Occupational Safety and health Administration (OSHA)

Accident in Indonesia

Name : Muhammad Dastur


Matric No : P-RM0030/22

Reg564 Sustainable Buildings


Dr. Siti Hamidah Husain 1
In the development of construction projects in Indonesia, the application of occupational safety and health
is still not optimal. Many construction workers experience work accidents every year, material damage,
production failures and delays in construction workers cause the company to suffer many losses.
ISSUE

Occupational accidents often occur due to the lack of attention of construction project implementers to
the requirements and regulations in Occupational Safety and Health (OSH). Therefore, work safety is an
aspect that must be considered at all times because as we know, safety issues are very complex issues that
include issues from a humanitarian standpoint and economic benefits, legal aspects, accountability and the
image of the organization itself. Occupational Safety and Health (OSH) are some of the most important
factors in supporting the achievement of the goals of a project. Occupational Safety and Health can only
work if there is work from a number of parties directly involved in the construction project, starting from
the owner, contractor and field workers. 2
Risk Of Work Accidents
In Construction Projects
The building service business is one of the industries
with a relatively high risk of workplace accidents.
• Different work sites
• open and impacted weather
• limited execution time
• dynamic and demanding high physical endurance,
• and the usage of a large number of unskilled
personnel
are the primary causes of work accidents in
construction projects. Because of a lack of public
knowledge of workplace safety concerns, as well as a
lack of government law enforcement, work safety laws
are still far from optimum, resulting in a high
frequency of workplace accidents.

3
Case study : Double Double Track (DDT) Project, Jatinegara

Double-double track (DDT)


project on Jalan Matraman Raya,
Kampung Melayu, Jatinegara, East
Jakarta- Indonesia.

aims to accelerate the movement


of passengers,

PT Waskita Karya (Persero)

4
Case study : Double Double Track (DDT) Project, Jatinegara

Accident Case Double Double Track


(DDT) Project, 04 February 2018
The chronology of the DDT construction
accident. Crane which is used to lift girder
concrete for double-double track (DDT)
collapsed

Preliminary Accident Conditions


The workers were lifting up rail pads with a
crane, when it was on top, the crane holder
slipped and it dropped all of the concrete rail
pads down below. the launcher bearings are
not installed properly on the pillars of the Conditions during a Construction Accident
elevated railroad. As a result, four people died
5
Case study : Double Double Track (DDT) Project, Jatinegara

In this case one person was named a suspect, who acted as the
operator of the gantry launcher. He made a mistake resulting in a
work accident

in this case it was found that the bearing was not in the right
position but had been removed by the operator who was operating
the lifting equipment,"

At that time, the workers were about to install the lower cross beam
(LCB) on the segment falfe on the CP.22 pole. When the LCVB was
lifted and was about to be placed on the galse segment, suddenly the
front leg of the gantry launcher came off and the false segment
cradle. This condition made the gantry launcher slump and the LCB
hit a false segment, so that the victims in each CP.22 fell and died.

6
Evaluation of Causes of Construction Accidents

HR problems

Equipment Problems
 Lack of discipline in implementing
Standard Operating Procedures
 The safety factor in its implementation
 There is no supervising consultant is still low resulting in an accident
working on every construction accident

7
Negative Impacts After a Work Accident Occurs

AFFECTED IMPACT PRECAUTION


SUBJECTS
Manpower • Injured, died • Conduct a toolbox meeting before starting work
• Causing doubts for other workers • Participate in work method training

society • Injured, died • Carry out optimal control of hazards


• Feel uncomfortable living around the • Outreach to the community regarding the control
project area of hazards that may arise from the project

Project • The project has been temporarily halted • Prepare a Construction Safety Analysis before
• Late development results are used carrying out the work
• Idle workforce
• Idle equipment
• Return on investment has decreased

Company • Incompetent • Running a Construction Safety Management


• The value of the stock goes down System
• Provide training on work methods to the
workforce

8
Construction Safety Target

Protect workers and others


in the workplace (formal or
informal)

Ensuring that each construction


material/equipment is used safely
and efficiently

SAFETY
Ensuring the construction
FIRST process runs smoothly

9
Efforts to improve the construction service delivery system by
paying attention to OSH in Indonesia

a. Improve process management related to:


 Standard Operating Procedure (SOP).The entire implementation of
construction work must comply with the stages of implementation in
the SOP;
 Standardization of equipment, calibration and service life. Every
equipment to be used must meet calibration standards and service
life before carrying out work;
 Tool and operator certification. Heavy equipment operators must
have competence according to their field as evidenced by a valid
Operator License;
 Fulfillment of personnel and qualifications of supervisory consultants
in accordance with the needs of infrastructure project development
10
b. Improve supervision of the work performed, especially in
additional shifts to ensure workers are in prime condition before
carrying out work. Supervision is not only carried out by supervisory
consultants, but also by service users and even by contractors.
c. Pay attention to the welfare of workers;
d. Any implementation of high risk work (Elevated
Construction), including when changing work shifts, must be attended
and approved by 3 (three) parties (Owner, Executor and Consultant);
e. OSH must be included in the specification and quantity list;
f. Give a warning to contractors and consultants in charge of
construction projects that have accidents.

11
Conclusion
Accidents that take place on the workplace might cause a significant amount
of financial damage. A setback not only for the company's workforce but also
for the business overall. For this reason, establishing strong occupational safety
and health management is particularly crucial for risk reduction.

12
References
Occupational Health and Safety management system Guidelines for the
implementation of OHSAS 18001:2007. (2008). OHSAS Project Group.

Puspita, S. (2018, Februari 4). Begini Kondisi "Crane" yang Jatuh di Jatinegara.
Retrieved Maret 19, 2018, from Kompas.com: https://megapolitan.
kompas.com/read/2018/02/04/1056

The Construction Plant-hire Association Tower Crane. Operator's Handbook.


Newbury Street, Barbican, London. 2008.

13
Terima Kasih

14

You might also like