The document reports on the replacement of a faulty deep sea controller panel at a customer site. It notes that the original panel was blank and troubleshooting found a DC supply but the controller would not power on. A new controller was then installed and tested, and the automatic transfer switch now works properly. The report recommends that the automatic transfer switch panel is now functioning correctly.
The document reports on the replacement of a faulty deep sea controller panel at a customer site. It notes that the original panel was blank and troubleshooting found a DC supply but the controller would not power on. A new controller was then installed and tested, and the automatic transfer switch now works properly. The report recommends that the automatic transfer switch panel is now functioning correctly.
The document reports on the replacement of a faulty deep sea controller panel at a customer site. It notes that the original panel was blank and troubleshooting found a DC supply but the controller would not power on. A new controller was then installed and tested, and the automatic transfer switch now works properly. The report recommends that the automatic transfer switch panel is now functioning correctly.
The picture pointed with black arrow was newly replaced deep sea controller panel.
Address: No 30 Onitsha/Elf Road,
Trans-Amadi Industrial Layout, Port Harcourt. Rivers State, Nigeria. 19-09-2021
SITE REPORT
Reported By: ASANBE AKOREDE
Department: POWER SYSTEMS – APPLICATION Customer/Company: SHELL DRILL Location: PORT HARCOURT
Main Task: Replacement of faulty Deep Sea Controller panel of a 2+1 ATS Panel.
Tasks
1. Initial Physical inspection on the ATS panel.
2. The faulty Deep Sea controller panel appears blank. 3. Troubleshooting was done and it was discovered that, there was a DC supply to the faulty controller but, the controller fails to come up/alive. 4. A new Deep Sea controller was installed after initial inspection and Troubleshooting. 5. The ATS was tested by putting off the public supply to test run the newly replaced Deep Sea controller. 6. The ATS works perfectly when we returned the public supply.
COMMENT/RECOMMENDATION
1. The ATS panel is working fine now.
Mantrac Rep: Name/Signature: Date:
NLNG Rep: Name/Signature Date:
BCNL Rep: Name/Signature: Date:
Commissioning Engineer signature:
Customer Signature: ______________ _ ______________ Date: Date: 4/10/2007 /10/2007 -_ The picture pointed with black arrow was newly replaced deep sea controller panel.
Mantrac Rep: Name/Signature: Date:
NLNG Rep: Name/Signature Date:
BCNL Rep: Name/Signature: Date:
Commissioning Engineer signature:
Customer Signature: ______________ _ ______________ -_ The picture pointed with black arrow was newly replaced deep sea controller panel.