1.

First let’s assign all resources


2. Assume management want to reduce duration less than one month, we can John help to
engineering job part time. As a result, duration changed to 30 day and cost increased.
Overallocation of welder occurred.
3. First give overtime hour to finish job. Increase cost
4. Or leveling within the slack-increased duration to 31 day again.