FM 200 SUPRESSION SYSTEM PIPE PNEUMATIC PRESSURE

TEST RECORD

NATIONAL GRID CORPORATION OF THE PHILIPPINES

Instrument Check Sheet


Contractor: ASISI Systems Corp.
Date of
Type / Function Manufacturer Model No Serial No Cert Rec’d
Calibration

PRESSURE
GUAGE

REMARKS / INSTRUMENTS USED.

Tested By Name Signature Date

Witnessed By Name Signature Date

Witnessed By Name Signature Date


FM 200 SUPRESSION SYSTEM PIPE PNEUMATIC PRESSURE
TEST RECORD

NATIONAL GRID CORPORATION OF THE PHILIPPINES

ENGINEERS REPORT SHEET

Location:

Initial Reading Pressure @ 40 psi

Final Reading Pressure after 10 mins@ 40 psi

REMARKS / INSTRUMENTS USED.

Tested By Name Signature Date

Witnessed By Name Signature Date

Witnessed By Name Signature Date


FM 200 SUPRESSION SYSTEM PIPE PNEUMATIC PRESSURE
TEST RECORD

NATIONAL GRID CORPORATION OF THE PHILIPPINES

CLIENT: CONTRACTOR: ASISI Systems Corp.

PROJECT: TEST ENGINEER:

SYSTEM: FM 200 Fire Suppression System DATE:

LOCATION:

Pneumatic Pressure Test for Clean Agent Gas Suppression System

System Ref Location Drawing Reference

System Working Pressure Test Pressure Testing Media

360 psi (Once the Agent 40 psi Compressed Air - Compressor


Discharges)

Time Pressure Bubble Test

First Reading (40 PSI)

Second Reading (After 10 Mins)

Test Result: Pass / Fail


Pressure Drop ```
(Max. loss -20% within 10 Mins)
Pipe Clearance (Puff)
Pass / Fail
Test/Discharge of Air
Schematic Layout.

REMARKS / INSTRUMENTS USED.

Tested By Name Signature Date

Witnessed By Name Signature Date

Witnessed By Name Signature Date