Daily Observation Sheet

Sl. Checkpoint Remark

Ensure Pressurising Inlet Valve M3 or Any is Open. Normal


1
Operation / After Filling.

Ensure M5 or Any pressurised outlet valve is open. Normal


2
Operation / After Filling.

3 Ensure M1 or Any Lower filling Valve is closed.

4 Ensure M2 or Any Upper filling Valve is closed.

5 Ensure B1 or Any Gas Blow Valve is closed.

6 Ensure B2 or Any Overflow Liquid detect Valve is closed.

7 Ensure M6 PRV valve is middle vertical Position.

8 Ensure PV8 vent valve is closed.

9 Ensure M4 or any Liquid delivery valve is open.

10 Ensure Auxillary outlet valve is closed.

Ensure Tank Pressure to higher side by 2 Kg/cm2 with respect to


11
set pressure of PRV of Outlet line.

12 Donot operate PRV station inlet & outlet Valve is always Open.

13 Ensure drain valve is always closed of outlet line.

Ensure outlet line pressure is not more than 15 kg/cm2 &


14
minimum 4 Kg/cm2

15 Ensure Outlet line header valve is open if any mention in remark.

16 Ensure Dry Sand available in fire bucket.

17 Ensure availability of fire extinguisher in tank farm.

18 Ensure Gate is closed of Tank Premises.

19 Daily Available Level & Pressure of LIN LOX Tanks


Capacity & Details of Refilling for Cryogenic Tanks
Last Three Loading
Cryogenic Tank Details
Date : 09/03/2022

Sl. Tank Capacity Tank Level in mm Pressure in


WC Kg/cm2

1 Liquid Nitrogen Tank 6 KL 2000 7.5

Last Three Loading

Date : 23/11/2021

2 Liquid Oxygen Tank-1 6KL --


8760
3 Liquid Oxygen Tank -2 6KL --
ing for Cryogenic Tanks
Last Three Loading Details

Date : 07/03/2022 Date : 05/03/2022

Tank Level in Pressure in Tank Level in mm Pressure in


mm WC Kg/cm2 WC Kg/cm2

2000 9.5 2000 6

Last Three Loading Details

Date : 11/01/2022 --

-- -- -- --

5140 -- -- --