CONSTRUCTION BUDGET STUDY
FOR A RESIDENTIAL PROJECT OF
THE DESIGNING ARCHITECT
Group 5:
Group Members
KHAREN ALIMURUNG
TRIXIE MARIE CAMPO
TYRONE JUSTIN DE GUZMAN
MA. KRISTA LYN ESPINA
MARY ALEXIEN GAMUAC
KARISSA LIMOS
LINDSAY ANN SANDIONGCO

Submitted to:
AR. BEATA. NIÑA YAEL LINGAT
I. Pre-design: (2,000 - 5,000)
1st meeting: discussion of requirements
Description Estimated Cost
Print out of design portfolio 350-400
Transportation 100-500
Dine out/ café 3pax: 1500-2000
2nd meeting: initial site visit
Transportation (depends on site location but if by road;) 500-1000
Dine out/ café (could be sponsored by client but BYOB) 500
Total 4,400
II. Schematic design phase (6,200-14,700-16,700)
3rd meeting: first proposal
Schematic plans (3days planning) 1500 - 3000
Perspectives (1 exterior, optional interior, 3d model) 1500-2500 per view – 6000
min : 3500 for 3d model
Initial construction cost estimates 1500 - 3000
Print out 350
Transportation 500-1000
Food (could be sponsored by client) 500
4th meeting: final design proposal
Revision labor cost (1-2 days) 1000-2000
Print out 350
Transportation 500-1000
Food (could be sponsored by client) 500
Total 14,700
th
5 meeting: (optional)
III. Contract documents/ bidding phase (32,600-60,000)
Architectural design development (3 days to 1 week) 3000-6000
Minimum number of sheets for working drawings/ permit documents
Architectural (A1-A5) 5 sheets
Structural (S1-S3) 3 sheets
Electrical (E1-E3) 3 sheets
Plumbing (P1-P3) 3 sheets
ECE (optional if w/ LAN network and/or CCTV) 3 sheets
Mechanical (optional if using split-type ACU) 2 sheets
Total
Drafting cost: (14-19 sheets) 14,000-19,000
(excluding revisions)
Printing cost (14-19 sheets)
Plotting (100- 150 per sheet) 2100 - 2900
Blueprinting (15-20 per print, at least 7 copies) 1500 – 2700
Other documents: (specifications, bom, engineering analyses) 340-350
Total
Consultant engineers’ fees
Estimates 1500-3000
Structural analysis (if 2 storeys or more) 8000-15000
Plumbing - certification 250 per toilet set
Electrical – certification 1500-3000
Mechanical – certification 1500-3000
Electronics – certification 1500-2000
Total 57,200
IV. Construction phase
6-month project duration 18-24 visits: cost per visit (1150-5900-11900 up per diem)
1st month: 2 visits, layouting, before pouring of foundation,
initial chb laying for ground floor
2nd month: 2 visits 2nd floor slab, initial chb laying for 2nd floor
3rd month: 2 visits, roof framing, check structural shell
revisions, check utility stub-outs
4th month: 4 visits, finishing phase, additional detail production,
revisions,
5th month: 4 visits, finishing phase, detail clarification
6th month: 4 visits, turn-over phase, punch-listing
Per diem per person (if out of town 2500 minimum) 500-1000
Transportation 500-1000 (basic)
2000-4000 (plus toll
fees: out of town road
trip)
8000-16000 (plane fare:
inter-island)
Food 150 (per meal per person
allowance)
450 (per whole day)
500+ (per meal
minimum if fine dining)
Accommodations (if warranted; client’s provision/ reimbursable) 1500 (per room per night
minimum)
4000-8000 (per night
average)
12000-16000 (per night
premium)
Clerical support/ additional labor/ workload during the construction phase (18000-24000)
1 work day per week for first 3 months (12 days) 6000
2-3 work days per week for the next 3 months to completion, 12000-18000
24-36 days
Total 30,000
V. Post Construction Phase: As-Built Plans (sometimes prepared by contractor but
mostly supported by us architects)
Summary
Pre-design Phase 4,400
Schematic Phase 14,700
Contract documents phase 57,200
Construction phase: (6-month duration) 30,000
Site visits
Clerical support
Estimated Total Range: 106,300