You are on page 1of 1

Share Important Information 2nd Week of may 2020

No Information Status Remark


1. RO Plant B Board Panel Broken Waiting Spare part
2. LFO Forwarding Pump A Pump A broken when heat run test during U3 Waiting material (will be normalize on U4
PO PO)
3. U4 HP FW HTR 7 LVL -Deviation between sensor A and B, can’t put Will be replace during U4 PO. Currently
to average. waiting PR from PLN
-Hunting during storm
4. U3 Dual Flow Band SC A Can’t open and close Waiting material, waiting PR from PLN
Blow Valve
5. U3 Long Retractable SB Bending Waiting material
5-L
6. U3 Turbine Zero speed Module abnormal Waiting material (31 march 2020)
7. U3 Screen wash pump A the pump is running but no discharge pressure Repaired pump in warehouse (will be
carried out during outage work)
8. U3 Economizer Outlet can’t read actual value In progress repair
flue gas oxygen right (B2)
9. U4 IDF A & B Outlet flue there is big deviation between IDF A & B Outlet Investigation
gas pressure flue gas pressure
10. Sootblower U4 PLC blurred condition Waiting material
monitor
11. U4 Control Valve 1 CONTROL VALVE NO.1 position at dcs different investigation
with control valve 2 and control valve 3
12. Sea Water Feed Pump A Vibration Waiting spare part
13. U4 EHC Oil Pump B Get low pressure alarm investigation
14. U4 Generator Frequency U4 gen Freq (4GEN -HSIG 093) abnormal Need calibration
(50.21HZ),indication Frequency bias < L ALARM