Employer Doc. No.

NSRP Contractor Doc. No.


Complex Project Nghi Son Refinery and Petrochemical S-000-1730-0815M
Limited Liability Company
Nghi Son, Vietnam Rev. 0 Page 1 of 10

Employer Contract No.: , Contractor JOB Code: 0-6495-20 Date: 08/SEP/15

Detail Pre-commissioning Procedure for Service Test

of Service Water for Unit 040/041/042/043

Unit No.: 040/041/042/043

Unit Abbreviation.: NHDS/PENEX/CCR/CCRR

Document Class: Z

Issue Purpose For Construction

Rev Date Page Description Prep'd Chk'd App'd

0 08/SEP/15 All For Construction NSR SG SM


A 07/JUL/15 All For Review NSR SG SM

Operation Centre JOB Code: Operation Centre Doc. No.:


Responsible Company Prepared by Checked by Approved by
TPM N.Wisatsiri S.Gibson S. Mariotti

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 2 of 10
of Service Water for Unit 040/041/042/043 S-000-1730-0815M

CONTENTS

1 INTRODUCTION .................................................................................................................................. 3
2 REFERENCE DOCUMENTS ............................................................................................................... 3
3 DEFINITIONS ....................................................................................................................................... 3
4 ABBREVATIONS ................................................................................................................................. 4
5 SCOPE OF APPLICATION.................................................................................................................. 4
6 HSE....................................................................................................................................................... 4
7 TRAINING AND COMPETENCY OF PERSONNEL............................................................................ 5
8 ROLES AND RESPONSIBILITIES ...................................................................................................... 5
9 IMPLEMENTATION OF SERVICE TESTOF PIPELINES ................................................................... 7
10 ACCEPTANCE CRITERIA ................................................................................................................. 10
11 POST WORK ...................................................................................................................................... 10
12 ATTACHMENTS................................................................................................................................. 10

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 3 of 10
of Service Water for Unit 040/041/042/043 S-000-1730-0815M

1 INTRODUCTION

This document provides a general method for the Service Test of Service Water for Unit

040/041/042/043 by separate to Section A is Service Test for common Utility header (Service Water)

of Unit 040/042/043 and Section B is Service Test for common Utility header (Service Water) of Unit

041. The Service test is a method of test, used for checking of leaks at Equipment or of piping

systems. Prior to the Mechanical Completion activities, systems are subjected to a Service test such

that it prevents any uncontrollable leakage of process fluids. It is carried out after hydrostatic or

pneumatic test (pressure test) these tests may also be referred to as Tightness Test or gross air leak

test.

2 REFERENCE DOCUMENTS

S-000-1710-0001V Pre-commissioning and Commissioning Execution Plan

S-000-1710-0100V Pipe Cleaning Guide

S-000-1710-0120V General Pre-commissioning & Commissioning Procedure Tightness Test

S-000-1240-0001V Project Overall HSE Plan

X-XXX-XXXX-XXXX Flange Management Procedure

X-XXX-XXXX-XXXX Bolt Tensioning and Torqueing Procedure

X-XXX-XXXX-XXXX Mechanical Isolation Procedure

3 DEFINITIONS

The following terms are defined in Project Coordination Procedure (S-000-1140-0001V)

 Employer
Nghi Son Refinery and Petrochemical Limited Liability Company

 Contractor
A Joint Venture formed by JGC Corporation, Chiyoda Corporation, GS Engineering &
Construction Corporation, SK Engineering & Construction Co., Ltd., Technip France and
Technip Geoproduction (M) Sdn. Bhd.

 JVD
Contractor's Joint Venture Directorate

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 4 of 10
of Service Water for Unit 040/041/042/043 S-000-1730-0815M

4 ABBREVATIONS

HSE - Health, Safety and Environment


JHA - Job Hazard Analysis
PPE - Personnel Protective Equipment
RA - Risk Assessment
PTW - Permit to work

5 SCOPE OF APPLICATION

The scope of this document is the Service test of Service Water for Unit 040/041/042/043 by

separate to Section A is Service Test for Common Utility header (Service Water) of Unit 040/042/043

and Section B is Service Test for Common Utility header (Service Water) of Unit 041. The Utility

piping of this unit shall be subjected to a gross air leak test If required with Nitrogen or Dry Air prior to

mechanical completion of the unit, it will also be subjected to Inerting / Passivation during the

commissioning phase and there shall be separate procedures for these activities, Header where

possible the process medium shall be use on completion. The system can be put into service.

6 HSE

The following HSE risks are inherent in Tightness Test. All personnel shall give top priority to the

management of health, safety and the environment (HSE). All work shall be undertaken in a

responsible manner giving full consideration to the impact of the activities may have on health, safety,

and the environment.

Specific Health and Safety requirements for this Pre-commissioning Procedure are:

1. Before executing activities stated in this Pre-commissioning Procedure, a Job Hazard

Analysis (JHA), Risk Assessment (RA), and Tool Box Talk shall be carried out.

2. Appropriate Personal Protective Equipment (PPE) as determined by the JHA and Risk

Assessment which shall be worn by all personnel assigned to execute these activities.

3. Ensure to follow recommended actions given in MSDS for chemicals as applicable.

4. If motorized equipment is used, refuelling shall not take place while equipment is running.

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 5 of 10
of Service Water for Unit 040/041/042/043 S-000-1730-0815M

5. If electric tools are used, they shall be powered either by a 110-volt supply or by battery.

6. Additional safety precautions are provided in the specific Tightness Test for the system.

7 TRAINING AND COMPETENCY OF PERSONNEL

All activities covered in this Procedure shall be performed only by qualified and competent personnel.

In addition, all personnel must have completed the HSE training. If sub-contractors or persons, other

than commissioning personnel, will assist in the execution of activities covered by this

Pre-commissioning procedure then those person(s) also shall attend HSE training and meet the

requirements for the HSE standard. Additionally, a qualified and competent commissioning

supervisor shall indoctrinate the sub-contractor or person(s) in the Tightness Test philosophy and

methodology.

8 ROLES AND RESPONSIBILITIES

The Roles and Responsibilities of various parties are provided below.

8.1 Employers Commissioning Team

Commissioning Engineer/Manager

1. Responsible for witnessing the test.

2. Responsible for accepting or rejecting the test.

Construction Representative

Employers representative will witness all Pre-commissioning testing.

8.2 Contractor’s Pre-Commissioning Team

Commissioning Manager

1. Overall control of Sub-contractor and Contractor commissioning team during execution of

commissioning operations.

2. Liaison with Employers commissioning representatives for executing the commissioning

operations.

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 6 of 10
of Service Water for Unit 040/041/042/043 S-000-1730-0815M

3. Vendor mobilisation plan will be made and HSE induction will be coordinated upon their arrival

to site.

4. Commissioning Report/Dossier submission to the Employer.

5. Overall supervision of Pre-commissioning activities.

Pre-Commissioning Engineer

1. Responsible for the safety of all personnel assigned to him, ensuring that the JHA, applicable

permits and control measures are in place prior to applying the method statement.

2. Responsible for the final acceptance of test results.

3. Responsible for supporting the testing team & for setting all applicable test requirement and

conditions.

4. Responsible for ensuring all resources, tools, test equipment etc., are available at the test

site.

5. Responsible for coordinating the works with other parties that may be required and parties

affected by executing the method statement.

6. Coordinate construction Work Packs with Employers representatives.

Operators

1. Responsible for ensuring that the work as outlined in the method statement is performed

safely and all safeguards & controls are complied with.

2. Responsible for preparing the equipment, system for testing or activities as outlined in this

method statement.

3. Responsible for executing the tests/activities as outlined in the method statement and as

instructed by the Supervisor/Commissioning Vendor Engineers.

4. Vendor engineers will work in coordination with the Contractor Pre-Commissioning

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 7 of 10
of Service Water for Unit 040/041/042/043 S-000-1730-0815M

(discipline) Engineer.

9 IMPLEMENTATION OF TIGHTNESS TEST OF PIPELINES

9.1 PRE-CLEANING / PRESERVATION

During site installation of the equipment, piping is pre-cleaned by flushing, blowing or hydro-jetting,

depending on contamination and required cleanliness level.

9.2 DETAILED SCOPE

Service Test of Service Water for Unit 040/041/042/043 by separate to Section A is Service Test for
common Utility header (Service Water) of Unit 040/042/043 and Section B Service Test for common
Utility header (Service Water) of Unit 041 refer to attached P&ID’s Mark-up. The Service test shall be
carried out.

Section A Common header (Service Water) of Unit 040/042/043

System No. System Test Pressure Service Test Attachment No.


Description MPa(g). Package No.
NHDS Service
040-SVW-01 0.32
Water
042-SVW-01 CCR Service Water 0.32 000-SVW-01-SV-1 S-000-1730-0815M_0020
CCRR Service
043-SVW-01 0.32
Water

Section B Common header (Service Water) of Unit 041

System No. System Test Pressure Service Test Attachment No.


Description MPa(g). Package No.
PENEX Service
041-SVW-01 0.32 041-SVW-01-SV-1 S-000-1730-0815M_0030
Water

9.3 General Description & Classification

(1) Gross Air Tightness Test

This test is performed for all the hydrocarbon and utility piping systems using Air. This is done to

confirm the integrity of the Joints, Flange Gaskets, Glands and Packing of valves. Here the

system is pressurized with injection of Compressed air and then checked for leaks at all possible

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 8 of 10
of Service Water for Unit 040/041/042/043 S-000-1730-0815M

points of leakage. This test is carried out at 7 barg or at the system operating pressure whichever

is less.

(2) Tightness Test with Nitrogen

This test is performed for smaller systems using Nitrogen in place of Air. This test is performed for

Refrigeration and other cold service lines.

(3) Specialized Service Test Procedure

Nitrogen-Helium Service Testis one of the Specialized test procedure normally performed by a

Specialized contractor. This test is performed for hydrocarbon systems only. Helium Service Test

will use 99% Nitrogen and 1 % Helium as tracer gas. A calibrated Mass Spectrometer will be used

to detect the helium tracer gas. The Helium Service Test will be carried out at 90% of system

design pressure and will be performed after the normal Gross Air tightness test. After the Service

Testis performed, the system will be depressurized to 1 barg pressure to keep the system inerted

and preserved done during commissioning.

(4) In service test

This test is performed on low pressure systems generally utilities, where the actual operating fluid

is utilized as any leaks will not create an environmental or safety issue.

9.4 Procedure

1. Method of Testing

System is pressurized with injection of compressed air or nitrogen and then checked for leaks at all

possible points such as:


(a) Flanges
(b) Screw Connections
(c) Manholes and Handholes
(d) Valve Glands

Detection of leakage is by application of a leak detection solution (such as soap solution) and the

subsequent observation of bubble formation.

2. Test Pressure

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 9 of 10
of Service Water for Unit 040/041/042/043 S-000-1730-0815M

Shall Be the normal operating pressure of the fluid system .

3. Precaution

The following precautions must be observed during System Service tests:

 Barricade the area and install warning signs.

 The over-pressure protection of the system must be put in service. PSV discharge

outlets shall be routed to a safe location with adequate bracing and barricading to

prevent equipment damage or personal injury.

 A local calibrated pressure gauge shall be installed in an easily accessible location.

4. Planning

1. Equipment and associated pipelines must be grouped according to their normal operating

pressure. Each grouped system is isolated using block valves.

2. Systems subjected to system leak tests must be clearly marked on P&ID including the following

items:

 Test Pressure

 Supply point and type of pressurization medium

 Location of boundary valves, sub-dividing system into groups

 Blinds and spades if applied

 Valve’s Open/Close position

 Pressure monitoring instruments to be used

 Depressurizing points to be used after the test completion or in case of emergency.

5. Preparation

 Availability of air must be confirmed prior to the test.

 Leak detection solution (such as soap solution) must be provided at site.

 Flanges with diameter of 6" or larger is wrapped with masking tape to check for

leakage via a marked puncture in tape.

 In accordance with the test plan, CONTRACTOR checks the tested portions and

confirms the readiness for the test.

 Drain free water from system prior to the test so that foaming or bubbling action of

soap solution can be clearly seen at the leakage points.

D R A
IN
10-SE
P - 2 0 15
Employer Doc. No.
NSRP Complex Project Rev. 0

Title: Detail Pre-commissioning Procedure for Service Test Contractor Doc. No.
Page 10 of 10
of Service Water for Unit 040/041/042/043 S-000-1730-0815M

6. Implementation

1. Gradually pressurize system to the test pressure with process fluid.

2. Maintain system under the test pressure until the test has been completed.

3. All points to be checked and shall be applied with soap solution.

4. Any leakage points found during the test shall be re-tightened until the bubble formation

stops. If leak cannot be stopped, system or part of system will be depressurized and the

joint or connection shall be remade after inspection for physical damage and then

re-tested.

10 ACCEPTANCE CRITERIA

1. Any criteria given by Vendor/Licensor with regard to leakage, the test result shall fall within this
criterion.

2. If foam or bubbles are not visually detected, the test is accepted as tight.

3. Check/inspection above shall be done by CONTRACTOR with EMPLOYER's witness.

Note: Depending on the service, small leakage from valve glands may be acceptable

11 POST WORK

1. After the system passes the Tightness test, the system shall be depressurized or left with a small

nitrogen blanket as required by site conditions.

2. Piping shall be reinstated as per P&ID.

3. Signing of the test document by CONTRACTOR 's supervisor and EMPLOYER 's witness shall be

done after the test completion.

4. Test Log sheets shall be signed by the Contractor and Employer and handed over to the

Company.

12 ATTACHMENTS

- Attachment: S-000-1730-0815M_0020 Marked-up P&ID for Service Test Package 000-SVW-01-SV-1.


- Attachment: S-000-1730-0815M_0030 Marked-up P&ID for Service Test Package 041-SVW-01-SV-1.
- Attachment: S-000-1730-0815M_0040: Inspection Record Sheet.

D R A
IN
10-SE
P - 2 0 15
Attachment : S-000-1730-0815M_0_0020 System No. : 040-SVW-01,042-SVW-01,043-SVW-01 Package No. : 000-SVW-01-SV-1
Page 1 of 10
127(6

SECTION A UNIT 040 / 042 / 043


3(50$1(17/,1(68%-(&772+,*+35(6685(/($.7(677(6735(6685(#03D J 

PERMANENT LINE TO
PERMANENT LINE SUBJECT SUBJECT TOLEAK
HIGH PRESSURE SERVICE
TEST; TESTTEST; TEST
PRESSURE @ 3.35 PRESSURE
MPa(g) @ 0.32 MPa(g)

3(50$1(17/,1(68%-(&772/2:35(6685(/($.7(677(6735(6685(#03D J

TEST POINT
7(6732,17

FULLY
)8//<23(1OPEN

CLOSE
&/26(

REMOVE AND INSTALL TEMPORARY VALVE OR SPOOLS


5(029($1',167$//7(0325$5<9$/9(256322/6

&200(17$&7,21 ANY SPECIAL COMMENT / ACTION AS REQUIRED SUCH AS "ROTATE BLIND"


$1<63(&,$/&200(17$&7,21$65(48,5('68&+$6527$7(%/,1'

TEMPORARY
7(0325$5<%/,1'63$'(BLIND / SPADE

(03/2<(5':*1R 7,7/(
5()(5(1&('5$:,1*6

6 25 79 TEMPORARY SPOOLS (S) OR TEMPORARY VALVE (V) NUMBER


7(0325$5<6322/6 6 257(0325$5<9$/9( 9 180%(5

5(9 '$7( '(6&5,37,21 35(3


' &+.
' $33
'
5(9,6,21

35(3$5(' $33529('

3* 25 7, TEMPORARY INSTRUMENTS (PG,TG,etc)


7(0325$5<,167580(176 3*7*HWF

1653
&203/(;352-(&7
1*+,6215(),1(5<$1'3(752&+(0,&$/
1*+,6219,(71$0 /,0,7('/,$%,/,7<&203$1<

81,7  6<0%2/2*<

TEMPORARY HOSE OR PIPING


'5$:,1*7,7/(
'9

7(0325$5<+26(253,3,1* 3,3,1*$1',167580(17',$*5$0

&2175$&725-2%&2'( 25,*,1$7('%< -*&


&2175$&725':*1R 3&:%6
'9

TEMPORARY SPOOL
,668(385326( '2&&/$66
7(0325$5<6322/ =
(03/2<(5&2175$&71R 6,=( 6&$/(
$ 121(

R A (03/2<(5':*1R 6+((7 5(9


$

N D
I 10-SEP 5
- 2 0 1
2) $
Attachment : S-000-1730-0815M_0_0020 System No. : 040-SVW-01,042-SVW-01,043-SVW-01 Package No. : 000-SVW-01-SV-1
Page 2 of 10

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

Control system pressure at operation SVW supply from SVW Interconnecting


pressure of SVW =0.32 MPa(g) Header. Permanent Supply required

040-SVW-01 040-SVW-01 141-SVW-01S

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0815M_0_0020 System No. : 040-SVW-01,042-SVW-01,043-SVW-01 Package No. : 000-SVW-01-SV-1
Page 3 of 10

040-SVW-01

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-SVW-01
040-SVW-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0815M_0_0020 System No. : 040-SVW-01,042-SVW-01,043-SVW-01 Package No. : 000-SVW-01-SV-1
Page 4 of 10

042-SVW-01 040-SVW-01

040-SVW-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0815M_0_0020 System No. : 040-SVW-01,042-SVW-01,043-SVW-01 Package No. : 000-SVW-01-SV-1
Page 5 of 10

042-SVW-01

042-SVW-01

D R A 043-SVW-01
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0815M_0_0020 System No. : 040-SVW-01,042-SVW-01,043-SVW-01 Package No. : 000-SVW-01-SV-1
Page 6 of 10

043-SVW-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0815M_0_0020 System No. : 040-SVW-01,042-SVW-01,043-SVW-01 Package No. : 000-SVW-01-SV-1
Page 7 of 10

043-SVW-01

Control system pressure at operation


pressure of SVW =0.32 MPa(g)

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0815M_0_0020 System No. : 040-SVW-01,042-SVW-01,043-SVW-01 Package No. : 000-SVW-01-SV-1
Page 8 of 10

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-SVW-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0815M_0_0020 System No. : 040-SVW-01,042-SVW-01,043-SVW-01 Package No. : 000-SVW-01-SV-1
Page 9 of 10

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

040-SVW-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0815M_0_0020 System No. : 040-SVW-01,042-SVW-01,043-SVW-01 Package No. : 000-SVW-01-SV-1
Page 10 of 10

PERMANENT LINE
SUBJECT TO
SERVICE TEST

TEST POINT

042-SVW-01

D R A
N
I 10-SEP 5
- 2 0 1
Attachment : S-000-1730-0815M_0_0030 System No. : 041-SVW-01
127(6

SECTION B UNIT 041 Package No. : 041-SVW-01-SV-1 Page 1 of 7

3(50$1(17/,1(68%-(&772+,*+35(6685(/($.7(677(6735(6685(#03D J 

PERMANENT LINE TO
PERMANENT LINE SUBJECT SUBJECT TOLEAK
HIGH PRESSURE SERVICE
TEST; TESTTEST; TEST
PRESSURE @ 3.35 PRESSURE
MPa(g) @ 0.32 MPa (g)

3(50$1(17/,1(68%-(&772/2:35(6685(/($.7(677(6735(6685(#03D J

TEST POINT
7(6732,17

FULLY OPEN
)8//<23(1

CLOSE
&/26(

REMOVE AND INSTALL TEMPORARY VALVE OR SPOOLS


5(029($1',167$//7(0325$5<9$/9(256322/6

&200(17$&7,21 ANY SPECIAL COMMENT / ACTION AS REQUIRED SUCH AS "ROTATE BLIND"


$1<63(&,$/&200(17$&7,21$65(48,5('68&+$6527$7(%/,1'

TEMPORARY
7(0325$5<%/,1'63$'(BLIND / SPADE

(03/2<(5':*1R 7,7/(
5()(5(1&('5$:,1*6

6 25 79 TEMPORARY SPOOLS (S) OR TEMPORARY VALVE (V) NUMBER


7(0325$5<6322/6 6 257(0325$5<9$/9( 9 180%(5

5(9 '$7( '(6&5,37,21 35(3


' &+.
' $33
'
5(9,6,21

35(3$5(' $33529('

3* 25 7, TEMPORARY INSTRUMENTS (PG,TG,etc)


7(0325$5<,167580(176 3*7*HWF

1653
&203/(;352-(&7
1*+,6215(),1(5<$1'3(752&+(0,&$/
1*+,6219,(71$0 /,0,7('/,$%,/,7<&203$1<

81,7  6<0%2/2*<

TEMPORARY HOSE OR PIPING


'5$:,1*7,7/(
'9

7(0325$5<+26(253,3,1* 3,3,1*$1',167580(17',$*5$0

&2175$&725-2%&2'( 25,*,1$7('%< -*&


&2175$&725':*1R 3&:%6
'9

TEMPORARY SPOOL
,668(385326( '2&&/$66
7(0325$5<6322/ =
(03/2<(5&2175$&71R 6,=( 6&$/(
$ 121(

R A (03/2<(5':*1R 6+((7 5(9


$

N D
I 10-SEP 5
- 2 0 1
2) $
Attachment : S-000-1730-0815M_0_0030 System No. : 041-SVW-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. 15 16 2 of 7
: 041-SVW-01-SV-1 Page

BL
NOTE 2 A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
TPM SK
041 COMMON 041 041 041 041 041 0014V AND D-000-1225-0020V TO 0026V.
AA FAULT PI FI 041
PT PG FT
FE ICPA-041-UI-011
FRESH COOLING 0351 0351 0351 0352 0351 0351 FRESH COOLING
0351 MIN
A WATER SUPPLY
16"-CWS-041-3001-A2AW-NI 16"-CWS-141-3026-A2AW-NI
WATER SUPPLY
1. DELETED. A
041-3002M 141-3012S
2. ORIFICE WITH 276.7 MM HOLE.
TO UNIT 041 041 H 041 NOTE 9 FROM INTERCONNECTING
AI AT 1'' 3. ORIFICE WITH 182.1 MM HOLE.
0351 041 041
0351 NPIC-041-E-0109M PG TG
TP HC ICPA-041-UO-001 4. ORIFICE WITH 248.5 MM HOLE.
FRESH COOLING M5 NPIC-041-E-0105M 0359 0357 FRESH COOLING
0.75" - 150# MIN NPIC-041-E-0105M
WATER RETURN NPIC-041-E-0161M WATER RETURN 5. ORIFICE WITH 26.46 MM HOLE. NPIC-041-E-0162M
16"-CWR-041-3001-A2AW-NI RF NOTE 6 16"-CWR-141-3026-A2AW-NI
041-3002M 141-3012S
6. PROBE NOZZLE SIZE SHALL BE 2", HEIGHT SHALL BE 200MM.
FROM UNIT 041 0.75"-WO-041-0007-A2AW-NI TO INTERCONNECTING
NPIC-041-E-0106M NOTE 7 NPIC-041-E-0106M 1'' 7. FLOW TRANSMITTER 041-FT-0352A TO MEASURE LP STEAM TO
B NPIC-041-E-0161M 041
FI
041
NOTE 3
ICPA-041-UI-015 INTERCONNECTING. FLOW TRANSMITTER 041-FT-0352B TO B
041 041 041 041 041 FT MEASURE LP STEAM FROM INTERCONNECTING.
PI TI 0352A 0352A 041 ICPA-041-UI-005 NPIC-041-E-0106M
PT PG TT 041
WO 0353 0353 0354 0351 0351 FI
041 FE
NPIC-041-E-0113M 1" 8. MULTITAP ORIFICE FLANGES (041-OR-0352 , 041-ORJ-0352), ORIFICE
FT 0352
LP STEAM 0352B 0352B LP STEAM FLANGE WITH JACK SCREW (041-ORJ-0352) SHALL BE LOCATED AT
10"-LPS-041-3001-A1AS-HS NOTE 8 10"-LPS-141-3006-A1AS-HS
041-3103M 141-3002S DOWNSTREAM OF ORIFICE PLATE

FROM / TO UNIT 041 MIN FROM / TO INTERCONNECTING 9. FOR DETAILS, REFER TO VENDOR DWG. VM2175-101-A-052
0.75" 0.75" 0.75"
NOTE 4 NPIC-041-E-0113M
041 041 041 041 041 041 041 MIN
TT TI FI FT 041 PG PT PI ICPA-041-UI-014
C 0353 0353 0353 0353 FE
0353
0356 0355 0355 1.5"
ICPA-041-UI-004 C
MP STEAM MP STEAM PERMANENT LINE
14"-MPS-041-3001-B1AS-HS 14"-MPS-141-3002-B1AS-HS
041-3103M 141-3002S SUBJECT TO
TO UNIT 041 Control system pressure at operation MIN FROM INTERCONNECTING
SERVICE TEST
1'' A supply
1'' from Service 1''water Interconnecting
pressure of Service water = 0.32 MPa(g)
041 MIN
Header. Permanent Supply required TEST POINT
PG ICPA-041-UI-002
0360
DB MIN
HP BOILER FEED WATER HP BOILER FEED WATER
3"-HBFW-041-3001-M2AS-HS 3"-HBFW-141-3002-M2AS-HS
041-3201M 141-3012S
D TO UNIT 041 MIN FROM INTERCONNECTING
D
0.75" 0.75" 0.75" 0.75"
041 MIN
PG
041-SVW-01 0361 041-SVW-01 041-SVW-01
ICPA-041-UI-006
MIN
SERVICE WATER SERVICE WATER
3"-SVW-041-3001-A2AW-NI 3"-SVW-141-3005-A2AW-NI
041-3301M 141-3012S

TO UNIT 041 MIN FROM INTERCONNECTING


0.75" 0.75" 0.75"
0.75"
041
E PG
0362
MIN
ICPA-041-UI-007 E
MIN
DRINKING WATER DRINKING WATER
3"-DKW-041-3001-A0LW-HC 3"-DKW-141-3005-A0LW-HC A. DELETED.
041-3301M 141-3012S
NPIC-041-E-0162M 1. DELETED.
TO UNIT 041 0.75"-FG-041-3010-A1AD-NI MIN FROM INTERCONNECTING
0.75" 0.75" 0.75" 0.75" 2. DELETED.
MIN
LPN 0.75"-LPN-041-3007-A1AA-NI
041-3603M NPIC-041-E-0162M
F 0.75" 0.75" F
NPIC-041-E-0126M NPIC-041-E-0126M
NPIC-041-E-0162M
LPS 0.75"-LPS-041-3006-A1AS-HS E
041 041 E 041
041 041 041 E 041
041-3103M TI FI PI
TT FT PG PT
0.75" 0.75" 0358 0358 0355 0355 0364 E
0363 E 0363
E
ICPA-041-UI-001
0.75"-FG-041-3003-A1AD-HC 15D MIN MIN
REFINERY FUEL GAS 5D MIN E REFINERY FUEL GAS
2"-FG-041-3001-A1AD-STL 2"-FG-141-3017-A1AD-STL
041-3401M 141-3012S
6" FEED DWG.No.
G TO UNIT 041 0.5"
0.75" 0.75" 0.75"
FROM INTERCONNECTING G
041 MIN MIN
PG NPIC-041-E-0151M
ICPA-041-UO-003
0365
MIN
FLARE GAS 1:500 1:500 FLARE GAS DWG.No. Title
30"-FLG-041-3001-A1GP-NI 30"-FLG-141-3002-A2GQ-NI REFERENCE DRAWINGS
041-3503M 141-3002S
2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS
FROM UNIT 041 2" LO TO INTERCONNECTING
NPIC-041-E-0153M 1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS
0.75"
0 11/APR/14 FOR CONSTRUCTION TTH RKM JMD
B 11/NOV/13 FOR APPROVAL DMO RKM SMA
LPS 0.75"-LPS-041-3079-A1AS-HS 0.75"-FLG-041-3005-A1GP-HC
H 041-3103M
A 15/JUL/13 FOR REVIEW DMO RKM SMA H
041 Rev Date Description Prep'd Chk'd App'd
0.75" 0.75" PG ICPA-041-UI-008 REVISIONS
0366 WO
MIN Operation Centre JOB Code:
PLANT AIR PLANT AIR Operation Centre DWG.No.:
2"-PA-041-3001-A2AA-NI 2"-PA-141-3004-A2AA-NI
041-3603M 141-3012S Contractor JOB Code Responsible Company
TO UNIT 041 MIN FROM INTERCONNECTING 0-6495-20 TPM
0.75" 0.75" 0.75" 0.75" Prepared by Checked by Approved by
041 T. T. HUONG T. NGUYEN T. N. SON
PG MIN
NPIC-041-E-0117M 0367 ICPA-041-UI-009
I INSTRUMENT AIR
2"-IA-041-3001-S0RA-NI 2"-IA-141-3004-A1AA-NI
INSTRUMENT AIR I
041-3603M 141-3012S

TO UNIT 041 LO FROM INTERCONNECTING


NPIC-041-E-0151M NSRP
Complex Project
041 041 041 Nghi Son Refinery and Petrochemical
041 041 041 041
TT TI FI FT PG PI PT Nghi Son, Vietnam Limited Liability Company
0355 0354 0357 MIN ICPA-041-UI-010
0355 0354 0358 0357
5D MIN 15D MIN
LP NITROGEN LP NITROGEN Drawing Title
2"-LPN-041-3001-A1AA-NI 2"-LPN-141-3003-A1AA-NI
041-3603M 141-3012S
J TO UNIT 041
6"
1" FROM INTERCONNECTING
PIPING AND INSTRUMENT DIAGRAM J
0.75" PENEX
UNIT 041
UTILITY BATTERY LIMIT - 1
NOTE 5
041 041 041 041 041 041 041
TI FI 041 PI
TT FT PG PT ICPA-041-UI-012
0359 0356 FE 0369 MIN Issue Purpose Document Class
0359 0356 0370 0369
0356
HP NITROGEN HP NITROGEN FOR CONSTRUCTION Z
2"-HPN-041-3001-D1AA-NI 2"-HPN-141-3013-D1AA-NI
K 041-3603M 141-3012S Unit No. Unit Abbreviation PCWBS Size Scale K
6"
TO UNIT 041 FROM INTERCONNECTING 041 PENX A900 A1 NONE
0.75"

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-1301M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13 14
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
15 16
Attachment : S-000-1730-0815M_0_0030 System No. : 041-SVW-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. 15 16 3 of 7
: 041-SVW-01-SV-1 Page
041-SVW-01 041-SVW-01

DEMINERALISED WATER

DEMINERALISED WATER

DEMINERALISED WATER

DEMINERALISED WATER

DEMINERALISED WATER
TO SAMPLE COOLER
A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
0014V AND D-000-1225-0020V TO 0026V.

SERVICE WATER
N

041-0015M

SERVICE WATER

TO 041-P-203A/B
041-0024M

041-0024M

041-0022M

041-0022M

041-0022M

041-0022M
(041-R-101A/B)

TO 041-P-203A

TO 041-P-203B
1. DELETED.

TO 041-P-212

TO 041-P-212

TO 041-E-204
A A
041 041 2. TIE-IN FOR FUTURE CONNECTION.
ZAH ZAH

NPIC-041-E-0158M

NPIC-041-E-0158M
9001 9002

AT GRADE
AT GRADE

AT GRADE

AT GRADE

AT GRADE

AT GRADE

AT GRADE

AT GRADE
US-001

US-004

US-005

US-009

US-012

US-013

US-024

US-023
PERMANENT LINE
041 041 SUBJECT TO
UZ UZ SERVICE TEST
HC 9801 HC HC HC 9801 HC HC HC HC
FGS FGS

B (V) (V) NPIC-041-E-0153M


TEST POINT B
041
0.75" 041
ZSH ZSH

0.75"-SVW-041-0004-A2AW-NI
SVW 041 0004 A2AW NI
0.75"-DMW-041-0001-A0JP-NI

0.75"-DMW-041-0004-A0JP-NI

0.75"-DMW-041-0005-A0JP-NI
9001A 9002A

1"-DMW-041-0002-A0JP-NI

1"-DMW-041-0003-A0JP-NI
041 041
ZSH ZSH

0.75"-SVW-041-3018-A2AW-NI
9001B 9002B

C C

0.75
2"-150# SAFETY SHOWER 2"-150# SAFETY SHOWER

NPIC-041-E-0129M
RF AND RF AND
0.75" EYE SHOWER EYE SHOWER
MIN

MIN

0.75"

MIN
MIN

MIN

MIN

MIN
D MIN D

2"-SVW-041-0005-A2AW-NI
0.75"
MIN

NPIC-041-E-0129M
0.75"-SVW-041-3010-A2AW-NI
SVW 041 3010 A2AW NI
MIN

0.75"-SVW-041-3017-A2AW-NI
0.75"-SVW-041-3005-A2AW-NI

0.75"-SVW-041-3012-A2AW-NI

0.75"-SVW-041-3014-A2AW-NI

0.75"-SVW-041-3016-A2AW-NI
11''-SVW-041-3008-A2AW-NI
SVW 041 3008 A2AW NI
2"-DKW-041-3005-A0LW-HC

2"-DKW-041-3002-A0LW-HC
2"-DMW-041-3003-A0JP-NI

2"-DMW-041-3002-A0JP-NI

22''-SVW-041-3023-A2AW-NI
SVW 041 3023 A2AW NI
NPIC-041-E-0129M
NPIC-041-E-0129M

E E

NPIC-041-E-0153M
A. DELETED.

0.75
1. DELETED.
MIN
2. DELETED.
MIN
3. DELETED.
MIN

2" 041-SVW-01 4. DELETED.

MIN

MIN
MIN

SERVICE WATER
F 33"-SVW-041-3001-A2AW-NI
SVW 041 3001 A2AW NI
041-1301M
F
FROM BL
MIN

0.75"
MIN

MIN

MIN
MIN NOTE 2
3"
2"
MIN
DEMINRALISED WATER
2"-DMW-041-3001-A0JP-NI
041-1302M

FROM BL FEED DWG.No.


G 0.75"
NPIC-041-E-0129M
G

DRINKING WATER
3"-DKW-041-3001-A0LW-HC
041-1301M DWG.No. Title
MIN FROM BL REFERENCE DRAWINGS
0.75" 2 08/JUN/15 FOR CONSTRUCTION TTH TN TNS

NPIC-041-E-0129M
NPIC-041-E-0153M
MIN 1 28/NOV/14 FOR CONSTRUCTION TTH DM TNS
0 11/APR/14 FOR CONSTRUCTION TTH RKM JMD
B 11/NOV/13 FOR APPROVAL DMO RKM SMA
0.75"-SVW-041-3011-A2AW-NI
SVW 041 3011 A2AW NI
0.75"-SVW-041-3022-A2AW-NI
SVW 041 3022 A2AW NI

0.75"-SVW-041-3013-A2AW-NI
SVW 041 3013 A2AW NI

0.75"-SVW-041-3015-A2AW-NI
SVW 041 3015 A2AW NI

0.75"-SVW-041-3021-A2AW-NI
H A 15/JUL/13 FOR REVIEW DMO RKM SMA H
22"-SVW-041-3006-A2AW-NI
SVW 041 3006 A2AW NI

Rev Date Description Prep'd Chk'd App'd


REVISIONS
Operation Centre JOB Code:
Operation Centre DWG.No.:
Contractor JOB Code Responsible Company
MIN 0-6495-20 TPM
Prepared by Checked by Approved by

NPIC-041-E-0129M
T. T. HUONG T. NGUYEN T. N. SON
0.75
0.75

0.75

0.75

22"-SVW-041-0007-A2AW-NI
SVW 041 0007 A2AW NI

22"-SVW-041-0006-A2AW-NI
SVW 041 0006 A2AW NI
I I
NPIC-041-E-0129M

0.75"-SVW-041-3020-A2AW-NI
NSRP
Complex Project
Nghi Son Refinery and Petrochemical
0.75"
Nghi Son, Vietnam Limited Liability Company

Drawing Title
HC HC HC HC HC HC

HC
J PIPING AND INSTRUMENT DIAGRAM J

AT GRADE
AT GRADE

AT GRADE

AT GRADE

AT GRADE

AT GRADE

AT GRADE

US-038
US-026

US-027

US-031

US-035

US-036

US-037
PENEX
UNIT 041
SERVICE, DEMIN. AND POTABLE WATER

SERVICE WATER

SERVICE WATER
041-0102M

041-0101M
TO 041-V-615

TO 041-V-612
Issue Purpose Document Class
FOR CONSTRUCTION Z
K Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE
041-SVW-01

DR01A
041-SVW-01 Contractor DWG.No. Sheet Rev.
A1

D-041-1225-3301M 001 OF 001 2

IN
10-SE
5
P-21 2 3 4 5 6 7
8 9
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
10 11 12 13 14 15 16
Attachment : S-000-1730-0815M_0_0030 System No. : 041-SVW-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. 15 16 4 of 7
: 041-SVW-01-SV-1 Page
LEAD REACTOR EFFLUENT
8"-P-041-0084-B1AH04-HC 041
041-0014M A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
TWO PHASE FLOW PSV 041-R-101A
0151 0014V AND D-000-1225-0020V TO 0026V.
FROM 041-E-102A/B (V) 041
0.75"-IA-041-0001-S0RA-NI UZ SIZE: 3J4 1. TO BE DISCONNECTED AND BLANK-OFF WHEN NOT IN USE.
STRIPPING HYDROGEN AIR RESERVOIR 041 041 PSET: 3.90 MPa(g)
REACTOR
A 4"-P-041-0048-B1AH04-HC
1000
UZ UZ
041 FREE DRAINING 8"-FLG-041-0025-A1AP-NI FLG CODE ASME VIII DIV 1
2.
3.
CATALYST WITHDRAWAL NOZZLE.
FOR PURGE AND PRESSURING.
A
041-0006M 0102 0101
NOTE 4 PSV
IA 0103 041-3501M SIZE: I.D x TT 2500 mm x 12200 mm 4. FOR SULFUR STRIPPING.
FROM 041-H-011
041 3.90 MPa(g) + FV @ 205 °C 5. BLANKETING GAS.
DESIGN PRESSURE

NPIC-041-E-0153M
041-3601M
PG

MIN
INST. PIP. 6. LOW RANGE GAUGE USED FOR REACTOR BLANKETING DURING
0113 DESIGN TEMPERATURE 260 °C
(V) 041 041 CRI T LOADING ONLY.
041 041
PI PT
UZ HZA 0.75" 0.75" INSULATION TYPE HC 7. LINE FOR DRY-OUT.

MIN
0109 0109 0103 0101 NP P-041-0288-D1AH04-HC
L 041 041 8. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
1" NC

FREE DRAINING
ULL ULH TRIM SPECIFICATION
S P-041-0331-B1AH04-HC D-041-1225-2401M.
0101 0101
2" NOTE 14
9. 6" x 650 MM PIPING PIECE SAMPLE RECEIVER WITH PIPE SUPPORT
041 041 041 NC 4"-P-041-0165-B1AH04-HC NPIC-041-E-0152M
B 041 S FOR POSSIBLE VIBRATION.
B

MIN
UA HZS UA
041 041 UZY 10. FOR PRESSURE TEST.
0101A 0101 0101B

NOTE 5
USL USH 0101A 041 041
0101 0101 UZY UZV CIRCUIT EMERGENCY CIRCUIT 11. COMMON SWING ELBOW FOR LPN AND HPN. TEMPORARY PRESSURE
0101B 0101
TROUBLE SHUTDOWN TROUBLE PROTECTION (PSV) TO BE INSTALLED BEFORE CONNECTING
COMBINED FEED COIL 1 COIL 2
8"-P-041-0085-B1AH04-HC 8"-P-041-0259-B1AH04-HC SWING ELBOW TO HPN. NPIC-041-E-0115M
041-0014M 12. TO BE USED DURING DRY-OUT OPERATION ONLY.
TWO PHASE FLOW 041
FROM 041-E-103 FI FC 13. A NITROGEN UTILITY STATION TO BE LOCATED CLOSE TO
0055 TSO 041 REACTORS.
HIC
8"

MIN
14. ALTERNATE DESIGN CONDITIONS DURING HOT HYDROGEN STRIPPING:
NC NOTE 18 0055
1.5"-P-041-0164-B1AH04-NI - PRESSURE: 2.70 MPa(g)
C 0.75"
041
FT
041
FE
NOTE 3 041
- TEMPERATURE: 315 °C C
0055 0055 HV 15. DEPRESSURING SYSTEM SHUTDOWNS BY-PASS SWITCH WITH LIGHT
NP 0.75" 0055
HYDROGEN PURGE FREE DRAINING FOR TESTING DEPRESSURING SYSTEM WHILE BY-PASSING
2"-P-041-0079-B1AH04-NI ASSOCIATED SHUTDOWNS.
041-0013M 041
NOTE 5

VENDOR CONTRACTOR LO FL(O) 2" LO 041 UZ


FROM 041-DR-051A/B 041 NOTE 6 041 HZS 0101
PG PG 0.75" 1" 0.75"
NOTE 17 2" MIN 0108

NPIC-041-E-0158M
0102 0118
1" NC FREE DRAINING 1.5" 041 041
LPN MW UZ HZL CRIT
041-3601M 30" 0102 0108A

FREE DRAINING
MIN

1.5"-LPN-041-0003-A1AA-NI 041
D STRIPPING HYDROGEN
4"-P-041-0047-B1AH04-HC NPIC-041-E-0115M
0.75" 0.75"
UZ D

MIN
041-0006M NOTE 16 1.5" 1.5"
041-R-101A 0103
NOTE 4 0.75" 0.75"
TO 041-H-011 IN VIEW 041 NOTE 13
1.5"-HPN-041-0002-D1AA-NI PG
NOTE 19 16. FOR START-UP.
0074
17. VALVE AND BLIND FLANGE TO BE PROVIDED BY CONTRACTOR.
1.5" 041 8" 8"
NOTE 11 VAPOR
041
PI 18. ORIFICE WITH 20.32 MM HOLE.
HPN PT
0103 0103 19. CONNECTION FOR TEMPORARY PSV. SET POINT TO BE 3.9 MPa(g)
041-3601M LIQUID TRAY COMBINED FEED
NOTE 10 FREE DRAINING FREE DRAINING 8"-P-041-0167-B1AH04-HC
NOTE 1 H NPIC-041-E-0115M
0.75" 0.75" 041 041 041-0016M
TT TI
NC TWO PHASE FLOW
0105 0105 MIN TO 041-R-101B
0.75"-SVW-041-0004-A2AW-NI SVW
E 041-3301M 041 H
0.75" 0.75" E
041
041-SVW-01 TT TI A. DELETED.
NC 1.5"-P-041-0170-D1AH04-PC 0106 0106 8"-P-041-0160-B1AH04-HC
NPIC-041-E-0097M H TWO PHASE FLOW
041 041
1.5"-P-041-0306-B1AH04-PC TT TI PERMANENT LINE
0107 0107 SUBJECT TO
H SERVICE TEST
2"-WW-041-0001-A2AW-NI

041 041
NPIC-041-E-0158M TI
0.75"-P-041-0171-B1AH04-NI TT
0104 0104
H TEST POINT
FREE DRAINING

F 0.75"-FLG-041-0024-A1AP-NI FLG 041


TT
041
TI
041
PDY
041
PDI F
NO POCKET 041-3501M 0108 0108 0105 0105 L
041 H
041
TT TI
FREE DRAINING

0.75" 0109 0109


1" NC
041 UC H
041 041 041
SP PG TI
1221 0.75"-P-041-0169-B1AH04-NI TT
0115 0110 0110

041 H 041
2" 041
TI PI FEED DWG.No.
TT
G 0111 0111 0104 G

041 H
953053-120-18-A1 REACTORS
TI 0.75"
WO 041 0112
DWG.No. Title
CL OF GLASS
041 LG TL REFERENCE DRAWINGS
TG
NO POCKET 2"-FLG-041-0026-A1AP-NI FLG
0102 2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
150

0207 GL(R) 041-3501M


1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
041 041 0.75" 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD
NOTE 9 NOTE 2
0.75" TT PG 041 B 11/NOV/13 FOR APPROVAL DMO RKM SMA
6" 6"
H SIGNAL 0112 0116
H
2300 MIN

NPIC-041-E-0115M PT A 13/JUL/13 FOR REVIEW DMO RKM SMA


041-0008M NOTE 2 LPT 0104 Rev Date Description Prep'd Chk'd App'd
PIP. LAG REACTOR EFFLUENT
8"-P-041-0166-B1AH04-HC REVISIONS
TO 041-AY-0001 0.75" INST. INST. 041-0016M
NOTE 8 Operation Centre JOB Code:
041 NOTE 12 PIP. NC CIRCUIT Operation Centre DWG.No.:
FLG 041 NOTE 1 TROUBLE FROM 041-R-101B
SC AT 8"-P-041-0161-B1AH04-HC 0.75"
0.75" 0.75" 8" 8" CRIT Contractor JOB Code Responsible Company
041-3501M 0004 0001D 0.75" NPT 041 041 041 041
NPT MOIS UZ UZ HZA UA 0-6495-20 TPM
TYPE L2
NOTE 1 0103 0101 0110 0102 Prepared by Checked by Approved by
NPIC-041-E-0105M
0.75" 0.75" 300 # 300 # SAMPLE RETURN T. T. HUONG T. NGUYEN T. N. SON
NOTE 15
NOTE 1 NOTE 1 041 0.75"-P-041-0089-B1AH04-NI
041 041-0017M
PSV
I 3"
0.75"-IA-041-0002-S0RA-NI
0152 UZ 041
HZS
NNF
TO 041-E-201A/B
I
3"-CBD-041-0026-A2AP-NI

(V) 0102
0.75"-P-041-0087-B1AH04-PG 0.75" 041
AIR RESERVOIR UA 0110
0.75"-LPN-041-0014-A1AA-NI EMERGENCY
HYDROCARBON SAMPLE MIN
0103 041
DEPRESSURIZING NSRP
FREE DRAINING

PIP. INST. CIRCUIT UZY


0.75"-P-041-0077-B1AH04-PG 0103
041-0013M LPN TROUBLE S Complex Project
IA Nghi Son Refinery and Petrochemical
TWO PHASE FLOW NC WO 041-3601M
MIN

FROM 041-E-101 NOTE 7 041-3601M Nghi Son, Vietnam Limited Liability Company
0.75" 0.75"
0.75"-LPS-041-0022-A1AS-HS 041 041 Drawing Title
NC PG UZY
0102
0117 S
J 0.75" LPS
041
(V)
PIPING AND INSTRUMENT DIAGRAM J
NP CBD 041-3101M PT
041-3701M 0.75" 0.75" 0110
H H
PENEX
NC 0.75"-P-041-0260-B1AH04-HC 041 041 041 041
MIN

ULL ULH ULH ULL REACTOR SECTION


LEAD REACTOR EFFLUENT 0102 0102 0103 0103
8"-P-041-0082-B1AH04-HC L L
041-0014M 041 REACTORS - 1
TWO PHASE FLOW PI
TO 041-E-102A/B 0110 L 041 041 041 041 041 041
START-UP PURGE USL USH UZV UZV USH USL 3"-FLG-041-0023-A1AP-NI
2"-P-041-0083-A1AP04-NI 0102 0103 Issue Purpose Document Class
0102 0102 0103 0103
041-0013M
FOR CONSTRUCTION Z
K TO 041-EJ-611
3"-P-041-0168-B1AH04-HC FREE DRAINING FLG
Unit No. Unit Abbreviation PCWBS Size Scale K
LAG REACTOR EFFLUENT
8"-P-041-0078-B1AH04-HC TWO PHASE FLOW 041-3501M
041 PENX A900 A1 NONE
LO LO

DR01A
041-0013M FC FC Contractor DWG.No. Sheet Rev.

0.75"
TWO PHASE FLOW TSO TSO
A1

TO 041-E-101 3" 3" D-041-1225-0015M 001 OF 001 2

IN
10-SE
P-2
5 1 2 3 4 5 6 7
8 9
10 11 12 13
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
14 15 16
Attachment : S-000-1730-0815M_0_0030 System No. : 041-SVW-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. 15 16 5 of 7
: 041-SVW-01-SV-1 Page

SIZE: 1E2
PSET: 1.45 MPa(g) 041-P-203A/B 041-E-204 A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
041 CAUSTIC CIRCULATION PUMPS CAUSTIC HEATER 0014V AND D-000-1225-0020V TO 0026V.
PSV
0203 CODE ASME VIII DIV 1 / API 660
A CODE API 610
TYPE: MULTITUBE
1. FOR PUMP AUXILIARY DETAILS, REFER TO DWG. D-041-1225-2202M. A
PUMP TYPE / NO. OF STAGE CENTRIFUGAL / 1 2. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
041 SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA) 203 mm/ 2745 mm/ 8.98 m²
3"-P-041-0196-A2AN04-NI FI RATED CAPACITY / NPSHR 17 m 3/hr/ 2 m D-041-1225-2401M.
0205 31.6 m / 1.40 MPa(g) DESIGN DUTY 495 kW
L DIFF. HEAD / SHUT-OFF PRESSURE 3. RESTRICTION ORIFICE WITH 27 MM HOLE.
1.13 SIDE SHELL TUBE
041 SPECIFIC GRAVITY @ PUMPING TEMP
FI DESIGN PRESSURE 0.81 MPa(g) + FV @ 120°C 1.45 MPa(g) + FV @ 100°C 4. WASH WATER CONNECTION TO PREVENT FeS FIRE DURING
0205L MOTOR SIZE 7.5 kW
TURNAROUND.

FREE DRAINING
NI DESIGN TEMPERATURE 265°C 100°C
INSULATION TYPE
INSULATION TYPE HS NI 5. EQUIPMENT AND PIPING IN CAUSTIC SERVICE SHALL BE FLUSHED

2"-P-041-0195-A2AN04-NI
TRIM SPECIFICATION B2AN04-NI
TRIM SPECIFICATION A2AS-HS A2AN04-NI WITH WATER PRIOR TO STEAM-OUT.

B NOTE 6 6. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE B


IN VIEW 0.34 MPa(g) @ 175 °C AND FV @ 175 °C.

FREE DRAINING
7. HOT CONDENSATE TO BE COOLED USING SERVICE WATER
NOTE 3 BEFORE DISCHARGE TO COC.
NOTE 12 041
RO 8. LOCATION TO BE ABLE FOR FLEXIBLE HOSE CONNECTION WITH
041 0202 NEARBY UTILITY STATION.
FT
RECIRCULATING 041 0205
FE 6" 3"-LPS-041-0009-A1AS-HS LPS 9. INLET AND OUTLET PIPING TO BE SYMMETRICAL.
CAUSTIC 0205
3"-P-041-0186-A2AN04-NI 041-3101M
041-0021M 0.75" 10. FULL OPENING OF GLOBE VALVE MAY FLOOD THE FLOOR. GLOBE
C TO 041-C-202
VALVE TO BE ADJUSTED TO ACHIEVE SUFFICIENTLY COOL C
NPIC-041-E-0153M TEMPERATURE AT 041-TG-0219 (40°C RECOMMENDED).
NPIC-041-E-0153M NPIC-041-E-0153M
3" 0.75" 041 11. ORIFICE WITH 18.23 MM HOLE.
FI
2"
041 H 0.75"-LPCW-041-0026-A2AS-PG LPCW
12. ORIFICE WITH 40.45 MM HOLE.
0204 TI NPIC-041-E-0158M ST
L TWO PHASE FLOW
041 0209 041-E-204 NOTE 9
041-3101M
2.5" L 13. SELF-VENTING PUMP CASING. NPIC-041-E-0158M
FI NOTE 5 0.75"-LPS-041-0035-A1AS-HS
HC
0204L 0.75'' 041
IN VIEW 041 NPIC-041-E-0158M 041 8" 8" TG
BY VENDOR NOTE 11
FT TT 0214 PERMANENT LINE
RECIRCULATING NOTE 4, 8 0204 041 0209 3"-300#
0.75"
D CAUSTIC
2"-P-041-0187-A2AN04-NI
FE
0204 3" RS RS
SUBJECT TO D
041-0021M SERVICE TEST
TO 041-C-202 6" 6"
3"-300# 0.75"
TEST POINT
6" 6"
041-SVW-01 NOTE 9
FLG 6"-LPCW-041-0010-A2AS-PG
SVW 22"-SVW-041-0005-A2AW-NI
SVW 041 0005 A2AW NI
041-3502M
041-3301M
E 041 E

MIN
0.75" 0.75" TG
0219 A. DELETED.
IN VIEW 1. DELETED.
NOTE 2 NOTE 10
041 2. DELETED.
SC
0012
WO 3. DELETED.
TYPE L3
TO COC
(BY CIVIL)
NOTE 7
F 3"-P-041-0194-A2AN04-NI F

RECIRCULATING
CAUSTIC
4"-P-041-0188-A2AN04-NI
041-0021M
3"-P-041-0193-A2AN04-NI
FROM 041-C-202
DMW
041-3301M
NPIC-041-E-0123M
0.75" 0.75" 1"-DMW-041-0003-A0JP-NI FEED DWG.No.
G G
MIN

0.75"-LPN-041- 0.75" 0.75"


0016-A1AA-NI
MIN

MIN
LPN
953053-120-22-A1 CAUSTIC CIRCULATION AND WATER INJECTION
041-3601M DWG.No. Title
MIN

0.75" 0.75"
4"-P-041-0191-A2AN04-NI

REFERENCE DRAWINGS

4"-P-041-0192-A2AN04-NI
0.75"-LPS-041-
2 13/MAY/15 FOR CONSTRUCTION TTH TN TNS
0024-A1AS-HS
1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS

MIN
MIN

LPS 0 28/MAR/14 FOR CONSTRUCTION TTH DM JMD


0.75"
MIN

DMW 041-3101M B 11/NOV/13 FOR APPROVAL DMO RKM SMA


MIN

H 041-3301M 0.75" HC 0.75" DMW 0.75"-CCB-041-0023-A2AN04-NI FREE DRAINING CCB


A 13/JUL/13 FOR REVIEW DMO RKM SMA H
Rev Date Description Prep'd Chk'd App'd
0.75" 0.75" 0.75" 041-3301M 041-3701M REVISIONS
0.75" 041
041 PG
PG 0.75" 0.75" 0.75" 0.75" Operation Centre JOB Code:
0.75"-DMW-041-0004-A0JP-NI 0215

NPIC-041-E-0158M
0214 Operation Centre DWG.No.:
NPIC-041-E-0158M

041-P-203A 0.75"-DMW-041-0005-A0JP-NI
041-P-203B Contractor JOB Code Responsible Company
041 NOTE 1, 13 NOTE 1, 13 0-6495-20 TPM
NPIC-041-E-0158M

NPIC-041-E-0158M

STR 041
STR Prepared by Checked by Approved by
1071 2"-300# 2"-300# 0.75"-CBD-041-0032-A2AP-NI FREE DRAINING CBD
1072 T. T. HUONG T. NGUYEN T. N. SON
041 RF RF 041-3701M
PG 041
PG
I 0229
0230 I
M M-2 M M-2
3"-300# A, B, C, E 3"-300# A, B, C, E
RF RF NSRP
041 041 041 041 Complex Project
(V) MGL (V) MGL Nghi Son Refinery and Petrochemical
UZ UZ
NPIC-041-E-0158M NPIC-041-E-0158M
0203A 1000 0204A 1000 Nghi Son, Vietnam Limited Liability Company
0.75"-300# RUN 0.75"-300# RUN
RF 0.75" RF 0.75" WO Drawing Title

0.75"-P-041-0197-A2AN04-NI 0.75"-P-041-0198-A2AN04-NI
J PIPING AND INSTRUMENT DIAGRAM J
NPIC-041-E-0122M
NPIC-041-E-0098M
PENEX
STABILIZER AND SCRUBBER SECTION
WO WO
CAUSTIC CIRCULATION
FREE DRAINING

FREE DRAINING

0.75"-CCB-041-0001-A2AN04-NI 0.75"-CCB-041-0002-A2AN04-NI Issue Purpose Document Class


FOR CONSTRUCTION Z
K Unit No. Unit Abbreviation PCWBS Size Scale K
041 PENX A900 A1 NONE
CCB CCB

DR01A
Contractor DWG.No. Sheet Rev.
A1

041-3701M 041-3701M
D-041-1225-0022M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12 13
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
14 15 16
Attachment : S-000-1730-0815M_0_0030 System No. : 041-SVW-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. 15 16 6 of 7
: 041-SVW-01-SV-1 Page

SIZE: 2J3
PSET: 1.34 MPa(g) 6"-FLG-041-0067-A1AP-NI FREE DRAINING FLG
041-V-612 NOTE 12 041-P-612 041
A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO
041-3503M
PSV 0014V AND D-000-1225-0020V TO 0026V.
CLOSED BLOWDOWN DRUM CLOSED BLOWDOWN DRUM PUMP 0624 SIZE: 0.75D1
A CODE ASME VIII DIV 1 CODE API 610
PSET: 1.00MPa(g) 1. VALVE TO BE LOCATED IN PIT. EXTENDED STEM FOR VALVE A

4"-P-041-0321-A2AP-PG
FREE DRAINING
041 OPERATION TO BE PROVIDED AT GRADE LEVEL.
SIZE: I.D x TT 2000 mm x 6000 mm PUMP TYPE/NO. OF STAGES CENTRIFUGAL VERTICAL / 1 0.75" TSV

MIN
0623 2. LI TO BE READABLE FROM PUMP LOCAL START / STOP BUTTONS

1"-V-041-0018-A1AP-NI
DESIGN PRESSURE 0.34 MPa(g)+FV@175°C RATED CAPACITY/NPSHr 33 m3/hr/ 2.9m

FREE DRAINING
85.6 m/ 1.32 MPa(g) 3. DELETED.
DESIGN TEMPERATURE 175 °C DIFF.HEAD/SHUT-OFF PRESSURE
2"
INSULATION TYPE NI SPECIFIC GRAVITY @ PUMPING TEMP. 0.6 - 1.0 NPIC-041-E-0158M 4. RESTRICTION ORIFICE WITH 2.2 MM HOLE.
TRIM SPECIFICATION P-041-0318-A2AP-NI MOTOR SIZE 37 kW 5. RESTRICTION ORIFICE WITH 14.81 MM HOLE.

FREE DRAINING
INSULATION TYPE PG 1"
6. LINE REQUIRED TO ENSURE ADEQUATE COOLING OF DRUM LIQUID.
041-EJ-612 TRIM SPECIFICATION A2AP - PG
B EJECTOR
7. 000P-612A IS PROVIDED AS A WAREHOUSE COMMON SPARE FOR B
040-P-612 AND 041-P-612.
AT GRADE
CODE ASME VIII DIV 1 TO SAFE LOCATION 8. PIT COVERED BY GALVANIZED METAL GRATING.
041
CAPACITY 4.1 m3/hr LPS 0.75"-LPS-041-0031-A1AS-HS 0.75"-P-041-0270-A2AP-HC 8"-300# TG
9. 40 x 5MM HOLES TO BE PROVIDED ON THE BOTTOM OF PIPE FOR
DESIGN PRESSURE 0.7 MPa(g)+FV@265°C 041-3103M 041-E-613 0624 0.75"
AIR PURGE.
0.75" 0.75" RS NOTE 14 CWR
DESIGN TEMPERATURE 265°C 6"-CWR-041-0010-A2AW-NI
LPT 10. FOR PUMP AUXILIARY DETAILS, REFER TO DWG. D-041-1225-2203M.
INSULATION TYPE PG 041-3002M
RS NOTE 14 0.75"
TRIM SPECIFICATION A2AP - PG 6"-CWS-041-0011-A2AW-NI CWS 11. DELETED.
041-3002M 12. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE
C 041-E-612
4" 8"-300# 0.75" 0.34 MPa(g) @ 175 °C AND FV @ 175 °C. C
6" 13. PORTABLE PUMP WILL BE CONNECTED TO THE VALVE FOR
041 041 H 041
CBD FLASH GAS COOLER RO NOTE 5
TI TT DRAIN-OUT OF ACCUMULATED LIQUID AT BOOT.
0622 0623 0623
CODE ASME VIII DIV 1 / API 660 0.75" 14. VALVE TO BE KEPT OPEN DURING NORMAL OPERATION TO
TYPE: BEU 2" PREVENT OVER PRESSURE DUE TO EXTERNAL FIRE AT THE
SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA) 1250 mm / 3658 mm / 180 m² 4"-P-041-0319-A2AP-NI COOLER.

DESIGN DUTY NPIC-041-E-0158M 14610 kW 15. ORIFICE WITH 57 MM HOLE.


0.75" 041
SIDE SHELL TUBE TO ATM FA 16. NOZZLE LENGTH SHALL BE 150MM.

4"-P-041-0246-A2AP-PG
AT SAFE LOCATION 1173
D 0.77 MPa(g) NPIC-041-E-0146M
D

MIN
DESIGN PRESSURE 1.00 MPa(g)
NOTE 12 SIZE : 0.75D1
DESIGN TEMPERATURE 175°C 76°C 041 PSET: 1.00 MPa(g) NPIC-041-E-0158M
TSV 0.75" 4''-V-041-0008-A1AP-NI PERMANENT LINE
INSULATION TYPE PG NI 1"-V-041-0019-A1AP-NI 0622 SUBJECT TO
TRIM SPECIFICATION A2AP-PG A2AW - NI

FREE DRAINING
SERVICE TEST

2"-P-041-0243-A2AP-NI
0.75" HPT
041-E-613

FREE DRAINING
FREE DRAINING TEST POINT

NOTE 6
FREE DRAINING 4"-P-041-0245-A2AP-PG FLG
CBD SLOP COOLER 041-3503M
E CODE ASME VIII DIV 1 / API 660 1"
LO
0.75"
LO E
NPIC-041-E-0129M 4"-FLG-041-0057-A1AP-PG

NPIC-041-E-0120M
TYPE: MULTITUBE NPIC-041-E-0158M AT GRADE A. DELETED.
TO SAFE LOCATION 041 18"
SIZE: (DIAMETER/TUBE LENGTH/H.T. AREA) 388 mm / 4880 mm / 101 m² TG B. DELETED.
DESIGN DUTY 2245 kW 8" 0.75" 0622 041
US
SIDE SHELL TUBE CWR RS
0621
1.34 MPa(g) 041-3002M LPT 041 O
DESIGN PRESSURE 1.00 MPa(g) NOTE 14

2''-P-041-0255-A2AP-PG
NOTE 12 NOTE 14 UV
0.75" CWS RS 0621
1. DELETED.
DESIGN TEMPERATURE 175°C 76°C C

MIN
041-3002M 2. DELETED.
041-E-612 041-EJ-612
F INSULATION TYPE PP NI F

16"-P-041-0240-A2AP-PG
14"-CWR-041-0009-A2AW-NI 0.75" 0.75" LPS 1.5"
TRIM SPECIFICATION A2AP-PP A2AW-NI
SIZE: 3L4 041-3103M
14"-CWS-041-0010-A2AW-NI
PSET: 0.34 MPa(g) 0.75" 0.75" FC
TSO

NPIC-041-E-0151M
1''-LPS-041-0017-A1AS-HS
1"-P-041-0251-A2AP-NI NOTE 4 041 1''-P-041-0253-A2AP-HC NPIC-041-E-0129M
PSV 6"-FLG-041-0056-A1AP-NI
041

4"-P-041-0241-A2AP-PG
041
RO PG 0621 041
NPIC-041-E-0137M NPIC-041-E-0129M

NPIC-041-E-0158M
0621 0621 FREE DRAINING PG
FLG 0623
041-3503M
8"-P-041-0238-A2AP-NI

LPN 1"-LPN-041-0008-A1AA-NI 041


FEED DWG.No.

FREE DRAINING
FI
NPIC-041-E-0158M ST
G 041-3603M 0622
WO G

0.75''-LPCW-041-0045-A2AS-PG
0.75" 0.75" 0.75" RUN
1" 041 START/STOP 041
US MGL

TWO PHASE FLOW


0.75"
MIN

0622 0621A

NPIC-041-E-0120M
0.75"

NPIC-041-E-0141M
DWG.No. Title
NOTE 15
LPS 2"-LPS-041-0016-A1AS-HS 2" REFERENCE DRAWINGS
041 2 19/MAY/15 FOR CONSTRUCTION TTH TN TNS
041-3103M FE
FREE DRAINING

041 H 041 H 0621 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS


0.75" 0.75" 041 H
LI LI
2"-P-041-0252-A2AP-HC PI 0 28/MAR/14 FOR CONSTRUCTION TTH TN JMD
2"-P-041-0244-A2AP-HC

0622 041 H 0622 L 0621 L


M-2 041 H 041 041 041 B 11/NOV/13 FOR APPROVAL DMO RKM SMA
TI FI FT

4"-P-041-0325-A2AP-NI
H 0621
A, B, C, D, E
RS 041
LI
0623
US
0621 0621 0621 A 13/JUL/13 FOR REVIEW DMO RKM SMA H
PG L Rev Date Description Prep'd Chk'd App'd

FREE DRAINING
M 0624 LPCW REVISIONS

NPIC-041-E-0120M

NPIC-041-E-0120M
PA 1"-PA-041-0004-A2AA-NI

FREE DRAINING
3" -300# 041-3103M 041 Operation Centre JOB Code:
041-3603M FI
041 041 041 041 041 0621L Operation Centre DWG.No.:
0.75" 041
PT TT LI LT LT LT 2''-P-041-0254-A2AP-NI Contractor JOB Code Responsible Company
0622 0621 0622L 0622 GWR 0621 GWR 0623
GWR 0-6495-20 TPM
SVW 2"-CBD-041-0028-A2AP-NI NOTE 13 IN VIEW
2" 6" NOTE 2 0.75" Prepared by Checked by Approved by
041-3301M
2" T. T. HUONG T. NGUYEN T. N. SON
NPIC-041-E-0120M

0.75"" 0.75" 8" VH NOTE 8 NOTE 16


041-SVW-01 4" 4"
I 2"-SVW-041-0006-A2AW-NI I

NPIC-041-E-0146M
NPIC-041-E-0120M

NSRP
CLOSED BLOWDOWN 1:500 041-V-612 Complex Project
LO Nghi Son Refinery and Petrochemical
10''-CBD-041-0020-A2AP-NI MH
041-3702M
24" Nghi Son, Vietnam Limited Liability Company
FROM HEADER NOTE 1 0.75"
Drawing Title

4"-WO-041-0001-A2AP-NI
J PIPING AND INSTRUMENT DIAGRAM J

4"-P-041-0242-A2AP-NI
PENEX
UNIT 041

NPIC-041-E-0158M
NOTE 9
041-P-612
NOTE 7, 10 CLOSED BLOWDOWN DRAIN DRUM

Issue Purpose Document Class


FOR CONTRUCTION Z
K LIGHT SLOP WASTE WATER Unit No. Unit Abbreviation PCWBS Size Scale K
TO UNIT 156 TO UNIT 190
041 PENX A900 A1 NONE
156-TK-001 190-TK-201A/B

DR01A
Contractor DWG.No. Sheet Rev.
A1

041-1001M 041-1001M D-041-1225-0101M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
11 12 13 14 15 16
Attachment : S-000-1730-0815M_0_0030 System No. : 041-SVW-01

1 2 3 4 5 6 7 8 9 10 11 12 13 14 Package No. 15 16 7 of 7
: 041-SVW-01-SV-1 Page

A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


041-EJ-613 041-V-615 041-Y-620 041-P-615A/B
0014V AND D-000-1225-0020V TO 0026V.

EJECTOR CANISTER FILTER 1. VALVE TO BE LOCATED IN PIT. EXTENDED STEM FOR VALVE
A CAUSTIC CLOSED BLOWDOWN DRUM CAUSTIC CLOSED BLOWDOWN DRUM PUMPS OPERATION TO BE PROVIDED AT GRADE LEVEL. A
CODE ASME VIII DIV 1 CODE ASME VIII DIV 1
CODE ASME VIII DIV 1 CODE API 610
CAPACITY 4.1 m 3/hr CAPACITY 19 Nm³/hr 2. LI TO BE READABLE FROM PUMP LOCAL START / STOP BUTTONS.
SIZE: I.D x TT 2000 mm x 4000 mm PUMP TYPE/NO. OF STAGES CENTRIFUGAL VERTICAL / 1
DESIGN PRESSURE 0.7 MPa(g)+FV@265°C DESIGN PRESSURE 0.34 MPa(g) 3. CANISTER FILTER MEDIUM TO BE PERIODICALLY REPLACED.
DESIGN PRESSURE 0.34 MPa(g) RATED CAPACITY/NPSHr 11.9 m3/hr/1.4m
DESIGN TEMPERATURE 265°C DESIGN TEMPERATURE 100°C 4. 40 x 5MM HOLES TO BE PROVIDED ON THE BOTTOM OF PIPE FOR
DESIGN TEMPERATURE 100 °C DIFF.HEAD/SHUT-OFF PRESSURE 68.3 m/ 1.43 MPa(g)
INSULATION TYPE PG INSULATION TYPE NI AIR PURGE.
INSULATION TYPE NI SPECIFIC GRAVITY @ PUMPING TEMP. 1.16 NPIC-041-E-0158M
TRIM SPECIFICATION A2AN04-PG TRIM SPECIFICATION A2AN04 5. 041-P-615B IS A WAREHOUSE SPARE.
TRIM SPECIFICATION CCB-041-0020-A2AN04-NI MOTOR SIZE 18.5 kW
NPIC-041-E-0158M
NOTE 10 INSULATION TYPE NI 6. DELETED.
B TRIM SPECIFICATION A2AN04-NI 7. PIT COVERED BY GALVANIZED METAL GRATING. B
8. FOR SAMPLE CONNECTION DETAILS, REFER TO DWG.
TO ATM
AT SAFE LOCATION D-041-1225-2401M.

9. FOR PUMP AUXILIARY DETAILS, REFER TO DWG. D-041-1225-2206M.

10. SUBJECT TO STEAM-OUT. STEAM-OUT CONDITIONS ARE


0.34 MPa(g) @ 175 °C AND FV @ 175 °C.
TO ATM 11. EQUIPMENT AND PIPING IN CAUSTIC SERVICE SHALL BE FLUSHED
2"-V-041-0004-A1AP-NI AT SAFE LOCATION
C WITH WATER PRIOR TO STEAM-OUT.
C
12. RESTRICTION ORIFICE WITH 2.21 MM HOLE .

13. PORTABLE PUMP WILL BE CONNECTED TO THE VALVE FOR


DRAIN-OUT OF ACCUMULATED LIQUID AT BOOT.

14. SAMPLE CONNECTION DRAIN SHALL BE COLLECTED IN A POTABLE


DEVICE.
2"-V-041-0010-A1AP-NI 15. NOZZLE LENGTH SHALL BE 150MM. NPIC-041-E-0146M
1"
16. FILTER TO BE REMOVED PRIOR TO STEAM OUT.
D NPIC-041-E-0152M NOTE 3 17. MEDIUM WITHDRAWAL.
NPIC-041-E-0158M D
NPIC-041-E-0158M RS

PERMANENT LINE
4" 041-Y-620 SUBJECT TO
NOTE 17 NOTE 16
SIZE: 2J3 SERVICE TEST
PSET: 0.34 MPa(g)
0.75" 0.75" TEST POINT
FLG 4"-FLG-041-0059-A1AP-NI FREE DRAINING 041
PSV
041-3503M 0631
TYPE J1
E LO NOTE 8, 14 E
041 041 A. DELETED.
PG SC
0632 0631 B. DELETED.
MIN

1. DELETED.
0.75" 041
PG
2" 0631 0.75" 041
2. DELETED.
US
0631

O
F F

2"-CCB-041-0008-A2AN04-NI
041
UV
6"-CCB-041-0018-A2AN04-NI 1''-LPS-041-0019-A1AS-HS 0631 NPIC-041-E-0151M
C

LPS
LPS 2"-LPS-041-0018-A1AS-HS 2"-CCB-041-0013-A2AN04-HC
041-3103M
041-3103M 1.5"
NPIC-041-E-0158M FC 041-EJ-613
FREE DRAINING

0.75" 0.75" NPIC-041-E-0158M NPIC-041-E-0158M


0.75" 0.75" TSO
NPIC-041-E-0129M
NOTE 12 041
041 PG RUN
RO 0633 041 START/STOP 041 FEED DWG.No.
0.75''-LPCW-041-0044-A2AS-PG LPCW
G 0631 1"-CCB-041-0017-A2AN04-HC US
0632
MGL
0631A
ST
TWO PHASE FLOW 041-3103M
G

2"-CCB-041-0016-A2AN04-PG
LPN 1"-LPN-041-0011-A1AA-NI 041

NPIC-041-E-0141M

NPIC-041-E-0120M
FI
041-3603M 0631 0.75"
NOTE 2
0.75" 0.75" 1" DWG.No. Title
041 H 041 041 H WO
LI LI REFERENCE DRAWINGS

FREE DRAINING
LI
0631
L 0631L 0632
L
M-2 H
2 19/MAY/15 FOR CONSTRUCTION TTH TN TNS
NPIC-041-E-0137M 041 041

4"-P-041-0326-A2AN04-NI
A, B, C, D, E LI US 1 24/NOV/14 FOR CONSTRUCTION TTH DM TNS
NPIC-041-E-0158M
0633 0631 0 28/MAR/14 FOR CONSTRUCTION TTH TN JMD
041 H L
PI M RS B 11/NOV/13 FOR APPROVAL DMO RKM SMA
H PA 1"-PA-041-0003-A2AA-NI 0634 300# A 13/JUL/13 FOR REVIEW DMO RKM SMA H
041-3603M Rev Date Description Prep'd Chk'd App'd
041 041 041 2''-CCB-041-0015-A2AN04-NI
LT LT REVISIONS
0.75" 0631 0632
041-V-615 LT
0633 Operation Centre JOB Code:
041-SVW-01 041 GWR GWR GWR
PT 4" NOTE 13 NOTE 11 Operation Centre DWG.No.:
2" 0634 MH
SVW Contractor JOB Code Responsible Company
22"-SVW-041-0007-A2AW-NI
SVW 041 0007 A2AW NI 2"-CCB-041-0012-A2AN04-NI 24" 2"
NPIC-041-E-0120M

VH NOTE 7 NOTE 15 0-6495-20 TPM


041-3301M 4" 4"
8" Prepared by Checked by Approved by
0.75" 0.75"
T. T. HUONG T. NGUYEN T. N. SON

2"-SCAU-041-0002-A2AN04-NI
NPIC-041-E-0146M
NPIC-041-E-0120M
I I
CAUSTIC CLOSED BLOWDOWN 1:500 LO
041-3702M
3"-CCB-041-0009-A2AN04-NI
NSRP
FROM HEADER NOTE 1 Complex Project
0.75" Nghi Son Refinery and Petrochemical
Nghi Son, Vietnam Limited Liability Company

Drawing Title

J NPIC-041-E-0158M
PIPING AND INSTRUMENT DIAGRAM J
NOTE 4 041-P-615A PENEX
NOTE 5, 9
UNIT 041
CAUSTIC CLOSED BLOWDOWN DRAIN DRUM

CAUSTIC BLOWDOWN Issue Purpose Document Class

TO UNIT 190 FOR CONSTRUCTION Z


K 190-TK-101 Unit No. Unit Abbreviation PCWBS Size Scale K
041-1001M
041 PENX A900 A1 NONE

DR01A
Contractor DWG.No. Sheet Rev.
A1

D-041-1225-0102M 001 OF 001 2

IN
10-SE
5
P-2 1 2 3 4 5 6 7
8 9
10 11 12
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.
13 14 15 16
PJ Name: NSRP Complex Project Attachment: S-000-1730-0815M_0_0040
Contractor JOB Code: 0-6495-20 Contractor Doc No.: S-000-1730-0815M_0

PRE-COMMISSIONING
SERVICE TEST/ INERTING
LIST OF CONTROL VALVE/ ON-OFF VALVE/ MOTOR OPERATED VALVES TO BE FORCED OPEN
SYSTEM No : ServicesTest/Inerting Package No.:

SYSTEM Name : LOCATION :


Overridden by Reinstatement
Valve Tag no. Reference P&ID
DATE CONTRACTOR EMPLOYER DATE CONTRACTOR EMPLOYER

Remarks :

INSPECTORS Subcontactor (HOLD) Contractor (JGCS) Employer (NSRP)


NAME
SIGNATURE
DATE

D R A
IN
10-SE
P - 2 0 15