WI lines Rev.0 4‐Jul‐2016

CO 4 CO 4 CO 5


CO 2 CO 3
CO 1 TB Crossings  OC Crossings  Tie‐in Manif.  Latest
n well DGS FLW mt Flw m Well Hus Nos. Aug‐16 Sep‐16 Oct‐16 Nov‐16 Dec‐16 2017‐jan 2017‐Feb 2017‐March 2017‐Apr 2017‐May
Comp.date
Mob. Nos Nos Nos.
(Opt) (Opt)
(Opt) (Opt) (Opt)
80 HU ‐ 12‐Nov‐16 11/12/2016
1
100 12‐11‐2016 11/12/2016
1 Zb‐099 HM NCS 100 0 0

Tie‐in NCS 11/12/2016
1
12‐Nov‐16 11/12/2016
1 HU ‐ 12‐Nov‐16
Zb‐075 existing
2 HM  NCS 0 0 0
(Existing flw)
11/12/2016
1165 1165 12/17/2016
1 HU ‐ 17‐Dec‐16
2912 Tie‐in      12/17/2016
3 Zb‐094 (from Zb‐247) HM NCS 2912 0 1 17‐12‐2016
Zb‐247
#VALUE! 12/17/2016
1 HU ‐ 17‐Dec‐16
4 Zb‐219 (WI‐013) from Zb‐278 HM UMCS 150
150
0 0
Tie‐in   17‐12‐2016 12/17/2016
Zb‐ 278
#VALUE! 1456 1/21/2017
1 HU ‐ 21‐Jan‐17
5 Zb‐234 (WI‐P15) from Zb‐105 HM UMCS 3300
3300
1 4
Tie‐in   21‐1‐2017
1/21/2017
Zb‐ 105
1/21/2017
1 HU ‐ 21‐Jan‐17
6
Zb‐207 (WI‐120S)
(existing Flw)
ZM LMCS 0 0 0
1
Tie‐in LMCS Call OFF Phase 1 <‐‐ existing

21‐Jan‐17 1/21/2017
499 HU ‐ 25‐Feb‐17 2/25/2017
1
7 Zb‐280 (WI‐O23 Dir) from Zb‐207 ZM LMCS 998
998
0 0
Tie‐in   25‐2‐2017 2/25/2017
Zb‐ 207
HU ‐ 25‐Feb‐17 2/25/2017
1
132 25‐2‐2017 2/25/2017
8 Zb‐272 (WI‐AF15)  HM NCS 132 0 0
Tie‐in NCS
1
25‐Feb‐2017 2/25/2017
23 116 31 HU ‐ 8‐Apr‐17 4/8/2017
1
170 8‐4‐2017 4/8/2017
9 Zb‐082 HM SCS 170 0 0
Tie‐in SCS
1
8‐Apr‐2017 4/8/2017
1708 1594 HU ‐ 28‐May‐17 5/28/2017
Zb‐297 (AL‐35V) 1
4269 Corridor 3300m 28‐2‐17  PRESERV. FLW (tbd) 2/28/2017
10 LMCS 4269 1 5
(Pipeline in Corridor A) Tie‐in LMCS
1
PIPELINEs LAID IN THE SAME TRENCH       28‐May‐2017 5/28/2017
1708 1594 11/27/2017
AM‐36_M
5319 Corridor 3300m 20‐4‐17 PRESERVATIO 4/20/2017
11 LMCS 5319 1 6
(Pipeline in Corridor A)
11/27/2017
#VALUE! 2265 HU ‐ 28‐May‐17 5/28/2017
AH‐21_3V 1
7476 28‐5‐2017 5/28/2017
12 NCS 7476 0 4
(Pipeline in Corridor B) Tie‐in NCS
1
28‐May‐2017 5/28/2017
1400 1400 9/5/2017
AH‐19_3
4713 Corridor 2800m 31‐5‐2017 5/31/2017
13 NCS 4713 0 2
(Pipeline in Corridor B) PIPELINEs LAID IN THE SAME TRENCH
9/5/2017
1000 1000 2/5/2018
AI‐18_M
3058 Corridor  2000m 31‐5‐2017
31‐5‐2017 5/31/2017
14 NCS 3058 0 1
(Pipeline in Corridor B)
2/5/2018
MOBILIZATION 1 31‐12‐2016 12/31/2016

Call Off Q.ty 1     32,597            11               3            23               6