Project Management
MNG 201
Lecture Six & Seven
Second Term (2021- 2022)
71 Dr. Mahmoud Malek
Dr. Asmaa Soliman
2) Arrow Directions
M T
C j
A
One B S One
Start End
M T
S T
5) Dummy Activities with Duration equal to zero
C j
Notes
74
A Activities (J) depend on activities (C, B)
j j Activity (S) depend on Activity (B)
B
S
M T
C j
A
B S
M T
5) Dummy Activities with Duration equal to zero
Z
75 R Notes
A C Activities (J, R) depend on activities (C,
j
B)
Activity (S) depend on Activity (B)
R
B j
J, R
S
M
T
R
C Z
A j
B S
M T
5) Dummy Activities with Duration equal to zero
76 R Notes
A C Activities (R) depend on activities (C, B)
j
Activity (S) depend on Activity (B)
Activity (J) depend on Activity (B)
R
B R
S
M
T
C j
A
R
B S
T
Solved Examples on Activity On Arrow (A.O.A)
77
Ex (1):
A project of installing new Cabinets, Based on the
data given below:
1. Draw an arrow diagram
2. Determine The Total Time of The Project
3. Determine The Critical Paths(s)
4. Determine the ES, EF and Free Float for all
activities
5. Draw Bar Chart for Critical Path Only.
6. If Day 18 Nonworking day, what is the total time
with drawing
Ex (2):
A project of installing new Cabinets, Based on
the data given below:
1. Draw an arrow diagram
2. Determine The Total Time of The Project
3. Determine The Critical Paths(s)
4. Determine the ES, EF and Free Float for all
activities
5. Draw Bar Chart for Critical Path Only.
6. Determine Free Float For all Activities
R T
E F
D Z
Q B
N
S
P