DIAMER BASHA DAM PROJECT

( CONTRACT NO. MW-1 )

Material Sampling Request

Reference / Letter
RIT # AC-S3-2022-03 Arrival Date 10-Aug-2022
#

Material Accelerator Manufacture SIKA Sampling Date 13-Aug-2022

Batch Plant #02


Location Specification ASTM C-494 Total Qty
Area #13

Qty (Ton)
S/No Description Remarks

1 Sika Sigunit L-15 AF-11 (Batch No 220713-FP007803) 15.00

Remarks:

Contractor Representative : Engineer's Representative :

Name & Signature Name & Signature