Professional Documents
Culture Documents
No SHE-SIS-JSA-001
TERMINAL BULKING LAND II PROJECT
Rev : A Date: 01-11-2013
TERMINAL BULKING LAND II PROJECT – PT. ISAB & PT. LDC INDONESIA LAMPUNG
CONSTRUCTION OF TANK CAP 6500, 5100, 4000 MT & FACILITIES
JOB SAFETY AND ENVIRONMENTAL ANALYSIS WORKSHEET
TASK: CONFINED SPACES DATE : 01-11-2013 JSEA No : RW – 022 – Rev. A
JSEA TEAM : FABRICATION DEPT Elwin Salamuddin Indra M.Dian Abadi
Putra Ilham Faisil Bambang
Type of Work Related: (please indicate by ticking yes / no box)
YES NO YES NO YES NO YES NO YES NO
General Work Electrical Isolation √ Scaffolding Gas Test Required Solid/Liquid Waste √
1. Tool box meeting 1. Personnel unfamiliar with the 1. All personnel shall attend company - Supervisor
working environment – new induction prior to working on site - Foreman
employee 1a. New employees shall be closed
2. Lack of competency and monitoring and supervised
experience personnel 2. Fitter and cutter shall be properly
3. Miss understanding and miss trained (Confined Space Training) and
communication lead by superior
3. Working instruction shall be clear and
understandable by all personnel
3a. Maintain a proper communication is
in place to avoid miss
communication
2 Preparation of works 1. Employee may not be suitable 1. Supervision will select experienced - Supervisor
physically or psychologically for competent person, health checks, test - Foreman
task. May not be able to turn to confirm ability to turn around in - Team
around inside pipe to make a safe pipe will be conducted.
exit 2. Supervision to inform HSE Dept prior
2. Team may not be aware of task or to commence the work in confined
prepared to address a worst case space
rescue scenario. 3. Supervision with employee to review
3. Suitability of each item required all equipment.
Doc. No SHE-SIS-JSA-001
TERMINAL BULKING LAND II PROJECT
Rev : A Date: 01-11-2013
4. Cutting, bevelling and pre- 1. Flash fire might occur due to 1. Fire extinguisher shall be standby - Supervisor
heating in confined spaces leakage on hoses or connection 1a. Only spark lighters shall be used to - Foreman
during process ignite torches, no matches or - Fitter
2. Hot sparks might expose to cigarette lighters shall be utilized. - Cutter
Doc. No SHE-SIS-JSA-001
TERMINAL BULKING LAND II PROJECT
Rev : A Date: 01-11-2013
confined space gouging sparks exposed to welding sparks away from flammable - Foreman
flammable / combustible material. and combustible material. - Welder
7. Hot sparks might expose to skin 1a. Material shall be covered with fire - Gouger
8. Pinched in between material and retardant as appropriate such as fire
machine or object blanket
9. Fumes might be effected and 1b. Fire Extinguisher shall be in closure
dangerous to health during position where welding takes place
process welding and gouging 2. Proper PPE shall be worn
10. Noise risk during gouging process 3. Keep away from line of fire of
11. Electrical shock from poor potential pinched point
electrical insulation on wire / 3a. Seek an assistance to lift the
electrical cable which damaged or material if needed
leakage 4. Ensure Fumes respirator is worn
during the process of work
5. Particular PPE shall be worn prior to
commence welding / gouging work –
ear plug
6. All electrical connection shall be
checked to detect the poor condition
of insulation of cable electrical
connection
6a.. Electrical works (Repair,
modification of electrical system)
Doc. No SHE-SIS-JSA-001
TERMINAL BULKING LAND II PROJECT
Rev : A Date: 01-11-2013