2017-2022
PRELIMINARY PAGES
ECOLOGICAL PROFILE
LGU Vision & Mission:
VISION
MISSION
Sometime in October of 2002, a group of elders and local leaders from the
Municipality of Sultan sa Barongis started to discuss the urgency of creating a
new municipality to separate initially 17 barangays.
A resolution was passed but was not approved due to some technical issues,
including the proper and appropriate naming of the said municipality.
Numerous public consultations headed by the group’s leader were held. The
name “Kabalukan” was then being suggested for the new municipality in
recognition of its prominent tourist spot, Mount Kabalukan.
Others suggested various names of prominent local families until someone
mentioned the name of “Radjah Buayan”, arguing that almost all families from
the eleven barangays were his descendants. Radjah Buayan is a legendary
fighter known amongst the Bangsamoro people even before the coming of the
spaniards. He is the first male grandchild of the famous Muslim missionary,
Shariff Kabungsuan, by his daughter Putri Tunina.
Fortunately, the majority agreed to the name “Radjah Buayan”, thus it was
adopted.
On July 6, 2004, Radjah Buayan was created as a municipality by virtue of
Muslim Mindanao Act. No. 166, otherwise known as “An act creating the
Municipality of Radjah Buayan and appropriating funds thereof”.
And was ratified by the Commission on Elections on September 4,2004.
Health
Education
Housing
Based on the 2010 NSO Census on Housing, there were 4,614 housing units in
the municipality.
In terms of tenure status, 2,059 (45%) housing units are owned, 2,059 (45%)
are being amortized, 370 (8%) are being occupied for free with the consent of
the owner and 105 (2%) housing units are being occupied without the consent
of the owner.
Employment rate
As of 2016 data from the Municipal Treasurer’s Office of Radjah Buayan, the
employment rate registered at 68% compared to 67.3% in 2015. Majority of
these populace (5,496) work as farmers or are engaged in agro-related activities.
Number of overseas Filipino workers (OFWs)
Protective Services
The municipality has 25 strong Police officers and personnel that handle the daily
peace and order situation in the locality, and is further enhanced by the presence
of 5 jail personnel.
In keeping the peace, the municipality has a police facility that seat on an 820
square meters area in Barangay Zapakan.
For more effective response time in case of emergency, the municipality has one
(1) Kawasaki type motorcycle.
As of 2016, the personnel to population ratio of Radjah Buayan are at 1:1000.
On the other hand, fire protection services in Radjah Buayan are provided by the
local branch of the Bureau of Fire Protection (BFP), which falls under the
operational control and supervision of the BFP Regional Office.
As of 2016, the local firefighting force is composed of 13 personnel.
The presence of the 40th Infantry Battalion of the Philippine Army in Barangay
Zapakan, additionally ensures the peace and order in the municipality.
Tourism
The Municipality of Radjah Buayan is blessed with rich natural resources and vast
tourist attractions. Mount Kabalukan also known as “Reina Regente”, which
means “Queen of the Regents” is located in Barangay Bakat, and is the lone
tourism site available in the municipality. Though, it also has substantial amount
of areas for potential tourist destinations particularly in Barangays Bakat,
Tabungao and Zapakan, which have not been developed yet.
In 2016, the Provincial Tourism Office of Maguindanao, identified numerous
potential sites for tourism activities, these are: Lantaka a Pusaka in Barangay
Tabungao, General Wood-Datu Utto Treaty Site and Minanga sa Bakat both in
Barangay Bakat, Kabulakan Hills Eco-Tourism Zone in Barangay Tabungao,
Zapakan Memorial Shrine and Cemetery, the final resting place of pre-colonial
leaders, particularly the leader of Radjah Buayan’s Sultanate and Maitum-a-ig
Forest Park Development in Barangay Zapakan.
Land Transport
As of 2016, the municipality’s public transportation system is mainly provided by
a total of 25 Public Utility Vehicles (PUVs).
In terms of vehicle type, tricycles dominate the municipal roads, accounting to
twenty units (80%); while Public Utility Jeepneys (PUJs) account to five units
(20%). These cover routes to other neighboring towns and also intra-municipal
routes.
At present, only one (1) private Transport Terminal serves the municipality.
Zapakan Terminal, which is located in Barangay Zapakan seats in a hectare area
and was constructed in 2010.
Communication
As of 2017, there is still no telecommunication company that provides basic
telecommunication services in the municipality.
Wireless communication companies such as Smart and Globe have very slow
signals and can only be accessed in certain areas in the municipality.
There is no fixed line telecommunication system, Internet, postal services or
clear broadcast media in Radjah Buayan.
Water
An impounding water structure in Barangay Zapakan, supplies the level II water
supply requirement of Radjah Buayan. Its main water source comes from
Kabulnan River, Bakat River, Maitum-a-ig creek, Baital Lake, Sampao Lake and
11 deep well pumping stations located in strategic locations within the eleven
barangays of the municipality.
Power
Maguindanao Electric Cooperative (MAGELCO), provides 78% (3,870) of
municipality’s households with electric power services.
As of 2017, all barangays are energized except for Barangays Dapantis and
Sampao.
Public Markets
As of 2016, the municipality has three (3) public markets: Zapakan, Malibpolok
and Baital Public Markets. Each occupies 1 hectare, except for the municipal
commercial market, Zapakan Public Market, which seats in a 5000 square meter
area in Barangay Zapakan.
Lands
Radjah Buayan has a total land area of 7,198 hectares.
In terms of land classification, 1,005 hectares (13.96%) are classified as Public
Domain, particularly unclassified public land/forest and can be found in
Barangays Tabungao, Bakat, Panadtaban and Malibpolok. On the other hand,
Alienable and Disposable (A & D) lands take up 6,193 hectares (86.04%), which
is further distributed as follows: 5,834 hectares (Agricultural), 50 hectares (Built-
up), and 309 hectares (others).
Water Resources
The municipality is blessed with a beautiful lake, Limaulan Lake and a cold spring
both in Barangay Bakat.
Air Quality
As of 2016, the air quality of the municipality was rated as Good, due to the lack
of industrial and atmospheric pollutants.
Waste Management
As of 2017, Rajah Buayan does not have a garbage collection scheme, but it is
one of the local priority programs that need to be adopted so that waste
collection schemes particularly for the eleven barangays shall be put in place.
Component Barangays
Radjah Buayan has a total of eleven (11) barangays. In terms of population,
Tabungao is the largest with 3,033 inhabitants as of 2015 while Pidsandawan is
the smallest with 1,199.
In terms of land use, Mileb is the smallest with 280 hectares while Tabungao is
the biggest with 1,337.
Although, the municipality is generally a least dense locality, in terms of
population density, Barangay Mileb is considered the most dense at 9 inhabitants
per hectare while Barangays Baital, Panadtaban and Tabungao are the least
dense at only 2 inhabitants per hectare.
This part presents these indicators, which were presented to, debated and validated
by the participating stakeholders during the series of sectoral planning workshops
conducted in September-December 2016.
Table 1. Local Development Indicator Trends and Analysis of the Social Sector
of Radjah Buayan
- More resources
for living
Growth rate, urban No Data No Data No Data
and rural, short-term
medium term, long
term (formula used)
Gross population 2.42 3.3 An increase by
density, 2 reference 0.88
years
Net population 16.13 21.9 An Increase by
density, 2 reference 5.77
years
Percent of urban 0.09 0.10 A increase by
population, 2 0.01
reference years
Urban population 1.87 3.0 An increase by
density, 2 reference 1.13
years
LEVEL OF WELL BEING: Access to Education
SY 2015 - SY 2016 -
2016 2017
Net enrollment rate in 411 550 An increase by The district
kindergarten 139 enrollees provided the
learning materials
inside classroom,
feeding program,
and the teaching
strategies of
teachers
Proportion of 6-12 No Data 1:6
years old children
who are not in
elementary school, by
sex, latest
Net enrollment rate in 4,921 5,023 An increase by -The district
elementary 102 students provided the
learning materials
inside classroom,
feeding program,
and the teaching
strategies of
teachers
-Teachers
attending
seminars in all
subject areas
specially the new
Curriculum (K-12)
Completion Rate of (S. Y. 2014- (S. Y. 2016- An increase by Some pupils from
Elementary Schooling 2015) 2017) 1.63% the previous years
were transferred
88.37% 90.% from other school
due to family
migration/conflict.
Elementary NAT (S. Y. 2014- S. Y. 2014- An increase by Good performance
Results 2015) 2015 3.18% of the teachers
and learners in all
85.37% 88.55% academic subjects.
56%
Ratio of girls to boys 1:1 1:1
in secondary and
tertiary school, latest
- Lack of water
supply
- Habit of the
community
Proportion of children Males – 5 Males – 6 An increase by 1 - No sustainability
0-5 years old who are for both sexes of commodities
below normal weight Females - 5 Females - 7 (Ex.Supplementary
for their age by sex,
food, Plump doze,
latest
EZ50)
- Lack of support
from the BLGU
Proportion of children Males – 4 Males – 5 An increase by 1 - Lack of
0-5 years old who are for both sexes awareness on
above normal weight Females - 3 Females - 4 proper nutrition
for their age by sex,
latest
Proportion of children M – 40 M – 87 An increase by - No sustainability
0-5 years old who are 47 males and 30 of commodities
stunted and wasted F - 38 F - 68 females (Ex.
by sex, latest
Supplementary
food, Plump doze,
EZ50)
- Lack of support
from the BLGU
Proportion of children 0 0 No Changess
under 5 years old who
died of illness, 2
reference years by
sex, latest
Proportion of women 0 0 No Changes
who died due to
pregnancy, 2
reference years
Proportion of 2 births 73% 78% An increase by - No birthing clinic
attended by skilled 5% (55) - RHU is not MCP
health personnel to (353) (408) Accredited
total deliveries, by
sex, latest
Number of returning No Data No Data
Patients
Funds allocated for No Data No Data
treatment of patients
Patient to Facility 0 0
Ratio (See Annex 1
for Minimum Standard
Requirements as a
Treatment
Rehabilitation Center)
Personnel to Patient 0 0
Ratio
a. Doctor
b. Nurse
Patient to Facility 3 BHS 3 BHS No Change in - 8 barangays has
Ratio (For non-drug Number no BHS
users) 1 RHU 1 RHU
- RHU is not fully
equipped
Personnel to Patient An increase in - Only 1 MHO, 1
Ratio (For non-drug all personnel to regular PHN, 3
users) Patient Ratios regular midwives
a. Doctor 1:18,951 1:23,652
b. Nurse 1:6,317 1:8,884 - 1 NDP, 1 PHA, 4
c. Midwives 1:2,707 1:2,956 MECA, 1 RHMPP
d. BHW 1:1,263 1:1,576
DOH and PhilHealth No LGU run No LGU run No Changes - RHU is not MCP
accreditation of (X hospital hospital accredited, no
over total) delivery room,
a. LGU-run hospitals No LGU run No LGU run small RHU Space
b. LGU-run pharmacy Pharmacy Pharmacy
c. RHUs
2-in1 2-in1
accredited accredited
Prevalence rates of No No No Changes - Poor health
HIV/AIDS, malaria, HIV/AIDS HIV/AIDS seeking behavior
tuberculosis, and - Low compliance
other diseases, by TB- 90% TB- 90% on 6 months
sex, latest incidence incidence treatment
Death rates of 0 0 No Changes
HIV/AIDS, malaria,
tuberculosis and other
diseases by sex, latest
Philhealth Not MCP Not MCP No Changes No delivery room,
accreditation in its Accredited Accredited small space
main health facility or
rural health unit for
Maternal and Primary
Care
Philhealth 0 0 No Changes
accreditation in
Barangay Health
Station for Maternal
Care Package
SOCIAL JUSTICE: Poverty
Proportion of Level I-34 Level I- 27 A decease by 7 -More access to
households whose social services
members eat less such as 4P’s
than 3 full meals a program,
day, 2 reference years Sustainable
livelihood
program, Pamana
livelihood
program, FDS
Seminars, PES
Skills trainings/
Seminars.
-Backyard
gardening
programs
Gender Development No Data No Data
Index
SOCIAL JUSTICE: Security
2014 2015
Proportion of 135 102 A decrease by HHs are victims of
households who are 33 HHs. natural and man-
informal settlers, 2 made calamities
reference years and
IDPs coming from
adjacent
municipalities.
Proportion of Roof and Roof - 92 Decrease -Construction of
households with walls core shelter
dwelling structures Lvl1-1349 assistance funded
unable to protect by the PAMANA
them from the Habitat.
elements, 2 reference
years (focus on -Gawad
roofing and outer Kalinga/ABS-CBN
walls) Some of the
constituents were
able to went out
of the country to
work and to uplift
their living
condition and be
able to
construct/renovate
their houses.
Proportion of Level -128 Level I- 56 A decrease by -Detachment of
households without 72. potable water
access to level II and system.
level III water supply
system, 2 reference -Diffusion of
years information,
education,
campaign (IEC)
-Conduct of IEC by
the Regular
Workers (MSWO)
-Support of MLGU
-Distance of Day
Care facilities.
Table 2. Local Development Indicator Trends and Analysis of the Peace and
Culture Sector of Radjah Buayan
2015 2016
Number of drug 182 182 No change in 90% of all the
personalities number. barangays are
affected. Most
specially Barangay
Panadtaban.
Number of drug 0 0 0 Lack of funding.
clearing operations
Number of buy-bust 0 0 0
operations
Presence of 0 0 0 There is a need for
rehabilitation services rehabilitation
for drug dependents programs and
(centers/ outpatient support facilities.
care)
Partnerships with 0 0 0 No program is yet
CSOs/NGOs/POs for implemented.
rehabilitation and
aftercare of drug
dependents
# of former drug 0 0 0 There is no
users enrolled under funding yet
ALS program of available for this
TechVoc Institutions program and lack
of information
dissemination
# of Educational 0 0 0 Lack of funding.
Scholarships provided
to former drug users
Number of former 7 7 No Changes -All former drug
drug users self- users originate for
employed/employed Barnagay
Zapakan. Other
dru-users from
other barangays
are afraid to com
out.
-There is no
available support
program for drug-
users.
# of former drug 0 0 0 There is no
users who have livelihood project
availed livelihood to cater for drug-
projects and pushers who
programs intend to
surrender yet in
RB.
Organization of MASA 0 0 0 The program was
MASID Teams in launched on
respective barangays January 17,2017.
Organization of 0 0 0 There is a need for
Community an outpatient drug
Rehabilitation rehabilitation
Network in respective program to be
barangays established.
Number of 0 0 0 There is no
surrendered drug existing program
personalities enrolled for such purpose.
in the community-
based rehabilitation
program
Number and types of 1 3 An increase by 2 -There is a need
violent incidents incidents for more
related to armed policemen
groups
-There is a need
for more police
outposts.
Number and types of 0 0 0 There is no record
violent ethnic showing ethnic-
conflicts related violence.
People co-exist
peacefully.
Number and types of 0 2 An increase by 2 Family feud due to
resource-based incidents land grabbing in
conflicts (i.e. Barangay Mileb.
minerals, forestry,
agrarian land, water)
Number of 0 0 0 Since the signing
communities, of the CAB, no
households and incidence has been
individuals displaced reported.
by armed conflict
Number and location 3 3 No Changes There is a need for
of military camps and more
police stations military/police
outposts aside
from the ones in
Barangays
Zapakan and
Bakat.
Ratio of military and 1:52 1:52 No Changes The current police
police personnel to personnel is as
total population follows:PNP-21
AFP- 419.
-There is a need
for more FMRs.
Number of traffic 0 11 An increase by There is a
warning signage 11 signages necessity to install
installed installed in more signages in
Barangay other barangay as
Zapakan well.
Number of CCTV 0 0 0 N/A
installed
Number of 0 0 0 N/A
communities recently
affected by natural
calamities
Number of fire 0 0 0 N/A
incidents
-there is no
industries aside
from agriculture-
based.
-Low educational
attainments.
Underemployment No Data No Data
Rate
Unemployment Rate 79 80.5 An increase by There is still a
1.5% need for more
income
generating
activities and job
generation.
Average Family No Data No Data
Income
Percent labor force 37.8% 38% An increase by
employed by sex, 2 0.2%
reference years
Dependency ratio, 2 No Data No Data
reference years
(youth and old age)
Percent of workers No Data No Data
in non- agricultural
occupation, 2
reference years
Proportion of No Data No Data
persons 15 years old
and above who are
not working but
actively seeking
work
Proportion of No Data No Data
children below 15
years old who are
employed to the
total number of
employed persons
% of jobs created No Data No Data
out of LGU
employment and
support services
Industry and Services
Household Income
Percentage of No Data No Data
households with
secondary/ tertiary
source of income
Percentage of No Data No Data
households engaged
in main source of
income only to total
number of
households
Agriculture
Agricultural Production
Volume/value of Rice- 3,200 Rice-2,900 There is a Lack of water
agricultural crop m.t m.t decrease in the supply
production by major Corn- Corn-11,430 production of Lack of post-
crop, 2 reference 11,550 m.t m.t both rice and harvest
years corn. facilities
Volume/value of fish No Data No Data Lack of market
production inland & support
marine, 2 reference (Traders will
years take advantage
Fishing HH/Total HH – very low
Forestry price)
Per capita value of No Data No Data High cost
production agricultural
Employment No Data No Data inputs
contribution of No irrigation
forestry in percent of system
total employment Low yield
Fishery presence of
pest and
Per capita fish No Data No Data
diseases
consumption
(m.t./year Low quality,
low price & low
Ratio of commercial No Data No Data
income
fishing production
High capital,
versus municipal
low crop
fishing production
production and
Tenure Arrangement
low income
Area by tenure of 1.9 Ha./HH 1.1 Ha./HH There is a
90% of crop
farm per household, decrease by 0.8
production are
2 reference years Ha. Per
marketed to
Household
nearby
Gender Equality
Share of women in No Data No Data municipalities
non- agricultural and only 10%
wage employment goes to home
Food self- sufficiency consumption
Food self-sufficiency No Data No Data
index by food
groups, latest
Land Use and Land Productivity
Extent of area 18% 18%
devoted to
agriculture in
percent of A&D
Land Use changes
(ha/year) 5,944 ha 5,944 ha No Changes
Land productivity Rice-3,200 Rice-2, No changes on
(m.t./ha m.t/1,600 900m.t/1,450 the land
ha (2 ha (2 m.t/ha) productivity for
m.t/ha) Corn-11, rice & corn
Corn-11, 430/3,810 (3 production but
550/3,850 m.t/ha) land
(3 m.t/ha) Coconut-4, productivity for
Coconut-4, 600/115 (40 coconut
250/115 m.t/ha) increased by 3
(37 m.t/ha) m.t/ha
Ratio of upland No Data No Data
devoted to
agriculture over total
upland area (in
percent)
Areas under IPM 450 300 There is a
relative to total Ha./5,915 Ha./5,915 decrease by
cropland (in percent) Ha. = 8% Ha.= 5% 3% on areas
under IPM
relative total
cropland
Other Agricultural Areas
Cropland per 1:1 1:1 No change
agricultural worker
(ha)
Extent of agricultural 79% 81% An increase by
area under 2%
mechanized
cultivation (in
percent)
Ratio of agricultural 4,700:6 4,800:4 There is an There is a need
workers to the increase by 100 for more
number of of agricultural agricultural
harvesters/threshers workers and a support facilities
servicing the area decrease by 2 to cater for the
of harvesterts increasing
and threshers number of
servicing the agricultural
area workers.
Extent of irrigable, 0 0 0 There is currently
irrigated, rain fed, no irrigable,
non-irrigated and irrigated, rain-
prime lands fed, non-irrigated
converted to non- and prime lands
agricultural uses converted to non-
(ha/year) agricultural uses
in RB.
Industry
Ratio of electrical 0 0 0 There is an
energy consumption urgent need for
in industry & the establishment
commerce to total and promotion of
consumption industries that
Volume/value or 0 0 0 would help boost
mining/quarrying the municipality’s
production, 2 economy.
reference years
Services
Business Friendliness
# of new businesses No Data No Data No Data -There is a need
registered with LGU for campaign
per year projects
Number of Business No Data No Data No Data promoting the
Renewal municiaplity as a
Amount of Capital 0 0 0 business hub
Investment of New locality.
Business and
Business Renewal -There is a need
# of projects and 0 0 0 for financial
programs in support institutions that
of micro, small, and would help
medium enterprises sustain the
Total number of 0 0 0 financial capital
commercial needed by
establishments, in businessmen.
EEU, 2 reference
years There is a need
Number of Big 0 0 0 for agricultural
(Multi-national, support programs
National Brands) for farmers.
Operating Locally
Number of former 7 7 There is no A program that
drug users self- Change in supports former
employed/employed Number. drug-users
should be
established in the
locality.
Livelihood
% of vulnerable 0 0 0 There is no
population, as established CBMS
identified through in the
CBMS, covered by municipality.
livelihood projects
and programs
# of available 1 1 No change on -There is a need
livelihood projects the number of for more
and programs available livelihood
livelihood programs.
projects and
programs -There is also a
need for
provisions of
farming inputs
and facilities.
# of former drug 0 0 0 There is a need
users who have for livelihood
availed livelihood programs aside
projects and from
programs rehabilitation
facilities to cater
for these
populace.
Tourism
Percent of taxes No Data No Data No Data No tourism
gained from officer
Tourism-related No
businesses institutionalized
Number of tourists No Data No Data No Data tourism plan,
per year council, code
Number of No Data No Data No Data Under develop
households tourist spots
benefitting from No tourist data
Tourism Activities bank system
(households offering
accommodation,
tour services, etc)
Revenue generated No Data No Data No Data
from heritage
tourism
Tourism receipts per No Data No Data No Data
year
2.1.4 ENVIRONMENTAL MANAGEMENT
After comparing the above with the LGU’s Ecological Profile and the key
development indicators, the following are the vision-reality gaps for the Municipality of
Radjah Buayan, representing the key development challenges it faces over the next 6
years:
To respond to these key development challenges, six basic strategies are hereby
specified:
1. Improve access and quality of social services
2. Reduce poverty incidence
3. Improve access and quality of social services
4. Increase employment and entrepreneurial opportunities
5. Enhance livability of communities / Improve public infrastructure and facilities
6. Improve public infrastructure and facilities
7. Broaden access to participatory mechanism
CHAPTER 2
SECTORAL
DEVELOPMENT
PLANS
2.1 SOCIAL DEVELOPMENT PLAN
Introduction
Goals
Improve the quality of education of the school-going population.
Promote equitable, affordable and accessible education for all Rajah Buayans
To ensure the quality of the teaching process
To increase the performance of lower grade students (Grades 1 and 2)
Aim a zero drop-out rate
To meet the standard National Achievement Test Results both for Grades 3 and
6 level
Proposed Legislations
Adoption of a resolution towards additional sufficient school buildings
Adoption of a resolution for additional qualified teachers
Adoption of a resolution to strengthen the competency program and Reading
Camp Program of DepEd
Adopt a resolution requesting the Department of Education to provide 11
teachers to conduct NAT Class Review for Grades 3 & 6
Adoption of resolution providing learning materials and Printing of handouts
Goals
Improve the health status of the constituency
Provide affordable, quality and accessible health services to all Radjah Buayans
Improve the sanitation and hygiene practices of the populace
To ensure fast delivery of basic health services
To expand coverage of indigent families to Philhealth by 100 percent
To achieve zero malnutrition rate
Objectives & Targets
To decrease the rate of households without Sanitary Toilets from 22% to 12%.
To decrease the prevalence rate of TB from 90% to 0%
To increase the rate of deliveries in Birthing Health facilities to 100%
To decrease the incidence rate of Malnutrition
Strategies
Inviting Philhealth to a conference aimed at expanding coverage to indigent
families
Intensify IEC/ awareness regarding good proper hygiene, Safe Birthing Plans,
Proper Nutrition, and other Health Programs in an Islamic point of view
House to House visitation and counseling
One on one counseling with TB Patients
House to house screening of family members
Coordination with the MNC and BLGU
Proposed Legislations
Urging/requiring private sector to put up waste storage facilities
Establishing lying-up clinics in barangays
Expansion of PHILHEALTH coverage to all barangays
On training programs: health providers, women’s health team, hilots, midwives
Goals
To promote and to protect the rights of the marginalized sectors: children,
women, senior citizens and persons with disabilities (PWDs)
To regain the psychosocial functioning of all the constituents of Radjah Buayan
as well as their economic condition
To increase the low access of social welfare programs and services
Proposed Legislations
Ordinance supporting programs and projects for senior citizens, PWDs and
women
2.1.4 SUB-SECTOR: SHELTER/HOUSING
Goals
To achieve approved Comprehensive Municipal Shelter Plan
To expedite land conversion of land acquired by LGU for resettlement purposes
Strategies
Conduct Urban Poor Seminar/orientation to qualified / potential poor
beneficiaries re: rules and regulations
Establish systematic data base: e.g. List of beneficiaries, list of applicants,
List of lot owners/status, cost of acquisition
Proposed Legislations
Ordinance enforcing the immediate preparation and approval of a
Comprehensive Municipal Shelter Plan
Ordinance enforcing the expedition of LGU acquired lands into resettlement
areas
This area talks about issues related to protective services and preservation and
maintenance of culture & heritage. This sector suggested actions is intended to address
concerns relative to the maintenance peace, public safety while preserving the customs
and traditions of locality by providing special attention to preservation of cultural
heritage.
Strategies
Institutionalize a Municipal office that undertakes coordination and promotion for
culture and arts
Institutionalize a Special Body that focuses on the security issues of the
municipality
2.2.4 Conflict
Strengthening of MPOC
Conflict resolution through elders
Construction of evacuation facilities
Proposed Legislations
Ordinance institutionalizing allotment of funds for the procurement of firetrucks,
ammos, radios, medical equipment and supplies, establishment of fire stations at
Barangays Zapakan and outposts in every barangay
Ordinance institutionalizing allotment of funds for provision of scholarships,
trainings, livelihood and rehabilitation of drug related surrenders’
Goals
To improve agricultural production in order to sustain food self-sufficiency
To enhance income generating activities
To promote investment & business development
To develop tourism industry
Strategies
Subsidize on the purchase of agricultural inputs
Capacity produce and use of organic fertilizer
Provide skills training for organic and natural farming system
Strengthening of Farmers’ Association and Cooperatives
Ask assistance from DAF, DAR, NGOs and Foreign Assisted Projects
Coordinate with concerned line agencies such as DOLE, TESDA, and Other
Agency
Provide alternative source of income
Provide sustainable livelihood programs
Strengthen Tax Information Awareness
Invite potential investors
Conduct Investors’ Forum
Organize Micro Small-Medium Enterprises
Establish Local Economic Development Office (LEIPO Office) w/ complete
facilities
Organize Local Investment Board
Create & Appoint LEIPO
Formulate Local Investment and Incentive Code
Establishment of Economic Development System (EIS)
Provide separate office for Business Permit & Licensing Officer w/complete
facilities
Upgrade BPLS to Computerize System
Institutionalize one-stop-shop business renewal and licensing
Provide clean and safe economic zone and market site
Establish Community Based-Management System (CBMS)
Formulate Tourism Plan & Code
Organize Tourism Council
Designate Tourism Officer
Establish Tourism Office w/ complete facilities
Improve & Develop potential tourist spots and Tourism attraction:
1.) Gen. Wood - Datu Utto Treaty Site
Proposed Legislations
An ordinance mandating the Municipal Agriculturist Office to create and manage
and implement a program that aims for a sustainable agriculture for rural income
growth for Radjah Buayan
An ordinance providing funds for the procurement of post-harvest equipment
necessary crop production and also providing for the training of farmers in the
care of animal.
An ordinance providing funds thereof for the mass buying of goats and chicken
for dispersal
An ordinance mandating the Municipal Agriculturist Office to provide corn and
rice producers access to appropriate technology in these crop production
Goals
Increased income and employment
Growth of local micro and small enterprises
Be strongly competitive with neighboring municipalities
Strategies
Build and maximize more infrastructure
Provision of job opportunities through industries
Formulate a comprehensive Investment code
Encourage creation of more industries
Proposed Legislations
An ordinance mandating the organization and management of Program that
would encourage each barangay to produce and promote its major crop in the
municipality and providing funds thereof
An ordinance providing funds for more infrastructure facilities as part of the
business incentive program of Radjah Buayan
Goal
To enhance income generating activities
Proposed Legislations
An ordinance providing funds for the provision of skills enhancement training of
the constituents of Radjah Buayan
An ordinance mandating the Municipal Treasurer’s Office to allocate funds for a
sustainable livelihood program
An ordinance mandating the LGU to coordinate with concerned line national,
regional and provincial line agencies on generating more jobs
Goal
To develop the tourism industry
Proposed Legislations
An ordinance mandating the improvement and development of the identified
potential spots
An ordinance requiring the beautification/improvement of the municipal center in
Barangay Zapakan
An ordinance requiring the transport sector to undergo basic tourism education
An ordinance prohibiting the destruction of historical buildings and/or spots as
well as preserving their historical value
An ordinance prescribing the rules for the use and maintenance of the Municipal
Public Market and violations thereof
An ordinance mandating the immediate formulation of a tourism plan and code
An ordinance mandating the establishment of a tourist data base system
An ordinance mandating the designation of a qualified tourism officer
Goals
To establish an environment-friendly and ecologically-balanced Radjah Buayan
To establish Radjah Buayan as a disaster resilient municipality
Objectives and Targets
Strategies
Establish Solid Waste Management System
Introduce and encourage farmers to use organic pest control
Formulate and implement PPAs to advocate and support organic farming
Organize group to facilitate tree planting activities
Generate more livelihood opportunities and housing projects
Conduct baseline profiling (i.e. CBEMA)
Organize Bantay Kalikasan
Request for funds/projects for construction of drainage system
Strengthen linkages with agencies concerning Environment & DRRM
Request support funds/projects for the establishment of EOC
Request support funds/projects for the establishment of evacuation center with
complete facilities
Conduct coordinative meeting with insurance company
Proposed Legislations
An ordinance establishing a construction of a Septic Management System in the
municipality
An ordinance mandating the approval of Bantay Kalikasan Project
An ordinance mandating the conduction of baseline profiling
An ordinance mandating the facilitation of tree planting activities in all barangays
An ordinance mandating the immediate physical rehabilitation of areas nearby
Mount Kabalukan
Introduction
Goals
To have an efficient, adequate and high quality road network while enhancing
the socio-economic development of the constituents
To maximize agricultural production and to safeguard roads from damage and
erosion
To achieve an ideal image of good governance
Strategies
Strict implementation of existing laws and ordinances relating to transportation
Request for funding support from concerned national and local agencies
Request for funding support from the ARMM Government through DPWH
Proposed Legislations
Ordinance adopting the strict implementation of existing transportation laws and
ordinances
Ordinance requesting for funding from the ARMM government for more
infrastructure facilities
Goals
Continuous upgrading of existing communication system in Radjah Buayan
Strategies
Installation, upgrading and rehabilitation of communication lines (Globe and
SMART)
Setting up meetings with telecommunication providers for possible installation of
lines
Programs and Projects
Installation of new telecommunication lines
Upgrading and rehabilitation of existing telephone lines
Proposed Legislations
An ordinance mandating the installation of lines and the rehabilitation of old ones
An ordinance requesting the regional DOTC-ARMM office for infrastructure
projects and/or funding.
Goals
Provision of adequate and potable water supply for domestic and industrial use
To solve the problem of water borne diseases
Strategies
Request for funding support from national and ARMM Government
Continuous monitoring of water system
Ensure a well-managed water system
Ensure high level of water quality
Repair/Rehabilitation of existing water pumps
Proposed Legislations
An ordinance mandating the construction of level I and II water system
An ordinance mandating the immediate construction of pumping stations in all 11
barangays
An ordinance mandating the lobbying for funding support from national and
ARMM Government
Goals
Provision of sufficient, quality and accessible electric power services in all
barangays
Strategies
Identify areas to be energized especially those with approved housing plans
Aggregate power requirement of the municipality and look for efficient provider
Tap possible foreign and local entities for fund sourcing
Proposed Legislation
Ordinance mandating the installation of power lines in all 11 barangays,
particularly business and commercial areas
Introduction
Goals
To increase locally sourced Revenue by 5% annually
To have a functional LSB.
To establish transparent, accountable and participative governance
Strategies
CHAPTER 3
Based on Chapter 2, this chapter describes the 6-year Local Development Investment
Program (LDIP) containing a list of sectoral programs and projects in support to the
Municipal Comprehensive Development Plan (MCDP). Basically, the LDIP aims to realize
the LGUs vision, especially on four major challenges identified in the vision-reality gap
analysis.
Over the next six years, it will require a total of 74,453,000 million to implement
these programs and projects of which 17,441,000 (23.43%) will be put up by the
municipal government, with the balance of 54,920,000 (73.76%) to be sourced either
from Provincial, Regional or National Government and 2,092,000 (2.81%) million to be
lobbied from private or INGO agencies. These are detailed in the tables that follow.
EDUCATION
Bayanihan 3,900,000.
Classroom 780,000.00 780,000.00 780,000.00 780,000.00 780,000.00 00
Constructio
n Project
(BCCP)
Teachers 360,000.00
Review 80,000.00 70,000.00 70,000.00 70,000.00 70,000.00
Program
(TRP)
during
vacation
(April-May)
Enhancing 600,
the 120,000.00 110,000.00 110,000.00 110,000.00 110,000.00 000.00
Performanc
e and
Participatio
n in the
Classroom
Opla
n
Tuto
k
Basa
NAT
Revie
w
Class
Zero
Drop
out
Rate
TOTAL 980,000. 960,000. 960,000. 960,000. 960,000. 4,260,00
EDUCATIO 00 00 00 00 00 0.00
N
HEALTH
Sanitary
Awareness
Program
Common 175,000.00 175,000.00 175,000.00 175,000.00 175,000.00 875,000.00
Sanitary
Toilet
Reward 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 250,000.00
Sytem for
ZOD
Barangay
TB Program 0.00
TB Club Day 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 300,000.00
Community 120,000.00 120,000.00 120,000.00 120,000.00 120,000.00 600,000.00
Health
Assembly
Maternal 0.00
Health
Program
Construction 0.00
of Health
Facility
Buntis 20,000.00 20,000.00 20,000.00 20,000.00 20,000.00 100,000.00
Party/Carava
n
Hilot-Midwife 40,000.00 40,000.00 40,000.00 40,000.00 40,000.00 200,000.00
Partnership
Nutrition 0.00
Program
"Gulayan" 55,000.00 55,000.00 55,000.00 55,000.00 55,000.00 275,000.00
Project
Nutrition 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 300,000.00
Activities
TOTAL 580,000. 580,000. 580,000. 580,000. 580,000. 2,900,00
HEALTH 00 00 00 00 00 0.00
SOCIAL
SERVICES
Constructio
n of social
welfare
facilities
a. OSCA 160,000.00 160,000.00
building
b. PDAO 160,000.00 160,000.00
c. Women 160,000.00 160,000.00
center
d. 200,000.00 200,000.00
Rehabilitation
center 1
UNIT
e. Evacuation 2,000,000. 2,000,000.
center with 00 00
complete
facilities
f. ECCD 36,000.00 36,000.00 36,000.00 36,000.00 36,000.00 180,000.00
w/complete
facilities and
materials
(ex. chairs,
tables,
cabinets,
kitchen and
feeding
material,
washing
area, CR )
Renovation 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 300,000.00
of DCC
f. Core 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 1,500,000.
shelter(50 00
units per
year)
Child and
Youth
Welfare
Program
Training of 18,000.00 18,000.00 18,000.00 18,000.00 18,000.00 90,000.00
Child
Development
Workers
Municipal 24,000.00 24,000.00 24,000.00 24,000.00 24,000.00 120,000.00
Children
Congress
CDW 158,400.00 158,400.00 158,400.00 158,400.00 158,400.00 792,000.00
Honorarium
CDW 24,600.00 24,600.00 24,600.00 24,600.00 24,600.00 123,000.00
Clothing
allowance
Youth
Welfare
Program
Provision of 66,000.00 66,000.00 66,000.00 66,000.00 66,000.00 330,000.00
Sports
Materials and
Inter
barangay
Sports Fest
Youth 66,000.00 66,000.00 66,000.00 66,000.00 66,000.00 330,000.00
development
session
Women 0.00
Welfare
Program
Women 12,000.00 12,000.00 12,000.00 12,000.00 12,000.00 60,000.00
Congress
Senior
Citizen
Program
Provision of 37,500.00 37,500.00 75,000.00
ID and
Booklet
Honorarium 115,200.00 115,200.00 115,200.00 115,200.00 115,200.00 576,000.00
for OSCA
Chair and
Staff
Senior 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 250,000.00
Citizen Month
Celebration
Capability 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 300,000.00
skills training
Senior citizen 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 250,000.00
assembly
PWD
Program
Provision of 37,500.00 37,500.00 75,000.00
ID and
Booklet
PWD 24,000.00 24,000.00 24,000.00 24,000.00 24,000.00 120,000.00
Congress
Provision of 24,000.00 24,000.00 24,000.00 24,000.00 24,000.00 120,000.00
assistive
device
GAD
Program
Trainings 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 300,000.00
and Seminars
on Gender
sensitivity
awareness
Training on 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 300,000.00
HGDG
Conduct 60,000.00 60,000.00 60,000.00 60,000.00 60,000.00 300,000.00
training for
Barangay
VAWC
Officers
Award 110,000.00 110,000.00 110,000.00 110,000.00 110,000.00 550,000.00
System for
Best Family
TOTAL 4,133,20 1,378,20 1,453,20 1,378,20 1,378,20 9,721,00
SOCIAL 0.00 0.00 0.00 0.00 0.00 0.00
SERVICES
EDUCATION
Bayanihan
Classroom
Construction
Project 1,000,000. 1,000,000. 1,000,000. 1,000,00 4,000,000.
(BCCP) 00 00 00 0.00 00
Teachers
Review
Program
(TRP) during
vacation 200,000. 100,000. 100,000. 100,00 500,000.
(April-May) 00 00 00 0.00 00
Enhancing the 100,000. 150,000. 150,000. 200,00 600,000.
Performance 00 00 00 0.00 00
and
Participation
in the
Classroom
Oplan
Tutok
Basa
NAT
Review
Class
Zero
Dropout
Rate
TOTAL 1,300,000. 1,250,000. 1,250,000. 1,300,00 5,100,000.
EDUCATION 00 00 00 0.00 00
HEALTH
Maternal
Health
Program
Construction of 10,800,000.00 10,800,000.00
Health Facility
TOTAL 10,800,000.0 10,800,000.0
HEALTH 0 0
SOCIAL
SERVICES
Construction
of social
welfare
facilities
a. OSCA 320,000. 480,000. 640,000. 1,440,000.
building 00 00 00 00
b. PDAO 320,000. 480,000. 640,000. 1,440,000.
00 00 00 00
c. Women 320,000. 480,000. 640,000. 1,440,000.
center 00 00 00 00
d. Rehabilitation 400,000. 600,000. 800,000. 1,800,000.
center 1 UNIT 00 00 00 00
e. Evacuation
center with
complete 4,000,000. 6,000,000. 8,000,000. 18,000,000.
facilities 00 00 00 00
f. ECCD
w/complete
facilities and
materials (ex.
chairs, tables,
cabinets,
kitchen and
feeding
material,
washing area, 360,000. 540,000. 720,000. 1,620,000.
CR ) 00 00 00 00
Renovation of
DCC
f. Core 3,000,000. 4,500,000. 6,000,000. 13,500,000.
shelter(50 units 00 00 00 00
per year)
Child and
Youth Welfare
Program
CDW 792,000.00 792,000.00
Honorarium
PWD
Program
Provision of 240,000. 360,000. 480,000. 1,080,000.
assistive device 00 00 00 00
TOTAL
SOCIAL 8,960,000. 13,440,000. 17,920,000. 792,00 41,112,000.
SERVICES 00 00 00 0.00 00
To ensure sustainable peace & preserve cultural identity, the following priority
programs and projects shall be implemented:
Anti- Illegal Drugs Program. This program seeks to implement several anti-
illegal drugs projects such as the building of a complete rehabilitation facility for
drug-dependents who surrender, providing livelihood opportunities to former
drug-pushers and users, providing educational scholarships for children of drug-
dependents while they are rehabilitating and recovering and enrolment of drug-
dependents under ALS Program of the Department of Education. Through these
projects, the municipality will be in a good position to attain a 100% drug-free
community status at the end of the first three years of the planning period.
Anti-criminality Program. This program seeks to implement the Local Anti-
Criminality Action Plan (LACAP) on theft, robbery, cattle rustling and other
criminalities in the municipality. This shall include the allocation of monetary
rewarrds for intelligence reports. A construction of a PNP/BPAT/AFP Building near
the Municipal Hall and several outposts on strategic locations all over the 11
barangays is also targetted. It also aims to install CCTVs in all barangays.
Roads Safety Program. This involves the implementation of several projects
and activities that aim to reduce the occurrence of vehicular accidents and other
road safety related incidents by 80 % by the end of the first 3 years. Projects
such as: positioning of additional road signages, activation of Traffice
Management Unit (TMU), installation of street lights, installation of CCTVs and
traffic rules Trainings and Seminars to drivers are amongst the initial strategies
to be implemented.
In the next six years, it will oblige a total of P 42,000,000 million to realize these
programs and projects of which P 6,300,000.00 (15%) will be raised by the municipal
government and the balance of P 35,700,000.00 (85%) to be sourced from the
Regional Government of the Autonomous Region in Muslim Mindanao. These are
detailed in the tables below.
Table 10. PEACE & CULTURE INVESTMENT PROGRAMS FUNDED BY THE LGU,
2017-2022
The municipality shall prioritize four (4) clusters of programs and projects that
aim to sustain and speed up the economic development during the planning period. The
programs are as follows:
Support to Agriculture Development Program. This shall serve as the
flagship agricultural program that aims to enhance the productivity of the
locality. Projects and programs shall cover all families comprising the agricultural
subsector, who represent 90% of the total household population. This aims at
the construction of an irrigation system, provisions of pre and post harvest
facilities such as threshers, corn shellers, solar dryers, etc., establishment of NFA
buying station, government subsidy of agricultural inputs for every barangay,
training of farmers on modern farming system and technologies, provision of
large scale agricultural production of major crops, provision of food terminals and
bagsakan, establishment of organic farms, provision of livelihood programs such
as duck-raising, goat and cattle raising and the establishment of a halal slaughter
house.
Labor & Employment Development Program. To promote livelihood and
income-generating opportunities, the municipality will pursue the following
projects: provisions of skills enhancement training on pastry, soap, salted-egg
and dressmaking, tailoring and provisions of vocational scholarship programs. By
2020, all households shall have been covered by these projects, ensuring a
comfortable life for all families in all barangays.
Business Promotion Development Program. To enhance business and
enterprise development in the municipality, specific interventions for the business
and industry subsectors shall be pursued. These include the organization of
micro, small and medium enterprises, establishment of a Local Economic
Development Office, conduction of trade fairs, conduction of IEC on tax
awareness and conduction of Investors Forums or Business Forums.
Tourism Development Program. To ensure that a sustained growth and
development in the tourism subsector is promoted and achieved, the municipal
government will invest on the improvement and development of several potential
tourist spots like the Gen.Wood-Datu Utto Treaty Site, Minanga sa Bakat,
Lantaka a Pusaka, Kabalukan Hills Ecotourism Zone, Zapakan Memorial Shrine
and Cemetery and Maitum-a-ig Marine Forest Park Development, Establishment
of a Tourist Data Base System, delivery of Tourism Promotion Programs and
activities and establishment of a Tourism Office with complete facilities.
programs & projects. The Local Government Unit of Radjah Buayan shall provide P
Autonomous Region in Muslim Mindanao (ARMM) and P16, 400,000.00 (10.31%) from
the Provincial Government of Maguindanao. The tables that follow supplies the specific
details.
TOTAL
PROGRAMS/ LGU
PROJECTED COST (6 YEARS)
PROJECTS PROJECT
COSTS
2017 2018 2019 2020 2021 2022
A. Support to 1,350 350,0 350,0 350,0 350,0 3,250
Agricultural ,000.00 00.00 00.00 00.00 00.00 ,000.00
Development
Program
1. Construction of
Irrigation System
2. Provision of Pre
& Post Harvest
Facilities:
Thresher
(11
pieces)
Corn
Sheller
(11
pieces)
Solar
dryer (11
pieces)
Hand
Tractor
(11
pieces)
Floating
Tiller (11
pieces)
Harvester
(1 piece)
Farm
tractor (6
pieces)
3. Establishment
of NFA buying
station
4. Government
subsidy to
agricultural inputs
for every
barangay
5. Training of
farmers on
farming system
and technologies
6. Provision of
large scale
agricultural
production for
Rice and Corn
7. Provision of
food terminal
"Bagsakan" (for
infra sector)
8. Establishment
of Organic
Farming
9. Provision of
Livelihood
Programs:
9.1 Duck Raising
(100 heads/brgy)
9.2 Goat Raising
(50 heads/brgy)
9.3 Cattle raising
(15 heads/brgy)
9.4 Poultry Egg
Production
10. Establishment
of Halal Slaughter
House
B. Labor & 470,0 470,000. 470,000. 470,000 470,000 2,350,0
Employment - 00.00 00 00 .00 .00 00.00
Development
Program
1. Provisions of
Skills
Enhancement
Training:
-Pastry Making
-Soap Making
-Salted Egg
Making
-Dress Making
-Tailoring
2. Vocational
Scholarship
Program
C. Business 870 770,0 770,0 770,0 770,0 3,950
Promotion - ,000.00 00.00 00.00 00.00 00.00 ,000.00
Development
Program
1. Conduct IEC on
Tax awareness
2. Conduct
Investors' Forum /
Business Forum
3. Organization of
Micro, Small, &
Medium
Enterprises
4. Establishment
of Local Economic
Development
Office (LEIPO
Office)
5. Conduct Trade
Fair
D. Tourism 2, 1,12 1,12 1,02 1,02 6,
Development - 220,000 0,000 0,000 0,000 0,000 500,000
Program
1. Improvement &
Development of
Potential Tourist
Spots
-Gen. Wood -
Datu Utto Treaty
Site
-Minanga sa Bakat
-Lantaka a Pusaka
-Kabalukan Hills
Eco-Tourism Zone
-Zapakan
Memorial Shrine
and Cemetery
-Maitum-a-ig
Marine Forest Park
Development
2. Establishment
of Tourist Data
Base System
3. Establish
Delivery of
Tourism
Promotion
Programs &
Activities
4. Establishment
of Tourism Office
w/ complete
facilities
Total (per Year) 4,910,0 2,710,00 2,710,00 2,610,00 2,610,00
00.00 0.00 0.00 0.00 0.00
Total (for 3
Years) 7,620,000.00 7,930,000.00
Total (for 6 16,050,000.00
Years)
Table 13. ECONOMIC INVESTMENT PROGRAMS BY EXTERNAL SOURCES,
2017-2022
TOTAL
PROGRAMS/ EXTERNAL
PROJECTED COST
PROJECTS SOURCES
COSTS
OTHER
PROVINCE ARMM NATIONAL EXTERNAL
SOURCE
A. Support to
Agricultural 24,565,000 49,800,000. - 74,365,000.0
Development .00 00 0
Program
1. Construction of
Irrigation System
2. Provision of Pre
& Post Harvest
Facilities:
Thresher (11
pieces)
Corn Sheller (11
pieces)
Solar dryer (11
pieces)
Hand Tractor (11
pieces)
Floating Tiller
(11 pieces)
Harvester (1
piece)
Farm tractor (6
pieces)
3. Establishment of
NFA buying
station
4. Government
subsidy to
agricultural
inputs for every
barangay
5. Training of
farmers on
farming system
and technologies
6. Provision of large
scale agricultural
production for
Rice and Corn
7. Provision of food
terminal
"Bagsakan" (for
infra sector)
8. Establishment of
Organic Farming
9. Provision of
Livelihood
Programs:
9.1 Duck Raising
(100 heads/brgy)
9.2 Goat Raising
(50 heads/brgy)
9.3 Cattle raising
(15 heads/brgy)
9.4 Poultry Egg
Production
10. Establishment of
Halal Slaughter
House
B. Tourism 16,400, 22,000,000 - 68,700,0
Development 000.00 30,300,000 .00 00.00
Program .00
1. Improvement &
Development of
Potential Tourist
Spots
Gen. Wood -
Datu Utto Treaty
Site
Minanga sa
Bakat
Lantaka a Pusaka
Kabalukan Hills
Eco-Tourism
Zone
Zapakan
Memorial Shrine
and Cemetery
Maitum-a-ig
Marine Forest
Park
Development
2. Establishment of
Tourist Data
Base System
3. Establish
Delivery of
Tourism
Promotion
Programs &
Activities
4. Establishment of
Tourism Office
w/ complete
facilities
TOTAL 16,400,00 54,865,0 71,800,00 143,065,00
0.00 00.00 0.00 0.00
To heighten the economic vitality and livability of the municipality, the following
priority infrastructure programs and projects will be pursued over the next six years:
Maintenance and rehabilitation of Municipal Roads and Barangay FMRs
for 11 Barangays. This involves the maintenance and rehabilitation of the
municipal roads and the farm-to-market (FMR) roads in all eleven barangays.
These projects seek to enhance connectivity between the municipality and all
other key business neighboring municipalities in the aim of revitalizing the
economy by 50% during the first two years of the planning period.
Maintenance and rehabilitation of existing drainage canal. The project
aims for the total municipal-wide rehabilitation and maintenance of all existing
drainage canals as a strategy towards pollution and flood control.
Renovation of Barangay Health Stations. This involves the renovation of all
existing Barangay Health Stations (BHS) as this seeks to accelerate the delivery
of basic health services to the populace. It is expected that through these
projects, the municipality shall be meeting all the immediate medical needs of
the constituents by 90% more at the end of the first two planning years.
Renovation of Rural Health Unit. This project seeks to renovate the existing
Barangay Rural Health Unit and shall involve adding additional beds and
upgrading the knowledge and capacity of the health staff. This will put the RHU
in a better position to provide more health services to the low-income families of
Radjah Buayan.
Maintenance and Rehabilitation of existing water system. This seeks to
solve the problem of water-borne diseases and the lack of abundant potable
water that is being faced by the municipality. This involves the maintenance and
rehabilitation of existing water system and the possible upgrading of the water
facilities in all the 11 barangays.
Rehabilitation of dilapidated school building. This involves the progressive
rehabilitation of the existing school buildings with dilapidated conditions,
targeting all elementary and secondary schools. This should be able to raise the
percentage of the school’s participation rate by 90% in the first 3 years of the
planning years.
Road Concreting. This involves the concreting of key existing road networks in
the municipality, specifically the concreting of the Zapakan-Dapantis Road (6
km), Quiblah Road (1 Km), Baital-Dapantis Road (3.5 km), Baital-Sampao Road
(3 km) and Sampao-Dapantis Road (3 km). This will allow for adequate lanes for
public transport movement, putting a positive impact on the economy,
particularly the agriculture and business subsectors.
Road Opening. This involves the opening of the following roads: Pidsandawan-
Tabungao Road (4 km), Bakat-Tabungao Road (4.5 Km), Baital-Sampao Road (3
km) and the Sampao-Dapantis Road (3 km). With a combined length of 14.5
kilometers, these projects determine the optimal connectivity opportunities of
the municipality’s transport system, which is seen to raise the transport service
quality and the business viability, aiding in the road to sustainable growth and
development of the local economy.
TOTAL
PROGRAMS/ LGU
PROJECTED COST (6 YEARS)
PROJECTS PROJEC
T COSTS
2017 2018 2019 2020 2021 2022
I. Maintenance 15,000,0 15,000,0 15,000,0 15,000,00 15,000,0 15,000,0 90,000,000.
and 00.00 00.00 00.00 0.00 00.00 00.00 00
rehabilitation of
Municipal Roads
and Barangay
FMRs for 11
Barangays
II. Maintenance 1,000,00 1,000,00 1,000,00 1,000,000 1,000,00 1,000,00 6,000,000.0
and 0.00 0.00 0.00 .00 0.00 0.00 0
rehabilitation of
existing
drainage canal
III. Renovation 200,000. 200,000. 200,000. 200,000.0 200,000, 200,000. 1,200,000.0
of Barangay 00 00 00 0 00 00 0
Health Stations
IV. Renovation 200,000. 200,000. 200,000. 200,000.0 200,000. 200,000. 1,200,000.0
of Rural Health 00 00 00 0 00 00 0
Unit
V. Maintenance 300,000. 300,000. 300,000. 300,000.0 300,000. 300,000. 1,800,000.0
and 00 00 00 0 00 00 0
Rehabilitation of
existing water
system
VI. 300,000. 300,000. 300,000. 300,000.0 300,000. 300,000. 1,800,000.0
Rehabilitation of 00 00 00 0 00 00 0
dilapidated
school building
Total (per 17,000,0 17,000,0 17,000,0 17,000,00 17,000,0 17,000,0 102,000,000
Year) 00.00 00.00 00.00 0.00 00.00 00.00 .00
Total (for 3 51,000,000.00 51,000,000.00 102,000,0
Years) 00.00
Total (for 6 102,000,000.00
Years)
TOTAL
PROGRAMS/ EXTERNAL
PROJECTED COST
PROJECTS SOURCES
COSTS
OTHER
PROVINCE ARMM NATIONAL EXTERNALSO
URCE
I.Road Concreting
1. Concreting of 12,000,000.0 12,000,000.0
1km Quiblah Road 0 0
2. Concreting of 42,000,000.0 42,000,000.0
3.5k Baital-Dapantis 0 0
Road 36,000,000.0 36,000,000.0
3. Concreting of 0 0
3km Baital-Sampao 36,000,000.0 36,000,000.0
Road 0 0
4. Concreting of 72,000,000.0 72,000,000.0
3km Sampao- 0 0
Dapantis Road
5. Concreting of
6km Zapakan-
Dapantis Road
Finally, to ensure that the Municipal Government will continue to grow strong and mature as
a public institution, the following priority projects are lined up for implementation, which will require
a total of P 9,800,000.00 million to complete:
Local Legislation Program. This involves projects and activities that aim at
ensuring that the municipality is a more responsive local government
structure that implements effective and equal allocation of power,
responsibilities and resources amongst all its constituents. It is expected that
with these activities, the municipality shall be able to address all the problems
of its stakeholders, promote the general welfare of the citizens and fully
attain its vision by the end of the fourth year of the planning period.
Development Planning Program. This involves projects and activities
aimed at planning strong and effective development projects that are
realistic, viable and shall clearly reflect the overall thrust of the constituents.
These programs seek the furtherance of all the development agenda of the
municipality, particularly the prioritization of high-impact capital investment
projects, which are aligned with the national goals and priorities at the
beginning of the second year of the planning period.
Establishment of Functional Local Special Bodies Program. To be
pursued in partnership with Civil Society Groups (CSGs), Non-government
Organizations (NGOs), Council of Elders and local leaders, society
organizations, including the academe, this seeks to form functional local
special bodies to assist the municipal development team in ensuring that
policies are well coordinated and directions are uniformly-operated towards
sustainable peace and development from the beginning of the planning
period.
Fiscal Administration Program. This seeks to implement programs that
support the municipality in achieving a sustainable fiscal position through the
strengthening of its institutional and fiscal capacity, improving its tax
collection and the proper management of all fiscal operations beginning from
the first year of the planning period.
Creation of a Management Information system. To be pursued during
the first two years of the planning period, this seeks to create a Management
Information System that would contain a database of all the development
programs and activities of the municipality for the next planning years. This
will ensure that these plans are properly implemented and regular reports are
documented.
1,500,000.00 1,500,000.00
1. Local Legislation Program
The CDP, executed through the LDIP, will cost a total of P 986,048,000.00
million over the next 6 years. Of the total, the municipal government will assume
164,671,000 million (16.70%) using its budget, the provincial government, P
178,160,000.00 (18.07%), the ARMM government P 458,255,000.00 (46.50%), the
national government P 182,470,000 (18.51%), and the private sector and
International Non-Government Organizations (INGOs) the remaining P 2,092,000.00
(0.22%).
Grants &
Donations N/A N/A N/A N/A
Based on the above, the following are the municipality’s projected resources for
the planning period. Using the following conservative assumptions, Both local revenues
and internal revenues will grow by an average of 17% annually.
ITEM YEAR
2017 2018 2019 2020 2021 2022
PS
Less: Projected
Operating Expenses MOOE
Sub-Total
Less: Obligated Debt
Service
New Investment Potential
Conclusion
With conservative and minimal growth rate projection of the LGU, assuming that
local revenue assumption will not be realized and minimal support from higher LGUs
and the national government will be collected, the LGU is still in good position to
implement at least 50% of the prioritized sectoral programs and projects.
Annexes
Annex A: Projection of New Development Investment Financing Potential
Y0 Y1 Y2 Y3
1.0 Projected Total Revenues
Less
2.0 Projected Mandatory Expenditures
2.1 Personal Services
2.2 MOOE
2.3 Capital Outlay
2.4 Debt Service
2.5 Other Contractual Obligations
2.6 5% LDRRM Fund
Signed:
Date: _________________
Notes:
Item No. Description/ Source Document Responsible Person
Y0 Current Year Local Finance Committee
Y1 First Forecast Year – First Year After Current Year Local Finance Committee
Y2 Second Forecast Year – Second Year After Current Year Local Finance Committee
Y3 Third Forecast Year – Third Year After Current Year Local Finance Committee
1.0 Projected Total Revenues – Local Resource Mobilization Program, Row C. Grand Local Treasurer
Total
2.0 Projected Mandatory Expenditures = Personal Services (PS) (2.1) + Maintenance Local Finance Committee
and Other Operating Expenses (MOOE) (2.3) + Capital Outlay (CO) (2.3) + Debt
Service (2.4) + Other Contractual Obligations (2.5) + 5% Calamity Fund (2.6)
2.1 Personal Services (PS) – Forward Estimates Local Budget Officer
2.2 Maintenance and Other Operating Expenses (MOOE) – Forward Estimates Local Budget Officer
2.4 Debt Service – Summary of Medium-Term Debt and Non-Debt Contractual Local Treasurer
Obligations, Row A. Sub-total
2.5 Other Contractual Obligations – Summary of Medium-Term Debt and Non-Debt Local Treasurer
Contractual Obligations, Row B. Sub-total
2.6 5% Calamity Fund Local Budget Officer
3.0 New Development Investment Financing Potential = Total Revenues (1.0) – Local Planning Officer
Projected Mandatory Expenditures (2.0)
4.0 Internal Revenue Allotment (IRA) – Local Resource Mobilization Program, Row B.1 Local Treasurer
5.0 20% Local Development Fund (LDF) - 20% of IRA (4.0) Local Budget Officer
6.0 LDF Compliance Ratio = New Development Investment Financing Potential Local Finance Committee
(NDIFP) (3.0) / 20% Local Development Fund (5.0)
Annex B: Summary Medium-Term Financing Plan
Year 2019
Three:
Item No. Uses of Funds (B) / Amount A.1 A.2 A.3 A.4
Sources of Fund (A)
Own-Source Intergovernmental External Other
Revenues Fiscal Transfers Financing – Financing
National Options
Government, (e.g., Loans,
Other LGU, and PPPs, etc.)
Development
Partner
B.1 Current Operating 0.00
Expenses
(PS+MOOE+CO)
B.2 Debt Service and 0.00
Other Non-Debt
Contractual
Obligations
B.3 5% Calamity Fund 0.00
B.4 New Program, 0.00
Projects and
Activities (PPAs)
including 20%
Development Fund
B Total 0.00 0.00 0.00 0.00 0.00 0.00
Prepared by:
_______________________
Noted by:
_______________________ _________________________
Local Treasurer Local Budget Officer
Notes:
Item
Description / Source Lead Person
No.
A Sources of Funds = Own-Source Revenues (A.1) + Intergovernmental Fiscal Transfers (A.2) + External Local Finance
Financing (A.3) + Other Financing Options (A.4) Committee
A.1 Own-Source Revenues – Local Resource Mobilization Program, Row A, Sub-Total Local Treasurer
A.2 Intergovernmental Fiscal Transfers – Local Resource Mobilization Program, Row B, Sub-Total Local Treasurer
A.3 External Financing – Local Development Investment Program Local Planning Officer
A.4 Other Financing Options – Local Resource Mobilization Program, Row C, Sub-Total Local Treasurer
B Uses of Funds = Current Operating Expenses (B.1) + Debt Service and Other Non-Debt Contractual Local Finance
Obligation (B.2) + 5% Calamity Fund (B.3) + New Programs, Projects and Activities (PPAs) inclusive of Committee
20% Development Fund (B.4)
B.2 Debt Service and Other Non-Debt Contractual Obligations – Summary of Medium-Term Debt and Non- Local Treasurer
Debt Contractual Obligations, Grand Total
B.4 New Programs, Projects and Activities (PPAs) inclusive of 20% Development Fund Local Planning Officer
Annex C: Local Development Investment Program Summary
M&E STRATEGY
DATA SOURCE
TO ASSESS
PERFORMANCE
(Individual
TARGETS beneficiaries,
PERFORMANCE COLLECTION RESPONSIBILITY
RESULTS FOR groups of FREQUENCY
INDICATORS METHODS CENTER
INDICATORS beneficiaries,
organizations,
partners,
documents,
etc)
Goal/Impact (Long term) Mortality Rate Reduce LGU Health Document Every three Monitoring
of children Office review years Team
Reduce infant mortality Children aged under-five And at the
(MDG no.4) 1-5 mortality end of
(LGPMS rate by two- Nine years
outcome thirds by
Indicator) 2015 (MDG
Target no.4)
Objective/Outcome Every three Monitoring
(Medium term) years Team