The picture pointed with black arrow was newly replaced deep sea controller panel.

Address: No 30 Onitsha/Elf Road,


Trans-Amadi Industrial Layout, Port
Harcourt. Rivers State, Nigeria.
19-09-2021

SITE REPORT

Reported By: ASANBE AKOREDE


Department: POWER SYSTEMS – APPLICATION
Customer/Company: SHELL DRILL
Location: PORT HARCOURT

Main Task: Replacement of faulty Deep Sea Controller panel of a 2+1 ATS
Panel.

Tasks

1. Initial Physical inspection on the ATS panel.


2. The faulty Deep Sea controller panel appears blank.
3. Troubleshooting was done and it was discovered that, there was a DC supply to
the faulty controller but, the controller fails to come up/alive.
4. A new Deep Sea controller was installed after initial inspection and
Troubleshooting.
5. The ATS was tested by putting off the public supply to test run the newly replaced
Deep Sea controller.
6. The ATS works perfectly when we returned the public supply.

COMMENT/RECOMMENDATION

1. The ATS panel is working fine now.

Mantrac Rep: Name/Signature: Date:

NLNG Rep: Name/Signature Date:

BCNL Rep: Name/Signature: Date:

Commissioning Engineer signature:


Customer Signature: ______________ _
______________ Date:
Date: 4/10/2007
/10/2007
-_
The picture pointed with black arrow was newly replaced deep sea controller panel.

Mantrac Rep: Name/Signature: Date:

NLNG Rep: Name/Signature Date:

BCNL Rep: Name/Signature: Date:

Commissioning Engineer signature:


Customer Signature: ______________ _
______________
-_
The picture pointed with black arrow was newly replaced deep sea controller panel.

Mantrac Rep: Name/Signature: Date:

NLNG Rep: Name/Signature Date:

BCNL Rep: Name/Signature: Date:

Commissioning Engineer signature: