 Introduction
1.1 Selected Spaces / Area
2.0 Description of Property
3.0 Building Information
3.1 Location Plan
3.2 Site Plan
4.0 Limitation of Inspection
5.0 Method of Inspection
NO TABLES PAGE
LIST OF CHART
1.0 INTRODUCTION
5 Location of the building No.4 Bangunan Mara, Jalan Iskandar, 33100 Pengkalan
Hulu, Perak Darul Ridzuan
Based on the site plan, Ahmad Shukri Enterprise can be founded at No.4 Bangunan
Mara, Jalan Iskandar, 33100 Pengkalan Hulu, Perak. This building surrounded with
Restaurant and Mobile Phone Service Shop. The building is also located in front the
main road and close to traffic lights.
4.0 LIMITATION OF INSPECTION
The inspection was limited to the accessible parts of such commercial building,
which included the main areas and the storeroom, except the toilet and "surau."Building
Assessment Rating System (BARIS) by Royal Institute of Surveyor Malaysia (RISM) as
referred in CPBS101 are used as a tool to rate the condition, priority and matrix of defect
and also for the overall building rating.
No Methods Description
.
• To measure distance,
width or
• Photographic evidence of
a defect or element is
taken with this device.
Building Condition Assessments are used to analyse the building's condition and
severe flaws, and BARIS is used to characterise the data (Building Assessment Rating
System). Priority assessment, condition assessment, and matrix must all be confirmed to
provide the overall building rating of the defects.
The term "external / site condition" refers to the external components of the area that have
been assessed during the inspection process. Surrounding shops and parking lots are
examples of external elements in this case study. Both of these elements are in fine working
order and have no defects.
The fabric and component for this building include the elements such as wall, floor, and
door. The defects for fabric are recorded as below.
6.1.1 Wall
The wall for this shop building is using two types of element which is brickwall and
plywood. The defects that identified for this elements are peeling of paint (refer
defect sheet F03/07) and damaged and brittle plywood walls (refer defect sheet
F04/07).
6.1.2 Floor
The floor with cement render finishes has hole in the floor at the front of the counter
(refer defect sheet F01/07) recorded and patch on the floor in the counter area (refer
defect sheet F05/07). This finishes will be upgraded into the vinyl floor finishes.
6.3 SERVICES
It defines the mechanical and electrical services provided by the structure. Due to only
one services that aren't functioning as it used to which is wall fan, the overall condition
of the mechanical services in this building can be classified as good, according to the
condition survey.
7.0 DEFECT ANALYSIS
The findings in Ahmad Shukri Enterprise are analysed into a Schedule of Building
Condition, a pie chart of analysis by building elements, category of defects, and category
of causes based on the visual inspection and non-destructive testing. For the analysis,
Microsoft Excel is used for easier tabulation, precise calculation, and chart creation.
Based on this pie chart, its shows the analysis of defect by element in the Ahmad
Shukri Shop which consist of wall, element ceiling, floor and mechanical services. Wall is
the highest because it is the most effected element which founded four defects at the
element due to the old building condition. The others elements shows same value and
defect founded that occurred which is one.
7.2 ANALYSIS BY CATEGORY OF DEFECT
Based on the pie charts, it shows types of defects recorded during the inspection at
Ahmad Shukri Enterprise. There are total of seven defects comprises of five have founded
at the buildings. The defects consist of multifunctioning, peeling of paint, hole, damages
and broken. Peeling of paint is the highest, while other defects also show a high value as
the building is already twenty years old. Repairing work should be done in the
refurbishment works to avoid the defects become worse in the future.
7.3 ANALYSIS BY CATEGORY OF CAUSES
Based on this pie chart, its represent the analysis by category of causes that consist of
four categories which is design, maintenance, human usage and workmanship.
Maintenance is the highest category because this building appears to rarely make
improvements. Workmanship also founded the 2nd highest because the result of inaccurate
work and many shortcomings seem at the buildings. The others two categories shared the
same value.
8.0 DEFECT SHEET
Human-usage /
Insect
Disaster
Figure 12.1:
Close View
Table 8.1.1 – Defect sheet F01/07
Defect Sheet No. F02/07 Location Main Area
Element Ceiling
Photo/sketches: Component Ceiling tiles
Finding
Condition Priority Matrix Colour
2 2 4
Defect Description:
- Broken ceiling
Prognosis:
- Could be harmful to the occupant and
easily for animal access into the shop.
- Reduce the aesthetic value
Figure 1.0:
Possible Causes:
Foresight view - Poor workmanship
Remedies:
Category /
1. Replace the
Design temporarily placed
Maintenance / ceiling with a new
actually ceiling.
Construction 2. Apply new chalk
material paint to make it
look neater.
Workmanship /
Environment
Human-usage
Figure 1.1:
Insect
Close view
2 1 2
Defect Description:
- Peeling of paint because of move the socket
Prognosis:
- Reduce the aesthetic value
Possible Causes:
- Poor workmanship
Construction
material
Workmanship /
Environment
Human-usage
Insect
Figure 1.1:
Close view
3 2 6
Defect Description:
- Damaged and brittle plywood walls.
Prognosis:
- Reduce the aesthetic value.
Possible Causes:
- Humidity Problems and long-term use.
Figure 1.0:
Remedies:
Foresight view Category /
1. Replace the plywood
Design board with a new
Maintenance / one.
Construction
material
Workmanship
Environment
Human-usage
Figure 1.1:
Insect
Close view
3 2 6
Defect Description:
- Patch on the floor in the counter area
Prognosis:
- Reduce the aesthetic value
Possible Causes:
- Poor workmandship
Figure 1.0: - Due to poor design and cause
Foresight view
Remedies:
Category /
1. Fill the patching
Design / material properly.
Maintenance
Construction
material
Workmanship
Environment
Human-usage /
Figure 1.1:
Insect
Close view
2 2 4
Defect Description:
- Peeling of paint
Prognosis:
- Reduce the aesthetic value
Figure 1.0:
Foresight view Possible Causes:
Remedies:
Category /
1. Scrapethe old paint
Design by using scraper to
Maintenance / remove all the dirt
and uneven surface.
Construction
material 2.Start painting and
apply multiple
Figure 1.1: coats.
Workmanship /
Close view
Environment
Human-usage
Insect
2 2 4
Defect Description:
- The wall fan is old and cannot
function anymore.
Prognosis:
Figure 1.0: - The workers and customers will
feel uncomfortable due to hot
Foresight view weather.
Possible Causes:
Remedies:
Category /
1. Replace the fan
Design with a new one.
Maintenance /
Construction
material
Figure 1.1:
Close view Workmanship
Environment
Human-usage
Insect
F
6
F S
4 7
F F
3 2
F
1 F
5
Figure 10.1 - Old Building Layout Figure 10.3 - New Building Layout
Perspective 1 Perspective 1
Figure 10.2 - Old Building Layout Figure 10.4 - New Building Layout
Perspective 2 Perspective 2
Table 10.1.1 – Slight comparison for proposed refurbishment works
11.0 DETAILS OF REFURBISHMENT WORK
BEFORE AFTER
Figure 11.1 - Old door, overhead Figure 11.2 New door, double sliding
rolling door door
Table 11.1- Before and After installation of Main Door
ii. Installation of Floor Tiles
Existing floor finishes was recorded with lots of hole that caused by
the expansion of plaster and load live pressure.
This holes will getting worse if did not run any improvement works
and can cause injuries to employees and customers such as
tripping.
The old floor finishes must be upgrade from cement screed to floor
vinyl.
By upgrading this, the floor will look more beautiful and the price of
the material is very reasonable and low maintenance. The floor space
in the building will also look more exclusive
BEFORE AFTER
No picture before
No picture before
refurbishment works.
B Demolition works
1. DOOR
To dismantle and
remove, making good affected
No. 1 RM60 RM60
area and clearing away debris
to designated area.
a) 4200mm x 4200mm
Overhead Rolling
Door.
2. FLOOR FINISHES
Cement render
To hack off and removed the
a)7000mm x
old cement render at selected 1800mm RM7.50 RM222.10
m 2
(main space)
area, making good affected
area and clearing away debris b)4598mm x
to designated area. 3700mm
(store room)
a) 7000mm x 1800mm
= 29.613
(main space) m2
b) 4598mm x 3700mm
(store room)
3. CEILING FINISHES No.
a)7000mm x RM30.00 RM30.00
Ceiling board 1800mm
To remove the 700mm x (main space)
1880mm old ceiling board , b)4598mm x
making good, affected area and 3700mm
(store room)
cleaning away debris to
designated area. = 29.613
m2
a) 700mm x 1880mm
(main space)
b) 4598mm x 3700mm
(store room)
C New Works
1. DOOR
Installation of 1700mm
x 2000mm aluminium Lump - - RM8,944.00
sum
double sliding door with fixed
glass wall.
2. FLOOR FINISHES
a)7000mm x
Installation of vinyl floor tiles 1800mm
at selected space. (main space)
a) 7000mm x 1800mm m2 b) 4598mm x RM15.05 RM445.68
(main space) 3700mm
(store room)
b) 4598mm x 3700mm
(store room) = 29.613 m2
3. CEILING FINISHES
Installation of acoustical
ceiling tiles.
c) 7000mm x 1800mm Lump
sum - - RM3,500.00
(main space)
d) 4598mm x 3700mm
(store room)
4. PARTITION
2 RM1,731.00 RM3,462.00
Installation of 2 rooms divider No.
In conclusion, the space in the property quite small but the inspection not covered all
of the spaces in the building. The inspection consists of main area of the shop and store
room that used to put the stock. Defect that have been found in the building's and materials
need to be repaired or making an improvement so that it makes the condition in the shop
more attractive and tidy for the comfort of customers as well as employees. The refurbishing
work also includes the addition of new spaces and furniture with a partition and also replace
the old and defect materials.
Based on the result of the inspection on this building, total of seven defects found,
each with a different elements and causes. According to the Schedule of Building
Conditions (SOBC), which is based on the Building Assessment Rating System (BARIS),
the overall condition of this building is good and safe for customers and occupants. All of
these defects shall eventually need to be repaired in order to prevent the building's