Safety Recommendations 1
Tom Leslie
and forceful trench collapse at Pivotal Site 22 E in Guelph, Ontario. This incident is a
clear message to site management, highlighting the crucial need to prioritize the safety
of workers at the construction site. To find out the root causes and make suggestions
for procedural changes to avoid such incidents in the future, a site investigation was
procedures, regulatory compliance, and interviews with casualty and the workers
involved. In this analysis, the causes of the accident were acknowledged, and
appropriate measures were recommended to improve safety protocols and ensure the
During the inspection, several significant findings were uncovered. Firstly, the
worker had experienced a similar incident in the past, where a trench collapsed. Even
though no injuries were sustained in the previous occurrence, the site management
identifying potential issues or patterns that could have been addressed to avoid a
recurrence.
Secondly, even though Occupational Safety Act (OSA) specified all the
procedures for workers entering trenches, highlighting the importance of using movable
trench shoring, in the company's safety manual, no specific guidelines were provided for
workers to enter and work safely. Even the site management did not use basic safety
In addition, the investigations highlighted a gap between the first aid procedures.
There was a detailed procedure for contacting emergency services, but the first aid
administration could not provide clear information on essential medical assistance. This
Further information was gathered through the site manager and crew members'
interviews. The site manager admitted leaving Kevin responsible for supervising the
trenching work while handling office duties. This fact indicates that there were issues
with supervision at the worksite, which is a cause for concern. It highlights the
importance of having clear communication and adequate care to ensure safety and
concerns about the safety of the trench walls, which Kevin ignored. Here Kevin's
disregarded warnings and proceeds with his actions show the lack of adherence to
trenches without incident and was unaware of the Occupational Safety Act regulations
of safe trenchwork. This expressed how site management should have paid more
attention to their responsibility to provide thorough training and ensure that all workers
knew the necessary safety protocols. At the same time, if the project was behind
Analysis of Trench Collapse Accident at Pivotal Construction Site: Root Causes and
Safety Recommendations 4
schedule, the site management could have adjusted the project timeline without
As measures for these root causes, the company needs to adjust its safety
include:
3. Establish procedures and guidelines for safe trench entry, including using
4. Ensure compliance with safety regulations, including the OSA, through regular
effectively.
and regulations.
the crucial importance of prioritizing worker safety on construction sites . Root causes