ER Morning routine checks-Edda Sphynx (IMO 9777319)
AC-room (A-deck) M T W T F S Su Remarks
u h a DG 1 HT Exp Tk DG 2 HT Exp Tk DG 3 HT Exp Tk DG 4 HT Exp Tk Aux.Machinery system 1 Exp Tk Aux.Machinery system 2 Exp Tk Aux.Machinery system 3&4 Exp Tk Aux.Machinery system 5 Exp Tk Aux.Machinery system 6 Exp Tk Check AC-room for abnormalities AHU Fan units - Check conditions FWD Thruster Room M T W T F S Su Remarks u h a Check Bow Thruster No 1 and header Tk Check Bow Thruster No 2 and Header Tk Check Retractable AzimuthThruster No 3 and Header Tk Check FW Osmosis unit No 1 Check FW Osmosis unit No 2 Check FW Generator/Evaporator Port Sewage treament unit No 1 Stbd Sewage treament unit No 2 Check condition of Water mist unit Check and if necessary empty the bilge wells Engine Room - ECR/2nd Deck M T W T F S Su Remarks u h a Drain FO Service Tk's (221P&S and 222P&S) 4 Tk's in total Check oil level on starting air comp. 1. Check oil level on starting air comp. 2. Check oil level on starting air comp. 3 Check oil level on starting air comp. 4 Drain starting air bottles. Check provision refrigeration compressor No 1 & No 2 Engine Room - Tanktop Deck M T W T F S Su Remarks u h a Check oil level on LO sep 1. Check oil level on LO sep 2. Check oil level on F.O. sep 1. Check oil level on F.O. sep 2. Check oil level on DG 1. Check oil level on DG 2. Check oil level on DG 3. Check oil level on DG 4. Check oil level on generator bearings DG 1. Check oil level on generator bearings DG 2. Check oil level on generator bearings DG 3. Check oil level on generator bearings DG 4. Drain from DG start air inlet Check for oil/fuel/water under engines and generators. Check all SW,FW coolers and pumps Check Bilge &Sludge pumps Check and Drain Stbd FO Sett. Tk Check and if necessary empty the bilge wells Aux.Mach. Room/Pump room M T W T F S Su Remarks u h a Check oil level on Service air comp 1 & 2 and drain off manually. Check inside Transformer room and bilge well Check and drain Port FO Sett.Tk Check cool.p/p's and coolers for aux.system 5&6 Check FW Hydrophor pumps and Tk's Drain Service air tanks. Check oil level and freon on Chill Wtr comp system No 1 (Port) Check oil level and freon on Chill Wtr comp system No 2 (Stbd) Check chill water pressure of circ.p/p's (normal 4.2-4.5bar) Check and if necessary empty the bilge wells Check condition of the pumps and remote valves Check the Ballast Treatment Unit Check in Client cargo hold for abnormalities
Aft Thruster room and Stern Thruster M T W T F S Su Remarks
u h a Check Stern Thruster No 4 and Header Tk's Check condition of two standalone AC-units Check oil level and condition of Azimuth Thruster No 5 Check oil level and condition of Azimuth Thruster No 6 Check Port & STBD AC units in Aft Thruster room Check pipes and connections for leakages Check and if necessary empty the bilge wells Check Port&Stbd emergency exits from aft thruster room.