Professional Documents
Culture Documents
-
////////////////////////////// JUNE 2018 ////////////////////////////////////////
-----------------------------------------------------------------------------------
-
02 Jun 2018 C 12.4 0.10m3 water evaporated from waste oil sett. tank
Waste Oil Sett. Tank- 0.23m3/0.13 retained
1/E. Jun. 2018
02 Jun 2018 C 12.2 0.19m3 sludge transferred from Bilge oil tank
to Waste Oil sett. Tank
Bilge Oil Tank- 4.91m3/4.72m3 retained
Waste Oil Sett. Tank- 0.13m3/0.32m3 retained
1/E R.G.Velez Jr. 02 Jun 2018
------------------------------------------------------------------------
03 Jun 2018 D 13.0 0.12m3 bilge water from E/R bilge Wells
14.0 0800H-0812H
15.3 To Bilge Tank, 0.79m3/0.91m3 retained
1/E R.G.Velez Jr. 03 Jun 2018
03 Jun 2018 C 12.4 0.12m3 water evaporated from waste oil sett. tank
Waste Oil Sett. Tank- 0.32m3/0.20 retained
1/E R.G.Velez Jr. 03 Jun 2018
03 Jun 2018 C 12.2 0.14m3 sludge transferred from Bilge oil tank
to Waste Oil sett. Tank
Bilge Oil Tank- 4.74m3/4.60m3 retained
Waste Oil Sett. Tank- 0.20m3/0.34m3 retained
1/E R.G.Velez Jr. 03 Jun 2018
------------------------------------------------------------------------
04 Jun 2018 C 12.2 0.07m3 sludge transferred from F.O Drain tank
to Bilge Oil Tank
F.O. Drain Tank- 0.18m3/0.11m3 retained
Bilge Oil Tank- 4.60m3/4.67m3 retained
1/E R.G.Velez Jr 04 Jun 2018
----------------------------------------------------------------------------
05 Jun 2018 C 12.4 0.11m3 water evaporated from waste oil sett. tank
Waste Oil Sett. Tank- 0.34m3/0.23
1/E R.G.Velez Jr. 05 Jun 2018
05 Jun 2018 C 12.3 0.10m3 Sludge from waste oil settling Tank
Burned in Incinerator for 5.0 hours
Waste Oil Sett. Tank 0.23m3/0.13m3
8 O2 Content 10 %
9 Furnace Temp.= 910 'C
1/E R.G.Velez Jr. 05 Jun 2018
05 Jun 2018 C 12.2 0.21m3 sludge transferred from Bilge oil tank
to Waste Oil sett. Tank
Bilge Oil Tank- 4.67m3/4.46m3
Waste Oil Sett. Tank- 0.13m3/0.34m3
1/E R.G.Velez Jr. 05 Jun 2018
05 Jun 2018 D 13.0 0.14m3 bilge water from E/R bilge Wells
14.0 1000H-1015H
15.3 To Bilge Tank, 0.91m3/1.05m3
1/E R.G.Velez Jr. 05 Jun 2018
-------------------------------------------------------------------------------
06 Jun 2018 C 12.4 0.12m3 water evaporated from waste oil sett. tank
Waste Oil Sett. Tank- 0.34m3/0.22
1/E R.G.Velez Jr. 06 Jun 2018
06 Jun 2018 C 12.3 0.17m3 Sludge from waste oil settling Tank
Burned in Incinerator for 9.0 hours
Waste Oil Sett. Tank 0.22m3/0.05m3
8 O2 Content 10 %
9 Furnace Temp.= 911 'C
1/E R.G.Velez Jr. 06 Jun 2018
06 Jun 2018 C 12.2 0.27m3 sludge transferred from Bilge oil tank
to Waste Oil sett. Tank
Bilge Oil Tank- 4.46m3/4.19m3
Waste Oil Sett. Tank- 0.05m3/0.32m3
1/E R.G.Velez Jr. 06 Jun 2018
---------------------------------------------------------------------------------
07 Jun 2018 C 12.2 0.14m3 sludge transferred from L.O sludge tank
to Bilge Oil Tank
L.O. Sludge Tank- 0.23m3/0.09m3 retained
Bilge Oil Tank- 4.19m3/4.33m3 retained
1/E R.G.Velez Jr 07 Jun 2018
07 Jun 2018 C 12.2 0.16m3 sludge transferred from F.O sludge tank
to Bilge Oil Tank
F.O. Sludge Tank- 0.33m3/0.17m3 retained
Bilge Oil Tank- 4.33m3/4.49m3 retained
1/E R.G.Velez Jr 07 Jun 2018
07 Jun 2018 PART III-B 5 0615H-Changed-over fuel of M/E from MF-180 sulfur 3.06 %
to LSMGO sulfur:0.11%
Posn: Lat: 33-32.3'N Lon:121-30.1'E
DO SERV-3.0m3/DO SETT-2.5m3
----------------------------------------------------------------------------------
08 Jun 2018 C 12.4 0.13m3 water evaporated from waste oil sett. tank
Waste Oil Sett. Tank- 0.32m3/0.19
1/E R.G.Velez Jr. 08 Jun 2018
08 Jun 2018 C 12.2 0.14m3 sludge transferred from Bilge oil tank
to Waste Oil sett. Tank
Bilge Oil Tank- 4.49m3/4.35m3
Waste Oil Sett. Tank- 0.19m3/0.33m3
1/E R.G.Velez Jr. 08 Jun 2018
-------------------------------------------------------------------------------
09 Jun 2018 D 13.0 0.12m3 bilge water from E/R bilge Wells
14.0 1000H-1012H
15.3 To Bilge Tank, 1.05m3/1.17m3
1/E R.G.Velez Jr. 09 Jun 2018
09 Jun 2018 C 12.4 0.15m3 water evaporated from waste oil sett. tank
Waste Oil Sett. Tank- 0.33m3/0.18m3
1/E R.G.Velez Jr. 08 Jun 2018
09 Jun 2018 C 11.1 FO SLUDGE TANK
11.2 0.78m3
11.3 0.17m3
09 Jun 2018 PART III-B 5 1150H-Changed-over fuel of Aux. Boiler from MF-180
sulfur 3.06 % to LSMGO sulfur:0.11%
Posn: Lat: 30-34.8' N Lon:121-14.6' E
DO SERV-2.70m3/DO SETT-2.10m3
-----------------------------------------------------------------------------------
-
10 Jun 2018 PART III-B 5 1000H-Changed-over fuel of M/E & Aux. Boiler from LSMGO
sulfur:0.11% to MF-180 sulfur 3.06 %
Posn: Lat: 30-32.8' N Lon:121-12.5' E
DO SERV-2.80m3/DO SETT-2.20m3
10 Jun 2018 D 13.0 0.22m3 bilge water from E/R bilge Wells
14.0 1700H-1720H
15.3 To Bilge Tank, 1.17m3/1.39m3
1/E R.G.Velez Jr. 10 Jun 2018
-----------------------------------------------------------------------------------
--
11 Jun 2018 C 12.3 0.13m3 Sludge from waste oil settling Tank
Burned in Incinerator for 7.0 hours
Waste Oil Sett. Tank 0.18m3/0.05m3
8 O2 Content 10 %
9 Furnace Temp.= 909 'C
1/E R.G.Velez Jr. 11 Jun 2018
11 Jun 2018 C 12.2 0.28m3 sludge transferred from Bilge oil tank
to Waste Oil sett. Tank
Bilge Oil Tank- 4.37m3/4.09m3
Waste Oil Sett. Tank- 0.05m3/0.33m3
1/E R.G.Velez Jr. 11 Jun 2018
-----------------------------------------------------------------------------------
----
13 Jun 2018 D 13.0 0.10m3 bilge water from E/R bilge Wells
14.0 1600H-1610H
15.3 To Bilge Tank, 0.30m3/0.40m3
1/E R.G.Velez Jr. 13 Jun 2018
-----------------------------------------------------------------------------------
---
15 Jun 2018 C 12.2 0.10m3 sludge transferred from L.O sludge tank
to Bilge Oil Tank
L.O. Sludge Tank- 0.22m3/0.12m3 retained
Bilge Oil Tank- 4.09m3/4.19m3 retained
1/E R.G.Velez Jr 15 Jun 2018
15 Jun 2018 D 13.0 0.28m3 bilge water from E/R bilge Wells
14.0 1800H-1823H
15.3 To Bilge Tank, 0.40m3/0.68m3
1/E R.G.Velez Jr. 15 Jun 2018
-----------------------------------------------------------------------------------
16 Jun 2018 C 12.4 0.15m3 water evaporated from waste oil sett. tank
Waste Oil Sett. Tank- 0.33m3/0.18m3
1/E R.G.Velez Jr. 16 Jun 2018
----------------------------------------------------------------------------------
18 Jun 2018 C 12.2 0.10m3 sludge transferred from L.O. sludge tank
to Waste Oil Sett.Tank
L.O. Sludge Tank- 0.21m3/0.11m3 retained
Waste Oil Sett.Tank- 0.18m3/0.28m3 retained
1/E R.G.Velez Jr 18 Jun 2018
18 Jun 2018 D 13.0 0.25m3 bilge water from E/R bilge Wells
14.0 0730H-0753H
15.3 To Bilge Tank, 0.68m3/0.93m3
1/E R.G.Velez Jr. 18 Jun 2018
----------------------------------------------------------------------------------
19 Jun 2018 C 12.4 0.08m3 water evaporated from waste oil sett. tank
Waste Oil Sett. Tank- 0.28m3/0.20m3
1/E R.G.Velez Jr. 19 Jun 2018
19 Jun 2018 C 12.3 0.15m3 Sludge from waste oil settling Tank
Burned in Incinerator for 8.0 hours
Waste Oil Sett. Tank 0.20m3/0.05m3
8 O2 Content 10 %
9 Furnace Temp.= 910 'C
1/E R.G.Velez Jr. 19 Jun 2018
----------------------------------------------------------------------------------
20 Jun 2018 C 12.2 0.27m3 sludge transferred from Bilge oil tank
to Waste Oil sett. Tank
Bilge Oil Tank- 4.19m3/3.92m3
Waste Oil Sett. Tank- 0.05m3/0.32m3
1/E R.G.Velez Jr. 20 Jun 2018
20 Jun 2018 C 12.2 0.10m3 sludge transferred from F.O sludge tank
to Bilge Oil Tank
F.O. Sludge Tank- 0.28m3/0.18m3 retained
Bilge Oil Tank- 3.92m3/4.02m3 retained
1/E R.G.Velez Jr 20 Jun 2018
-----------------------------------------------------------------------------------
-
22 Jun 2018 C 12.4 0.13m3 water evaporated from waste oil sett. tank
Waste Oil Sett. Tank- 0.32m3/0.19m3
1/E R.G.Velez Jr. 22 Jun 2018
-----------------------------------------------------------------------------------
-
23 Jun 2018 D 13.0 0.10m3 bilge water from E/R bilge Wells
14.0 0530H-0540H
15.3 To Bilge Tank, 0.93m3/1.03m3
1/E R.G.Velez Jr. 23 Jun 2018
23 Jun 2018 C 12.2 0.14m3 sludge transferred from Bilge oil tank
to Waste Oil sett. Tank
Bilge Oil Tank- 4.02m3/3.88m3
Waste Oil Sett. Tank- 0.19m3/0.33m3
1/E R.G.Velez Jr. 23 Jun 2018
-----------------------------------------------------------------------------------
24 Jun 2018 C 12.4 0.12m3 water evaporated from waste oil sett. tank
Waste Oil Sett. Tank- 0.33m3/0.21m3
1/E R.G.Velez Jr. 24 Jun 2018
24 Jun 2018 C 12.3 0.15m3 Sludge from waste oil settling Tank
Burned in Incinerator for 8.0 hours
Waste Oil Sett. Tank 0.21m3/0.06m3
8 O2 Content 10 %
9 Furnace Temp.= 908 'C
1/E R.G.Velez Jr. 24 Jun 2018
24 Jun 2018 C 12.2 0.27m3 sludge transferred from Bilge oil tank
to Waste Oil sett. Tank
Bilge Oil Tank- 3.90m3/3.63m3
Waste Oil Sett. Tank- 0.06m3/0.33m3
1/E R.G.Velez Jr. 24 Jun 2018
-----------------------------------------------------------------------------------
25 Jun 2018 C 12.2 0.15m3 sludge transferred from L.O sludge tank
to Bilge Oil Tank
L.O. Sludge Tank- 0.24m3/0.09m3 retained
Bilge Oil Tank- 3.63m3/3.78m3 retained
1/E R.G.Velez Jr 25 Jun 2018
25 Jun 2018 C 12.2 0.18m3 sludge transferred from F.O sludge tank
to Bilge Oil Tank
F.O. Sludge Tank- 0.34m3/0.16m3 retained
Bilge Oil Tank- 3.78m3/3.96m3 retained
1/E R.G.Velez Jr 25 Jun 2018
---------------------------------------------------------------------------------
26 Jun 2018 C 12.2 0.08m3 sludge transferred from F.O Drain tank
to Bilge Oil Tank
F.O. Drain Tank- 0.13m3/0.05m3 retained
Bilge Oil Tank- 3.96m3/4.04m3 retained
1/E R.G.Velez Jr 26 Jun 2018
26 Jun 2018 C 12.4 0.11m3 water evaporated from waste oil sett. tank
Waste Oil Sett. Tank- 0.33m3/0.22m3
1/E R.G.Velez Jr. 26 Jun 2018
26 Jun 2018 C 12.2 0.10m3 sludge transferred from Bilge oil tank
to Waste Oil sett. Tank
Bilge Oil Tank- 4.04m3/3.94m3
Waste Oil Sett. Tank- 0.22m3/0.32m3
1/E R.G.Velez Jr. 26 Jun 2018
26 Jun 2018 PART III-B 5 1710H-Changed-over fuel of M/E from MF-180 sulfur 3.06 %
to LSMGO sulfur:0.11%
Posn: Lat: 25-16.2' N Lon:119-49.5' E
DO SERV-2.30m3/DO SETT-2.40m3
---------------------------------------------------------------------------------
28 Jun 2018 C 12.4 0.12m3 water evaporated from waste oil sett. tank
Waste Oil Sett. Tank- 0.32m3/0.20m3
1/E R.G.Velez Jr. 28 Jun 2018
28 Jun 2018 PART III-B 5 0910H-Changed-over fuel of Aux. Boiler from MF-180
sulfur 3.06 % to LSMGO sulfur:0.11%
Posn: Lat: 25-20.4' N Lon:119-25.1' E
DO SERV-3.00m3/DO SETT-1.60m3
1/E R.G. Velez Jr. 28 Jun 2018
28 Jun 2018 D 13.0 0.28m3 bilge water from E/R bilge Wells
14.0 0730H-0753H
15.3 To Bilge Tank, 1.03m3/1.31m3
1/E R.G.Velez Jr. 28 Jun 2018
---------------------------------------------------------------------------------
29 Jun 2018 PART III-B 5 1740H-Changed-over fuel of M/E & Aux. Boiler from LSMGO
sulfur:0.11% to MF-180 sulfur 3.06 %
Posn: Lat: 25-16.7' N Lon:119-38.7' E
DO SERV-2.40m3/DO SETT-2.30m3
--------------------------------------------------------------------------------
30 Jun 2018 C 11.1 FO SLUDGE TANK
11.2 0.78m3
11.3 0.23m3
30 Jun 2018 C 12.3 0.15m3 Sludge from waste oil settling Tank
Burned in Incinerator for 8.0 hours
Waste Oil Sett. Tank 0.20m3/0.05m3
8 O2 Content 10 %
9 Furnace Temp.= 908 'C
1/E R.G.Velez Jr. 30 Jun 2018
30 Jun 2018 C 12.2 0.28m3 sludge transferred from Bilge oil tank
to Waste Oil sett. Tank
Bilge Oil Tank- 3.94m3/3.66m3
Waste Oil Sett. Tank- 0.05m3/0.33m3
1/E R.G.Velez Jr. 30 Jun 2018
----------------------------------------------------------------------------------
---------------------------- JULY 2018 -------------------------------------------
----------------------------------------------------------------------------------
01 July 2018 C 12.4 0.11m3 water evaporated from waste oil sett. tank
Waste Oil Sett. Tank- 0.33m3/0.22m3
1/E R.G.Velez Jr. 01 July 2018
01 July 2018 C 12.2 0.10m3 sludge transferred from Bilge oil tank
to Waste Oil sett. Tank
Bilge Oil Tank- 3.66m3/3.56m3
Waste Oil Sett. Tank- 0.22m3/0.32m3
1/E R.G.Velez Jr. 01 July 2018
-----------------------------------------------------------------------------------
02 July 2018 C 12.2 0.10m3 sludge transferred from L.O sludge tank
to Bilge Oil Tank
L.O. Sludge Tank- 0.20m3/0.10m3 retained
Bilge Oil Tank- 3.56m3/3.66m3 retained
1/E R.G.Velez Jr 02 July 2018
02 July 2018 C 12.2 0.15m3 sludge transferred from F.O sludge tank
to Bilge Oil Tank
F.O. Sludge Tank- 0.25m3/0.10m3 retained
Bilge Oil Tank- 3.66m3/3.81m3 retained
1/E R.G.Velez Jr 02 July 2018
-----------------------------------------------------------------------------------
03 July 2018 C 12.2 0.19m3 sludge transferred from F.O Drain tank
to Bilge Oil Tank
F.O. Drain Tank- 0.20m3/0.01m3 retained
Bilge Oil Tank- 3.81m3/4.00m3 retained
1/E R.G.Velez Jr 03 July 2018
03 July 2018 C 12.4 0.07m3 water evaporated from waste oil sett. tank
Waste Oil Sett. Tank- 0.32m3/0.25m3
1/E R.G.Velez Jr. 03 July 2018
03 July 2018 C 12.2 0.18m3 sludge transferred from L.O. Drain tank
to Bilge Oil Tank
L.O. Drain Tank- 0.19m3/0.01m3 retained
Bilge Oil Tank- 4.00m3/4.18m3 retained
1/E R.G.Velez Jr 03 July 2018
03 July 2018 C 12.2 0.25m3 sludge transferred from waste oil sett. tank
to Bilge Oil Tank
waste oil sett. tank- 0.25m3/0.00m3 retained
Bilge Oil Tank- 4.18m3/4.43m3 retained
1/E R.G.Velez Jr 03 July 2018
03 July 2018 C 12.2 0.22m3 sludge transferred from L.O sludge tank
to Bilge Oil Tank
L.O. Sludge Tank- 0.23m3/0.01m3 retained
Bilge Oil Tank- 4.43m3/4.65m3 retained
1/E R.G.Velez Jr 03 July 2018
03 July 2018 C 12.2 0.34m3 sludge transferred from F.O sludge tank
to Bilge Oil Tank
F.O. Sludge Tank- 0.35m3/0.01m3 retained
Bilge Oil Tank- 4.65m3/4.99m3 retained
1/E R.G.Velez Jr 03 July 2018
-----------------------------------------------------------------------------------
04 July 2018 C 12.1 7.36m3 sludge disposal from Bilge Oil Tank
to Sludge Barge at N3 anchorage, Busan Korea
M.E. L.O. Sett. Tank- 2.37m3
Bilge Oil Tank- 4.99m3/0.00m3 retained
Name of Vessel- Ocean No.3
1/E R.G.Velez Jr 04 July 2018
------------------------------------------------------------------------------
07 July 2018 C 11.1 FO SLUDGE TANK
11.2 0.78m3
11.3 0.15m3
-----------------------------------------------------------------------------
10 July 2018 D 13.0 0.11m3 bilge water from E/R bilge Wells
14.0 0930H-0940H
15.3 To Bilge Tank, 1.43m3/1.54m3
1/E R.G.Velez Jr. 10 July 2018
----------------------------------------------------------------------------
14 July 2018 C 11.1 FO SLUDGE TANK
11.2 0.78m3
11.3 0.20m3
-------------------------------------------------------------------
18 July 2018 D 13.0 0.12m3 bilge water from E/R bilge Wells
14.0 0840H-0850H
15.3 To Bilge Tank, 1.54m3/1.66m3
1/E R.G.Velez Jr. 18 July 2018
-------------------------------------------------------------------
21 July 2018 D 13.0 0.10m3 bilge water from E/R bilge Wells
14.0 0545H-0554H
15.3 To Bilge Tank, 1.66m3/1.76m3
1/E R.G.Velez Jr. 21 July 2018
21 July 2018 C 12.2 0.14m3 sludge transferred from L.O sludge tank
to Bilge Oil Tank
L.O. Sludge Tank- 0.20m3/0.06m3 retained
Bilge Oil Tank- 0.00m3/0.14m3 retained
1/E R.G.Velez Jr 21 July 2018
21 July 2018 C 12.2 0.18m3 sludge transferred from F.O sludge tank
to Bilge Oil Tank
F.O. Sludge Tank- 0.28m3/0.10m3 retained
Bilge Oil Tank- 0.14m3/0.32m3 retained
1/E R.G.Velez Jr 21 July 2018
---------------------------------------------------------------------------
26 July 2018 D 13 1.46m3 Bilge Water from Bilge Tank
Bilge Tank 1.76m3/0.30m3 retained
26 July 2018 C 12.2 0.38m3 sludge transferred from F.O sludge tank
to Bilge Oil Tank
F.O. Sludge Tank- 0.46m3/0.08m3 retained
Bilge Oil Tank- 0.32m3/0.70m3 retained
1/E R.G.Velez Jr 26 July 2018
---------------------------------------------------------------------------
27 July 2018 C 12.2 0.12m3 sludge transferred from L.O sludge tank
to Bilge Oil Tank
L.O. Sludge Tank- 0.28m3/0.16m3 retained
Bilge Oil Tank- 0.70m3/0.82m3 retained
1/E R.G.Velez Jr 27 July 2018
27 July 2018 C 12.2 0.42m3 sludge transferred from F.O sludge tank
to Bilge Oil Tank
F.O. Sludge Tank- 0.56m3/0.14m3 retained
Bilge Oil Tank- 0.82m3/1.24m3 retained
1/E R.G.Velez Jr 27 July 2018
27 July 2018 C 12.2 0.12m3 sludge transferred from F.O drain tank
to Bilge Oil Tank
F.O. Drain Tank- 0.20m3/0.08m3 retained
Bilge Oil Tank- 1.24m3/1.36m3 retained
1/E R.G.Velez Jr 27 July 2018
27 July 2018 C 12.2 0.10m3 sludge transferred from Bilge Oil Tank
to Waste oil sett. tank
waste oil sett. tank- 0.00m3/0.10m3 retained
Bilge Oil Tank- 1.36m3/1.26m3 retained
1/E R.G.Velez Jr 27 July 2018
27 July 2018 D 13.0 0.10m3 bilge water from E/R bilge Wells
14.0 0445H-0454H
15.3 To Bilge Tank, 0.30m3/0.40m3
1/E R.G.Velez Jr. 27 July 2018
27 July 2018 PART III-B 5 2230H-Changed-over fuel of M/E from MF-180 sulfur 3.06 %
to LSMGO sulfur:0.11%
Posn: Lat: 25-18.9' N Lon:119-57.7' E
DO SERV-2.20m3/DO SETT-2.35m3
-------------------------------------------------------------------
28 July 2018 C 12.4 0.08m3 water evaporated from waste oil sett. tank
Waste Oil Sett. Tank- 0.10m3/0.02m3
1/E R.G.Velez Jr. 28 July 2018
----------------------------------------------------------------------
30 July 2018 C 12.2 0.10m3 sludge transferred from L.O sludge tank
to Bilge Oil Tank
L.O. Sludge Tank- 0.22m3/0.12m3 retained
Bilge Oil Tank- 1.26m3/1.36m3 retained
1/E R.G.Velez Jr 30 July 2018
30 July 2018 PART III-B 5 1040H-Changed-over fuel of Aux. Boiler from MF-180
sulfur 3.06 % to LSMGO sulfur:0.11%
Posn: Lat: 25-20.1' N Lon:119-25.4' E
DO SERV-3.00m3/DO SETT-2.05m3
-----------------------------------------------------------------------
31 July 2018 C 12.2 0.20m3 sludge transferred from Bilge Oil Tank
to Waste oil sett. tank
waste oil sett. tank- 0.02m3/0.22m3 retained
Bilge Oil Tank- 1.36m3/1.16m3 retained
1/E R.G.Velez Jr 31 July 2018
31 July 2018 PART III-B 5 1700H-Changed-over fuel of M/E & Aux. Boiler from LSMGO
sulfur:0.11% to MF-180 sulfur 3.06 %
Posn: Lat: 25-19.2' N Lon:119-29.8' E
DO SERV-2.60m3/DO SETT-2.10m3
----------------------------------------------------------------------------
============================= AUGUST 2018 ================================
02 AUG 2018 C 12.4 0.19m3 water evaporated from waste oil sett. tank
Waste Oil Sett. Tank- 0.22m3/0.03m3
1/E R.G.Velez Jr. 02 AUG 2018
02 AUG 2018 C 12.2 0.11m3 sludge transferred from L.O sludge tank
to Bilge Oil Tank
L.O. Sludge Tank- 0.18m3/0.07m3 retained
Bilge Oil Tank- 1.16m3/1.27m3 retained
1/E R.G.Velez Jr 02 AUG 2018
02 AUG 2018 C 12.2 0.14m3 sludge transferred from F.O sludge tank
to Bilge Oil Tank
F.O. Sludge Tank- 0.38m3/0.24m3 retained
Bilge Oil Tank- 1.27m3/1.41m3 retained
1/E R.G.Velez Jr 02 AUG 2018
--------------------------------------------------------------------------------
03 AUG 2018 C 12.2 0.15m3 sludge transferred from Bilge Oil Tank
to Waste oil sett. tank
waste oil sett. tank- 0.03m3/0.18m3 retained
Bilge Oil Tank- 1.41m3/1.26m3 retained
1/E R.G.Velez Jr 03 AUG 2018
--------------------------------------------------------------------------------
04 AUG 2018 C 11.1 FO SLUDGE TANK
11.2 0.78m3
11.3 0.35m3
06 AUG 2018 D 13.0 0.11m3 bilge water from E/R bilge Wells
14.0 0645H-0657H
15.3 To Bilge Tank, 0.54m3/0.65m3
1/E R.G.Velez Jr. 06 AUG 2018
----------------------------------------------------------------------------------
07 AUG 2018 C 12.2 0.26m3 sludge transferred from L.O sludge tank
to Bilge Oil Tank
L.O. Sludge Tank- 0.37m3/0.11m3 retained
Bilge Oil Tank- 1.33m3/1.59m3 retained
1/E R.G.Velez Jr 07 AUG 2018
07 AUG 2018 C 12.2 0.17m3 sludge transferred from F.O sludge tank
to Bilge Oil Tank
F.O. Sludge Tank- 0.49m3/0.32m3 retained
Bilge Oil Tank- 1.59m3/1.76m3 retained
1/E R.G.Velez Jr 07 AUG 2018
07 AUG 2018 C 12.4 0.03m3 water evaporated from waste oil sett. tank
Waste Oil Sett. Tank- 0.18m3/0.15m3
1/E R.G.Velez Jr. 07 AUG 2018
07 AUG 2018 C 12.3 0.10m3 Sludge from waste oil settling Tank
Burned in Incinerator for 6.0 hours
Waste Oil Sett. Tank 0.15m3/0.05m3
8 O2 Content 10 %
9 Furnace Temp.= 907 'C
1/E R.G.Velez Jr. 07 AUG 2018
07 AUG 2018 C 12.2 0.23m3 sludge transferred from Bilge Oil Tank
to Waste oil sett. tank
waste oil sett. tank- 0.05m3/0.28m3 retained
Bilge Oil Tank- 1.76m3/1.53m3 retained
1/E R.G.Velez Jr 07 AUG 2018
07 AUG 2018 PART III-B 5 2300H-Changed-over fuel of M/E from MF-180 sulfur 3.06 %
to LSMGO sulfur:0.11%
Posn: Lat: 34-51.2' N Lon:120-03.6' E
DO SERV-3.20m3/DO SETT-2.10m3
----------------------------------------------------------------------------------
08 AUG 2018 PART III-B 5 0425H-Changed-over fuel of Aux. Boiler from MF-180
sulfur 3.06 % to LSMGO sulfur:0.11%
Posn: Lat: 34-48.6' N Lon:119-43.9' E
DO SERV-2.50m3/DO SETT-2.10m3
----------------------------------------------------------------------------------
09 AUG 2018 PART III-B 5 0930H-Changed-over fuel of M/E & Aux. Boiler from LSMGO
sulfur:0.11% to MF-180 sulfur 3.06 %
Posn: Lat: 34-45.3' N Lon:119-33.1' E
DO SERV-2.80m3/DO SETT-2.10m3
09 AUG 2018 D 13.0 0.16m3 bilge water from E/R bilge Wells
14.0 0700H-0715H
15.3 To Bilge Tank, 0.65m3/0.81m3
1/E R.G.Velez Jr. 09 AUG 2018
-----------------------------------------------------------
10 AUG 2018 D 13 0.51m3 Bilge Water from Bilge Tank
Bilge Tank 0.81m3/0.30m3 retained
10 AUG 2018 C 12.2 0.10m3 sludge transferred from F.O drain tank
to Bilge Oil Tank
F.O. drain Tank- 0.20m3/0.10m3 retained
Bilge Oil Tank- 1.53m3/1.63m3 retained
1/E R.G.Velez Jr 10 AUG 2018
10 AUG 2018 C 12.2 0.20m3 sludge transferred from L.O sludge tank
to Bilge Oil Tank
L.O. Sludge Tank- 0.33m3/0.13m3 retained
Bilge Oil Tank- 1.63m3/1.83m3 retained
1/E R.G.Velez Jr 10 AUG 2018
10 AUG 2018 C 12.2 0.11m3 sludge transferred from F.O sludge tank
to Bilge Oil Tank
F.O. Sludge Tank- 0.42m3/0.31m3 retained
Bilge Oil Tank- 1.83m3/1.94m3 retained
1/E R.G.Velez Jr 10 AUG 2018
----------------------------------------------------------------------
11 AUG 2018 C 12.4 0.19m3 water evaporated from waste oil sett. tank
Waste Oil Sett. Tank- 0.28m3/0.09m3
1/E R.G.Velez Jr. 11 AUG 2018
-----------------------------------------------------------------------------------
---
13 AUG 2018 C 12.2 0.22m3 sludge transferred from L.O sludge tank
to Bilge Oil Tank
L.O. Sludge Tank- 0.28m3/0.06m3 retained
Bilge Oil Tank- 1.94m3/2.16m3 retained
1/E R.G.Velez Jr 13 AUG 2018
13 AUG 2018 C 12.2 0.49m3 sludge transferred from F.O sludge tank
to Bilge Oil Tank
F.O. Sludge Tank- 0.53m3/0.04m3 retained
Bilge Oil Tank- 2.16m3/2.65m3 retained
1/E R.G.Velez Jr 13 AUG 2018
13 AUG 2018 C 12.2 0.17m3 sludge transferred from F.O drain tank
to Bilge Oil Tank
F.O. drain Tank- 0.20m3/0.03m3 retained
Bilge Oil Tank- 2.65m3/2.82m3 retained
1/E R.G.Velez Jr 13 AUG 2018
13 AUG 2018 C 12.2 0.09m3 sludge transferred from Waste oil sett. tank
to Bilge Oil Tank
Waste oil sett. tank- 0.09m3/0.00m3 retained
Bilge Oil Tank- 2.82m3/2.91m3 retained
1/E R.G.Velez Jr 13 AUG 2018
13 AUG 2018 D 13.0 1.80m3 bilge water from E/R bilge Wells
14.0 0830H-1045H
15.3 To Bilge Tank, 0.30m3/2.10m3
1/E R.G.Velez Jr. 13 AUG 2018
-----------------------------------------------------------------------------------
--
14 AUG 2018 C 12.2 0.30m3 sludge transferred from F.O sludge tank
to Bilge Oil Tank
F.O. Sludge Tank- 0.38m3/0.08m3 retained
Bilge Oil Tank- 2.91m3/3.21m3 retained
1/E R.G.Velez Jr 14 AUG 2018
---------------------------------------------------------------------------------
16 AUG 2018 D 13.0 1.40m3 bilge water from E/R bilge Wells
14.0 0800H-0945H
15.3 To Bilge Tank, 2.10m3/3.50m3
1/E R.G.Velez Jr. 16 AUG 2018
-----------------------------------------------------------------------------------
-
18 AUG 2018 C 11.1 FO SLUDGE TANK
11.2 0.78m3
11.3 0.18m3
------------------------------------------------------------------------------
19 AUG 2018 C 12.1 4.0m3 sludge disposal from Bilge Oil Tank
to sludge barge at Dongil Shipyard
Busan, Korea
Bilge Oil Tank- 4.00m3/0.00m3 retained
Name of Vessel- Ocean No.3
1/E R.G.Velez Jr 19 AUG 2018
-----------------------------------------------------------------------------
21 AUG 2018 D 13.0 0.13m3 bilge water from E/R bilge Wells
14.0 0830H-0840H
15.3 To Bilge Tank, 0.00m3/0.13m3
1/E R.G.Velez Jr. 21 AUG 2018
------------------------------------------------------------------------------
23 AUG 2018 C 12.2 0.21m3 sludge transferred from F.O sludge tank
to Bilge Oil Tank
F.O. Sludge Tank- 0.45m3/0.24m3 retained
Bilge Oil Tank- 0.00m3/0.21m3 retained
1/E R.G.Velez Jr 23 AUG 2018
23 AUG 2018 C 12.2 0.18m3 sludge transferred from L.O sludge tank
to Bilge Oil Tank
L.O. Sludge Tank- 0.30m3/0.12m3 retained
Bilge Oil Tank- 0.21m3/0.39m3 retained
1/E R.G.Velez Jr 23 AUG 2018
-------------------------------------------------------------------------------
24 AUG 2018 D 13.0 0.10m3 bilge water from E/R bilge Wells
14.0 0800H-0809H
15.3 To Bilge Tank, 0.13m3/0.23m3
1/E R.G.Velez Jr. 24 AUG 2018
------------------------------------------------------------------------------
25 AUG 2018 C 12.2 0.18m3 sludge transferred from F.O sludge tank
to Waste oil sett. tank
F.O. Sludge Tank- 0.28m3/0.10m3 retained
Waste oil sett. tank- 0.00m3/0.18m3 retained
1/E R.G.Velez Jr 25 AUG 2018
25 AUG 2018 C 12.2 0.12m3 sludge transferred from L.O sludge tank
to Waste oil sett. tank
L.O. Sludge Tank- 0.18m3/0.06m3 retained
Waste oil sett. tank- 0.18m3/0.30m3 retained
1/E R.G.Velez Jr 25 AUG 2018
----------------------------------------------------------------------------------
25 AUG 2018 C 11.1 FO SLUDGE TANK
11.2 0.78m3
11.3 0.10m3
-------------------------------------------------------------------------------
27 AUG 2018 C 12.4 0.15m3 water evaporated from waste oil sett. tank
Waste Oil Sett. Tank- 0.30m3/0.15m3
1/E R.G.Velez Jr. 27 AUG 2018
27 AUG 2018 C 12.2 0.12m3 sludge transferred from F.O drain tank
to Bilge Oil Tank
F.O. drain Tank- 0.17m3/0.05m3 retained
Bilge Oil Tank- 0.39m3/0.51m3 retained
1/E R.G.Velez Jr 27 AUG 2018
27 AUG 2018 C 12.2 0.17m3 sludge transferred from F.O sludge tank
to Bilge Oil Tank
F.O. Sludge Tank- 0.25m3/0.08m3 retained
Bilge Oil Tank - 0.51m3/0.68m3 retained
1/E R.G.Velez Jr 27 AUG 2018
27 AUG 2018 C 12.2 0.13m3 sludge transferred from L.O sludge tank
to Waste Oil Sett. Tank
L.O. Sludge Tank- 0.18m3/0.05m3 retained
Waste Oil Sett. Tank - 0.15m3/0.28m3 retained
1/E R.G.Velez Jr 27 AUG 2018
27 AUG 2018 D 13.0 0.42m3 bilge water from E/R bilge Wells
14.0 0730H-0805H
15.3 To Bilge Tank, 0.23m3/0.65m3
1/E R.G.Velez Jr. 27 AUG 2018
------------------------------------------------------------------------------
28 AUG 2018 D 13.0 0.52m3 bilge water from E/R bilge Wells
14.0 0800H-0840H
15.3 To Bilge Tank, 0.65m3/1.17m3
1/E R.G.Velez Jr. 28 AUG 2018
---------------------------------------------------------------------------
29 AUG 2018 C 12.2 0.15m3 sludge transferred from F.O sludge tank
to Bilge Oil Tank
F.O. Sludge Tank- 0.33m3/0.18m3 retained
Bilge Oil Tank- 0.68m3/0.83m3 retained
1/E R.G.Velez Jr 29 AUG 2018
------------------------------------------------------------------------------
============================ SEPTEMBER 2018 ===================================
01 SEPT 2018 C 12.4 0.19m3 water evaporated from waste oil sett. tank
Waste Oil Sett. Tank- 0.28m3/0.09m3
1/E R.G.Velez Jr. 01 SEPT 2018
01 SEPT 2018 C 12.2 0.11m3 sludge transferred from F.O sludge tank
to Waste oil sett. tank
F.O. Sludge Tank- 0.23m3/0.12m3 retained
Waste oil sett. tank- 0.09m3/0.20m3 retained
1/E R.G.Velez Jr 01 SEPT 2018
01 SEPT 2018 C 12.2 0.10m3 sludge transferred from L.O sludge tank
to Waste oil sett. tank
L.O. Sludge Tank- 0.18m3/0.08m3 retained
Waste oil sett. tank- 0.20m3/0.30m3 retained
1/E R.G.Velez Jr 01 SEPT 2018
***********************************************************************************
***
GEUM GANG HO
OILY WATER SEPARATOR TYPE: USC - 10
Capacity - 1.000 L/h at 100%
03 NOV 2018 D 13 0.73 m3 bilge water from engine room bilge well
14 start 09:15 stop 10:00
15.3 to bige tank, 2.48 m3 retained
1/E Nguyen Xuan Bang .03.nov.2018
04 NOV 2018 c 12.4 0.16 m3 water evaporated from Waste oil tank , 0.46m3
retained
1/E Nguyen Xuan Bang .04.nov.2018
****************************** ok ****************************
05 NOV 2018 D 13 2.27 m3 bilge water from engine room bilge water
tank,0.21m3 retained
14 start 04:00 hrs 05.nov.2018
stop 09:00 hrs 05.nov.2018
15.1 Through 15PPM equipment over board
start position : 04-51.9'N , 099-25.3'E
stop position : 05-49.4'N , 098-56.5'E
1/E Nguyen Xuan Bang .05.nov.2018
07 NOV 2018 c 12.4 0.17 m3 water evaporated from Waste oil tank , 0.29m3
retained
1/E Nguyen Xuan Bang .07.nov.2018
07 NOV 2018 c 12.2 0.20 m3 sludge transferred from F.O sludge tank , 0.12m3
retained
to waste oil tank,0.49m3 retained
1/E Nguyen Xuan Bang .07.nov.2018
07 NOV 2018 c 12.2 0.23 m3 sludge transferred from L.O sludge tank , 0.10m3
retained
to waste oil tank,0.72m3 retained
1/E Nguyen Xuan Bang .07.nov.2018
09 NOV 2018 D 13 0.92 m3 bilge water from engine room bilge well
14 start 06:05 hrs stop 07:10 hrs
15.3 To bilge tank, 1.13 m3 retained
1/E Nguyen Xuan Bang .09.nov.2018
13 NOV 2018 D 13 0.92 m3 bilge water from engine room bilge well
14 start 09:05 hrs stop 10:20 hrs
15.3 To bilge tank, 2.05 m3 retained
1/E Nguyen Xuan Bang .13.nov.2018
17 NOV 2018 D 13 1.34 m3 bilge water from engine room bilge well
14 start 13:15 hrs stop 14:40 hrs
15.3 To bilge tank, 3.39 m3 retained
1/E Nguyen Xuan Bang .17.nov.2018
18 NOV 2018 I Weekly Inventory of Bilge Tank
Capacity:9.36m3 / 3.39m3 retained
1/E Nguyen Xuan Bang .18.nov.2018
20 NOV 2018 D 13 0.96 m3 bilge water from engine room bilge well
14 start 10:15 hrs stop 11:20 hrs
15.3 To bilge tank, 4.35 m3 retained
1/E Nguyen Xuan Bang .20.nov.2018
22 NOV 2018 c 12.2 0.30 m3 sludge transferred from F.O sludge tank , 0.08m3
retained
to Bilge oil tank,1.04m3 retained
1/E Nguyen Xuan Bang .22.nov.2018
22 NOV 2018 c 12.2 0.13 m3 sludge transferred from L.O sludge tank , 0.09m3
retained
to Bilge oil tank,1.17m3 retained
1/E Nguyen Xuan Bang .22.nov.2018
22 NOV 2018 c 12.2 0.14 m3 sludge transferred from scav box L.o drain
tank , 0.08m3 retained
to Bilge oil tank,1.31m3 retained
1/E Nguyen Xuan Bang .22.nov.2018
24 NOV 2018 D 13 4.05 m3 bilge water from engine room bilge water
tank,0.30m3 retained
14 start 07:00 hrs 24.nov.2018
stop 13:00 hrs 24.nov.2018
15.1 Through 15PPM equipment over board
start position : 06-16.4'N , 081-47.2'E
stop position : 05-48.4'N , 080-32.7'E
1/E Nguyen Xuan Bang .24.nov.2018
24 NOV 2018 c 12.4 0.39 m3 water evaporated from Waste oil tank , 0.33m3
retained
1/E Nguyen Xuan Bang .24.nov.2018
24 NOV 2018 c 12.2 0.27 m3 sludge transferred from waste oil tank , 0.06m3
retained
to Bilge oil tank,1.58m3 retained
1/E Nguyen Xuan Bang .24.nov.2018
24 NOV 2018 c 12.2 0.69 m3 sludge transferred from Bilge oil tank , 0.89m3
retained
to waste oil tank,0.75m3 retained
1/E Nguyen Xuan Bang .24.nov.2018
25 NOV 2018 c 12.4 0.07 m3 water evaporated from Waste oil tank , 0.68m3
retained
1/E Nguyen Xuan Bang .25.nov.2018
29 NOV 2018 c 12.4 0.27 m3 water evaporated from Waste oil tank , 0.41m3
retained
1/E Nguyen Xuan Bang .29.nov.2018
29 NOV 2018 c 12.2 0.22 m3 sludge transferred from F.O sludge tank , 0.13m3
retained
to WASTE oil tank,0.63m3 retained
1/E Nguyen Xuan Bang .29.nov.2018
29 NOV 2018 c 12.2 0.13 m3 sludge transferred from L.O sludge tank , 0.17m3
retained
to WASTE oil tank,0.76m3 retained
1/E Nguyen Xuan Bang .29.nov.2018
02 DEC 2018 D 13 0.73 m3 bilge water from engine room bilge well
14 start 14:25 hrs stop 15:10 hrs
15.3 To bilge tank, 1.03 m3 retained
1/E Nguyen Xuan Bang .02.dec.2018
04 DEC 2018 c 12.2 0.20 m3 sludge transferred from F.O sludge tank , 0.14m3
retained
to BILGE oil tank,1.09m3 retained
1/E Nguyen Xuan Bang .04.DEC.2018
05 DEC 2018 D 13 0.84 m3 bilge water from engine room bilge well
14 start 12:15 hrs stop 13:10 hrs
15.3 To bilge tank, 1.87 m3 retained
1/E Nguyen Xuan Bang .05.DEC.2018
08 DEC 2018 D 13 1.32 m3 bilge water from engine room bilge well
14 start 15:10 hrs stop 16:25 hrs
15.3 To bilge tank, 3.19 m3 retained
1/E Nguyen Xuan Bang .08.DEC.2018
09 DEC 2018 c 12.4 0.13 m3 water evaporated from Waste oil tank , 0.63m3
retained
1/E Nguyen Xuan Bang .09.DEC.2018
10 DEC 2018 D 13 2.22m3 bilge water from engine room bilge water
tank,0.97m3 retained
14 start 16:00 hrs 10.DEC.2018
stop 20:00 hrs 10.DEC.2018
15.1 Through 15PPM equipment over board
start position : 25-08.4'N , 058-32.0'E
stop position : 24-56.10'N ,05-59.61 'E
1/E Nguyen Xuan Bang .10.DEC.2018
11 DEC 2018 c 12.2 0.28 m3 sludge transferred from F.O sludge tank , 0.08m3
retained
to BILGE oil tank,1.40m3 retained
1/E Nguyen Xuan Bang .11.DEC.2018
11 DEC 2018 c 12.2 0.21 m3 sludge transferred from L.O sludge tank , 0.09m3
retained
to BILGE oil tank,1.61m3 retained
1/E Nguyen Xuan Bang .11.DEC.2018
11 DEC 2018 c 12.2 0.15 m3 sludge transferred from SCAV.BOX L.O DRAIN
tank , 0.11m3 retained
to BILGE oil tank,1.76m3 retained
1/E Nguyen Xuan Bang .11.DEC.2018
12 DEC 2018 c 12.4 0.26 m3 water evaporated from Waste oil tank , 0.37m3
retained
1/E Nguyen Xuan Bang .12.DEC.2018
12 DEC 2018 c 12.2 0.30 m3 sludge transferred from WASTE OIL tank , 0.07m3
retained
to BILGE oil tank,2.06m3 retained
1/E Nguyen Xuan Bang .12.DEC.2018
12 DEC 2018 c 12.2 0.69 m3 sludge transferred from BILGE OIL tank , 1.37m3
retained
to WASTE oil tank,0.76m3 retained
1/E Nguyen Xuan Bang .12.DEC.2018
14 DEC 2018 D 13 0.72m3 bilge water from engine room bilge water
tank,0.25m3 retained
14 start 06:00 hrs 14.DEC.2018
stop 09:00 hrs 14.DEC.2018
15.1 Through 15PPM equipment over board
start position : 15-53.3'N , 071-05.5'E
stop position : 15-23.42'N ,071-24.98 'E
1/E Nguyen Xuan Bang .14.DEC.2018
15 DEC 2018 C 11.1 Bilge oil tank
11.2 6.40 m3
11.3 1.40 m3
11.4 0.03 m3 sludge collected from wash oil
1/E Nguyen Xuan Bang .15.DEC.2018
16 DEC 2018 c 12.4 0.34 m3 water evaporated from Waste oil tank , 0.42m3
retained
1/E Nguyen Xuan Bang .16.DEC.2018
18 DEC 2018 c 12.2 0.25 m3 sludge transferred from F.O SLUDGE tank , 0.12m3
retained
to WASTE oil tank,0.63m3 retained
1/E Nguyen Xuan Bang .18.DEC.2018
18 DEC 2018 c 12.2 0.14 m3 sludge transferred from L.O SLUDGE tank , 0.23m3
retained
to WASTE oil tank,0.77m3 retained
1/E Nguyen Xuan Bang .18.DEC.2018
21 DEC 2018 D 13 1.27 m3 bilge water from engine room bilge well
14 start 20:10 hrs stop 21:45 hrs
15.3 To bilge tank, 1.52 m3 retained
1/E Nguyen Xuan Bang .21.DEC.2018
22 DEC 2018 D 13 1.54 m3 bilge water from engine room bilge well
14 start 14:30 hrs stop 16:15 hrs
15.3 To bilge tank, 3.06 m3 retained
1/E Nguyen Xuan Bang .22.DEC.2018
22 DEC 2018 c 12.4 0.27 m3 water evaporated from Waste oil tank , 0.50m3
retained
1/E Nguyen Xuan Bang .22.DEC.2018
24 DEC 2018 D 13 0.73 m3 bilge water from engine room bilge well
14 start 15:30 hrs stop 16:25 hrs
15.3 To bilge tank, 3.79 m3 retained
1/E Nguyen Xuan Bang .24.DEC.2018
26 DEC 2018 c 12.2 0.45 m3 sludge transferred from WASTE OIL tank , 0.05m3
retained
to BILGE oil tank,1.85m3 retained
1/E Nguyen Xuan Bang .26.DEC.2018
26 DEC 2018 c 12.2 0.26 m3 sludge transferred from F.O SLUDGE tank , 0.09m3
retained
to BILGE oil tank,2.11m3 retained
1/E Nguyen Xuan Bang .26.DEC.2018
26 DEC 2018 c 12.2 0.23 m3 sludge transferred from L.O SLUDGE tank , 0.08m3
retained
to BILGE oil tank,2.34m3 retained
1/E Nguyen Xuan Bang .26.DEC.2018
26 DEC 2018 c 12.2 0.20 m3 sludge transferred from SCAV.BOX L.O DRAIN
tank , 0.08m3 retained
to BILGE oil tank,2.54 m3 retained
1/E Nguyen Xuan Bang .26.DEC.2018
26 DEC 2018 c 12.2 0.71 m3 sludge transferred from BILGE OIL tank , 1.83m3
retained
to WASTE oil tank,0.76m3 retained
1/E Nguyen Xuan Bang .26.DEC.2018
29 DEC 2018 D 13 3.45m3 bilge water from engine room bilge water
tank,0.34m3 retained
14 start 05:00 hrs 29.DEC.2018
stop 09:00 hrs 29.DEC.2018
15.1 Through 15PPM equipment over board
start position :10.24'.7N/095.59'.8E
stop position :09.35'.40N/096.23'.42E
1/E Nguyen Xuan Bang .29.DEC.2018
30 DEC 2018 c 12.4 0.37 m3 water evaporated from Waste oil tank , 0.39m3
retained
1/E Nguyen Xuan Bang .30.DEC.2018
01 JAN 2019 D 13 0.85 m3 bilge water from engine room bilge well
14 start 15:50 hrs stop 16:45 hrs
15.3 To bilge tank, 1.19 m3 retained
1/E Nguyen Xuan Bang .01.JAN.2019
02 JAN 2019 c 12.2 0.19 m3 sludge transferred from F.O SLUDGE tank ,0.17m3
retained
to BILGE oil tank,2.02m3 retained
1/E Nguyen Xuan Bang .02.JAN.2019
08 JAN 2019 D 13 1.07 m3 bilge water from engine room bilge well
14 start 06:05 hrs stop 07:20 hrs
15.3 To bilge tank, 3.12 m3 retained
1/E Nguyen Xuan Bang .08.JAN.2019
08 JAN 2019 c 12.2 0.28 m3 sludge transferred from F.O SLUDGE tank ,0.09m3
retained
to BILGE oil tank,2.30m3 retained
1/E Nguyen Xuan Bang .08.JAN.2019
10 JAN 2019 c 12.2 0.32 m3 sludge transferred from WASTE OIL tank ,0.07m3
retained
to BILGE oil tank,2.62m3 retained
1/E Nguyen Xuan Bang .10.JAN.2019
10 JAN 2019 c 12.2 0.22 m3 sludge transferred from L.O SLUDGE tank ,0.07m3
retained
to BILGE oil tank,2.84m3 retained
1/E Nguyen Xuan Bang .10.JAN.2019
10 JAN 2019 c 12.2 0.16 m3 sludge transferred from SCAV BOX L.O DRAIN
tank ,0.08m3 retained
to BILGE oil tank,3.00m3 retained
1/E Nguyen Xuan Bang .10.JAN.2019
10 JAN 2019 c 12.2 0.67 m3 sludge transferred from BILGE OIL tank ,2.33m3
retained
to WASTE oil tank,0.74m3 retained
1/E Nguyen Xuan Bang .10.JAN.2019
12 JAN 2019 D 13 2.82m3 bilge water from engine room bilge water
tank,0.30m3 retained
14 start 07:00 hrs 12.jan.2019
stop 16:00 hrs 12.JAN.2019
15.1 Through 15PPM equipment over board
start position :08.30'.7N/107.19'.0E
stop position :08.38'.1N/107.40'.2E
1/E Nguyen Xuan Bang .12.JAN.2019
13 JAN 2019 c 12.4 0.22 m3 water evaporated from Waste oil tank , 0.52m3
retained
1/E Nguyen Xuan Bang .13.JAN.2019
15 JAN 2019 c 12.2 0.25 m3 sludge transferred from F.O SLUDGE tank ,0.10m3
retained
to BILGE oil tank,2.62m3 retained
1/E Nguyen Xuan Bang .15.JAN.2019
16 JAN 2019 c 12.4 0.09 m3 water evaporated from Waste oil tank , 0.43m3
retained
1/E Nguyen Xuan Bang .16.JAN.2019
16 JAN 2019 c 12.2 0.34 m3 sludge transferred from WASTE OI TANK tank ,
0.09m3 retained
to BILGE oil tank,2.96m3 retained
1/E Nguyen Xuan Bang .16.JAN.2019
18 JAN 2019 c 12.2 0.23 m3 sludge transferred from L.O SLUDGE tank ,0.10m3
retained
to BILGE oil tank,3.19m3 retained
1/E Nguyen Xuan Bang .18.JAN.2019
21 JAN 2019 D 13 0.94 m3 bilge water from engine room bilge well
14 start 21:05 hrs stop 22:10 hrs
15.3 To bilge tank, 1.24 m3 retained
1/E Nguyen Xuan Bang .21.JAN.2019
23 JAN 2019 D 13 0.57 m3 bilge water from engine room bilge well
14 start 06:20 hrs stop 07:05 hrs
15.3 To bilge tank, 1.81 m3 retained
1/E Nguyen Xuan Bang .23.JAN.2019
24 JAN 2019 D 13 1.42m3 bilge water from engine room bilge water
tank,0.39m3 retained
14 start 06:00 hrs 24.jan.2019
stop 10:00 hrs 24.JAN.2019
15.1 Through 15PPM equipment over board
start position :31.20'.4N/123.11'.1E
stop position :31.53'.5N/123.43'.7E
1/E Nguyen Xuan Bang .24.JAN.2019
24 JAN 2019 c 12.2 0.20 m3 sludge transferred from F.O SLUDGE tank ,0.10m3
retained
to BILGE oil tank,3.39m3 retained
1/E Nguyen Xuan Bang .24.JAN.2019
24 JAN 2019 c 12.2 0.16 m3 sludge transferred from L.O SLUDGE tank ,0.09m3
retained
to BILGE oil tank,3.55m3 retained
1/E Nguyen Xuan Bang .18.JAN.2019
24 JAN 2019 c 12.2 0.17 m3 sludge transferred from SCAV BOX L.O DRAIN
tank ,0.08m3 retained
to BILGE oil tank,3.72m3 retained
1/E Nguyen Xuan Bang .24.JAN.2019
26 JAN 2019 D 13 0.53 m3 bilge water from engine room bilge well
14 start 03:20 hrs stop 04:05 hrs
15.3 To bilge tank, 0.92 m3 retained
1/E Nguyen Xuan Bang .26.JAN.2019
28 JAN 2019 D 13 0.66 m3 bilge water from engine room bilge well
14 start 10:10 hrs stop 10:55 hrs
15.3 To bilge tank, 1.58 m3 retained
1/E Nguyen Xuan Bang .28.JAN.2019
30 JAN 2019 D 13 0.84 m3 bilge water from engine room bilge well
14 start 09:10 hrs stop 10:05 hrs
15.3 To bilge tank, 2.42 m3 retained
1/E Nguyen Xuan Bang .30.JAN.2019
01 FEB 2019 D 13 0.51 m3 bilge water from engine room bilge well
14 start 10:15 hrs stop 10:55 hrs
15.3 To bilge tank, 2.93 m3 retained
1/E Nguyen Xuan Bang .01.FEB.2019
02 FEB 2019 c 12.2 0.20 m3 sludge transferred from F.O SLUDGE tank ,0.08 m3
retained
to BILGE oil tank,4.58 m3 retained
1/E Nguyen Xuan Bang .02.FEB.2019
02 FEB 2019 c 12.2 0.19 m3 sludge transferred from L.O SLUDGE tank ,0.08 m3
retained
to BILGE oil tank,4.77 m3 retained
1/E Nguyen Xuan Bang .02.FEB.2019
02 FEB 2019 c 12.2 0.07 m3 sludge transferred from SCAV.BOX L.O DRAIN
tank ,0.07 m3 retained
to BILGE oil tank,4.84 m3 retained
1/E Nguyen Xuan Bang .02.FEB.2019
02 FEB 2019 D 13 2.50 m3 bilge water from engine room BILGE TANK
14 start 08:00 hrs stop 11:20 hrs
15.2 To BARGE GORYEO NO2 AT ULSAN KOREA
1/E Nguyen Xuan Bang .02.FEB.2019
02 FEB 2019 c 12.1 4.50 m3 sludge transferred from BILGE OIL TANK tank ,
0.34 m3 retained
to BARGE GORYEO NO2 AT ULSAN KOREA,
1/E Nguyen Xuan Bang .02.FEB.2019
04 FEB 2019 D 13 0.54 m3 bilge water from engine room bilge well
14 start 12:20 hrs stop 13:00 hrs
15.3 To bilge tank, 0.97 m3 retained
1/E Nguyen Xuan Bang .04.FEB.2019
07 FEB 2019 D 13 0.72 m3 bilge water from engine room bilge well
14 start 08:10 hrs stop 09:05 hrs
15.3 To bilge tank, 1.69 m3 retained
1/E Nguyen Xuan Bang .07.FEB.2019
10 FEB 2019 D 13 0.98 m3 bilge water from engine room bilge well
14 start 11:40 hrs stop 13:00 hrs
15.3 To bilge tank, 2.67 m3 retained
1/E Nguyen Xuan Bang .10.FEB.2019
13 JAN 2019 D 13 2.42m3 bilge water from engine room bilge water
tank,0.25m3 retained
14 start 06:00 hrs 13.FEB.2019
stop 10:00 hrs 13.FEB.2019
15.1 Through 15PPM equipment over board
start position :19.33'.8N/112.33'.8E
stop position :18.50'.8N/112.06'.3E
1/E Nguyen Xuan Bang .13.FEB.2019
13 FEB 2019 c 12.2 0.26 m3 sludge transferred from F.O SLUDGE tank ,0.09 m3
retained
to BILGE oil tank,0.62 m3 retained
1/E Nguyen Xuan Bang .13.FEB.2019
13 FEB 2019 c 12.2 0.22 m3 sludge transferred from L.O SLUDGE tank ,0.08 m3
retained
to BILGE oil tank,0.84 m3 retained
1/E Nguyen Xuan Bang .13.FEB.2019
17 FEB 2019 D 13 0.94 m3 bilge water from engine room bilge well
14 start 03:15 hrs stop 04:25 hrs
15.3 To bilge tank, 1.19 m3 retained
1/E Nguyen Xuan Bang .17.FEB.2019
20 FEB 2019 D 13 0.86 m3 bilge water from engine room bilge well
14 start 09:10 hrs stop 10:05 hrs
15.3 To bilge tank, 2.05 m3 retained
1/E Nguyen Xuan Bang .20.FEB.2019
20 FEB 2019 c 12.2 0.18 m3 sludge transferred from SCAV.BOX L.O DRAIN
tank ,0.09 m3 retained
to BILGE oil tank,1.02 m3 retained
1/E Nguyen Xuan Bang .02.FEB.2019
23 FEB 2019 c 12.2 0.26 m3 sludge transferred from F.O SLUDGE tank ,0.09 m3
retained
to BILGE oil tank,1.28 m3 retained
1/E Nguyen Xuan Bang .23.FEB.2019
23 FEB 2019 c 12.2 0.21 m3 sludge transferred from L.O SLUDGE tank ,0.08 m3
retained
to BILGE oil tank,1.49 m3 retained
1/E Nguyen Xuan Bang .23 .FEB.2019
23 FEB 2019 D 13 0.92 m3 bilge water from engine room bilge well
14 start 11:15 hrs stop 12:20 hrs
15.3 To bilge tank, 1.13 m3 retained
1/E Nguyen Xuan Bang .23.FEB.2019
01 MAR 2019 D 13 0.95 m3 bilge water from engine room bilge well
14 start 10:05 hrs stop 11:20 hrs
15.3 To bilge tank, retained in tank 3.06 m3
1/E Nguyen Xuan Bang .01.MAR.2019
02 MAR 2019 D 13 2.72 m3 bilge water from engine room bilge water tank
capacity 9.36m3, 0.34 m3 retained
14 start 06:30 hrs 02.MAR.2019
stop 10:00 hrs 02.MAR.2019
15.1 Through 15PPM oil filter equipment over board
start position :00.51'.5S,106.56'4E
stop position :00.13'.6 S,106.42'.5E
1/E Nguyen Xuan Bang .02.MAR.2019
07 Mar 2019 c 12.4 0.13 m3 water evaporated from Waste oil tank , 0.28 m3
retained
1/E Nguyen Xuan Bang .07.Mar.2019
13 MAR 2019 D 13 1.41 m3 bilge water from engine room bilge well
14 start 08:10 hrs stop 10:00 hrs
15.3 To bilge tank, retained in tank 1.75 m3
1/E Nguyen Xuan Bang .13.MAR.2019
16 MAR 2019 D 13 0.61 m3 bilge water from engine room bilge well
14 start 20:00 hrs stop 20:50 hrs
15.3 To bilge tank, retained in tank 2.36 m3
1/E Nguyen Xuan Bang .16.MAR.2019
19 Mar 2019 c 12.2 0.21 m3 sludge transferred from F.O SLUDGE tank ,0.10 m3
retained
to BILGE oil tank,retained in tank 1.64 m3
1/E Nguyen Xuan Bang .19.Mar.2019
19 Mar 2019 c 12.2 0.19 m3 sludge transferred from L.O SLUDGE tank ,0.09 m3
retained
to BILGE oil tank,retained in tank 1.83 m3
1/E Nguyen Xuan Bang .19.Mar.2019
19 Mar 2019 c 12.2 0.14 m3 sludge transferred from scav box L.O Drain
tank ,0.08 m3 retained
to BILGE oil tank,retained in tank 1.97 m3
1/E Nguyen Xuan Bang .19.Mar.2019
22 MAR 2019 D 13 1.02 m3 bilge water from engine room bilge well
14 start 05:00 hrs stop 06:20 hrs
15.3 To bilge tank, retained in tank 1.19 m3
1/E Nguyen Xuan Bang .22.MAR.2019
25 MAR 2019 D 13 0.86 m3 bilge water from engine room bilge well
14 start 16:00 hrs stop 17:10 hrs
15.3 To bilge tank, retained in tank 2.05 m3
1/E Nguyen Xuan Bang .25.MAR.2019
27 MAR 2019 D 13 1.84 m3 bilge water from engine room bilge water tank
capacity 9.36m3, 0.21 m3 retained
14 start 06:00 hrs 27.MAR.2019
stop 10:00 hrs 27.MAR.2019
15.1 Through 15PPM oil filter equipment over board
start position :
stop position :32.02'.92 N,123.30'.22E
1/E Nguyen Xuan Bang .27.MAR.2019
30 MAR 2019 D 13 1.25 m3 bilge water from engine room bilge wellS
14 start 07:00 hrs stop 08:50 hrs
15.3 To bilge tank, retained in tank 1.46 m3
1/E Nguyen Xuan Bang .30.MAR.2019
31 Mar 2019 C 11.1 Bilge oil tank
11.2 6.40 m3
11.3 1.99 m3
11.4 0.02 m3 collected from wash oil
1/E Nguyen Xuan Bang .31.Mar.2019
01 APR 2019 c 12.2 0.20 m3 sludge transferred from F.O SLUDGE tank ,0.10 m3
retained
to BILGE oil tank,retained in tank 2.19 m3
1/E Nguyen Xuan Bang .01.APR.2019
01 APR 2019 c 12.2 0.14 m3 sludge transferred from L.O SLUDGE tank ,0.10 m3
retained
to BILGE oil tank,retained in tank 2.33 m3
1/E Nguyen Xuan Bang .01.APR.2019
01 APR 2019 D 13 1.21 m3 bilge water from engine room bilge water tank
capacity 9.36m3, 0.25 m3 retained
14 start 06:30 hrs 01.APR.2019
stop 09:30 hrs 01.APR.2019
15.1 Through 15PPM oil filter equipment over board
start position :32,06'.695N/124.38.837E
stop position :32.26'.57 N,125.19'.49E
1/E Nguyen Xuan Bang .01.APR.2019
03 APR 2019 D 13 1.27 m3 bilge water from engine room bilge wellS
14 start 09:10 hrs stop 11:00 hrs
15.3 To bilge tank, retained in tank 1.52 m3
1/E Nguyen Xuan Bang .03.APR.2019
07 APR 2019 D 13 1.35 m3 bilge water from engine room bilge water tank
capacity 9.36m3, 0.17 m3 retained
14 start 07:30 hrs 07.APR.2019
stop 11:00 hrs 07.APR.2019
15.1 Through 15PPM oil filter equipment over board
start position :32,06'.695N/124.38.837E
stop position :32.26'.57 N,125.19'.49E
1/E Nguyen Xuan Bang .07.APR.2019
09 APR 2019 D 13 0.70 m3 bilge water from engine room bilge wellS
14 start 17:30 hrs stop 18:20 hrs
15.3 To bilge tank, retained in tank 0.87 m3
1/E Nguyen Xuan Bang .09.APR.2019
11 APR 2019 D 13 1.49 m3 bilge water from engine room bilge wellS
14 start 13:10 hrs stop 15:00 hrs
15.3 To bilge tank, retained in tank 2.36 m3
1/E Nguyen Xuan Bang .11.APR.2019
14 APR 2019 D 13 0.83 m3 bilge water from engine room bilge wellS
14 start 02:00 hrs stop 03:00 hrs
15.3 To bilge tank, retained in tank 3.19 m3
1/E Nguyen Xuan Bang .14.APR.2019
15 APR 2019 c 12.2 0.22 m3 sludge transferred from F.O SLUDGE tank ,0.09 m3
retained
to BILGE oil tank,retained in tank 2.55 m3
1/E Nguyen Xuan Bang .15.APR.2019
15 APR 2019 c 12.2 0.18 m3 sludge transferred from L.O SLUDGE tank ,0.07 m3
retained
to BILGE oil tank,retained in tank 2.73 m3
1/E Nguyen Xuan Bang .15.APR.2019
15 APR 2019 c 12.2 0.15 m3 sludge transferred from SCAV.BOX L.O DRAIN
tank ,0.10 m3 retained
to BILGE oil tank,retained in tank 2.88 m3
1/E Nguyen Xuan Bang .15.APR.2019
15 APR 2019 c 12.2 0.21 m3 sludge transferred from WASTE OIL TANK tank ,
0.07 m3 retained
to BILGE oil tank,retained in tank 3.09 m3
1/E Nguyen Xuan Bang .15.APR.2019
15 APR 2019 c 12.2 0.72 m3 sludge transferred from BILGE OIL tank ,2.37 m3
retained
to WASTE OIL tank,retained in tank 0.79 m3
1/E Nguyen Xuan Bang .15.APR.2019
16 APR 2019 D 13 3.02 m3 bilge water from engine room bilge water tank
capacity 9.36m3, 0.17 m3 retained
14 start 08:00 hrs 16.APR.2019
stop 14:00 hrs 16.APR.2019
15.1 Through 15PPM oil filter equipment over board
start position :15,59'.80N/113.08.90E
stop position :14.51'.01 N,112.43'.44E
1/E Nguyen Xuan Bang .16.APR.2019
16 APR 2019 c 12.4 0.21 m3 water evaporated from Waste oil tank , 0.58 m3
retained
1/E Nguyen Xuan Bang .16.APR.2019
17 APR 2019 c 12.4 0.13 m3 water evaporated from Waste oil tank , 0.45 m3
retained
1/E Nguyen Xuan Bang .17.APR.2019
18 APR 2019 c 12.4 0.16 m3 water evaporated from Waste oil tank , 0.29 m3
retained
1/E Nguyen Xuan Bang .17.APR.2019
18 APR 2019 c 12.2 0.21 m3 sludge transferred from WASTE OIL TANK tank ,
0.08 m3 retained
to BILGE oil tank,retained in tank 2.58 m3
1/E Nguyen Xuan Bang .18.APR.2019
18 APR 2019 c 12.2 0.69 m3 sludge transferred from BILGE OIL tank ,1.89 m3
retained
to WASTE OIL tank,retained in tank 0.78 m3
1/E Nguyen Xuan Bang .18.APR.2019
19 APR 2019 c 12.4 0.20 m3 water evaporated from Waste oil tank , 0.58 m3
retained
1/E Nguyen Xuan Bang .17.APR.2019
20 APR 2019 D 13 0.56 m3 bilge water from engine room bilge wellS
14 start 20:00 hrs stop 20:50 hrs
15.3 To bilge tank, retained in tank 3.75 m3
1/E Nguyen Ngoc Tuyen .20.APR.2019
21 APR 2019 c 12.4 0.20 m3 water evaporated from Waste oil tank , 0.38 m3
retained
1/E Nguyen Ngoc Tuyen .21.APR.2019
22 APR 2019 D 13 0.65 m3 bilge water from engine room bilge wellS
14 start 04:00 hrs stop 05:00 hrs
15.3 To bilge tank, retained in tank 4.40 m3
1/E Nguyen Ngoc Tuyen .22.APR.2019
22 APR 2019 c 12.2 0.20 m3 sludge transferred from F.O SLUDGE tank ,0.13 m3
retained
to BILGE oil tank,retained in tank 2.09 m3
1/E Nguyen Ngoc Tuyen .22.APR.2019
22 APR 2019 c 12.4 0.16 m3 water evaporated from Waste oil tank , 0.22 m3
retained
1/E Nguyen Ngoc Tuyen .22.APR.2019
23 APR 2019 c 12.2 0.40 m3 sludge transferred from BILGE OIL tank , 1.69 m3
retained
to WASTE OIL tank,retained in tank 0.62 m3
1/E Nguyen Ngoc Tuyen .23.APR.2019
23 APR 2019 c 12.4 0.21 m3 water evaporated from Waste oil tank , 0.41 m3
retained
1/E Nguyen Ngoc Tuyen .23.APR.2019
24 APR 2019 D 13 0.55 m3 bilge water from engine room bilge wellS
14 start 05:00 hrs stop 05:50 hrs
15.3 To bilge tank, retained in tank 4.95 m3
1/E Nguyen Ngoc Tuyen .24.APR.2019
24 APR 2019 c 12.4 0.20 m3 water evaporated from Waste oil tank , 0.21 m3
retained
1/E Nguyen Ngoc Tuyen .24.APR.2019
25 APR 2019 c 12.2 0.18 m3 sludge transferred from F.O SLUDGE tank ,0.13 m3
retained
to BILGE oil tank,retained in tank 1.87 m3
1/E Nguyen Ngoc Tuyen .25.APR.2019
25 APR 2019 c 12.2 0.21 m3 sludge transferred from L.O SLUDGE tank ,0.16 m3
retained
to BILGE oil tank,retained in tank 2.08 m3
1/E Nguyen Ngoc Tuyen .25.APR.2019
25 APR 2019 D 13 4.05 m3 bilge water from engine room bilge water tank
capacity 9.36m3, 0.90 m3 retained
14 start 06:50 hrs 25.APR.2019
stop 11:50 hrs 25.APR.2019
15.1 Through 15PPM oil filter equipment over board
start position :05,50'.028N/084.09.470E
stop position :05.49'.468N/082.55.776E
1/E Nguyen Ngoc Tuyen .25.APR.2019
26 APR 2019 c 12.2 0.45 m3 sludge transferred from BILGE OIL tank ,1.63 m3
retained
to WASTE oil tank,retained in tank 0.66 m3
1/E Nguyen Ngoc Tuyen. 26.APR.2019
26 APR 2019 D 13 0.6 m3 bilge water from engine room bilge wellS
14 start 16:00 hrs stop 16:50 hrs
15.3 To bilge tank, retained in tank 1.50 m3
1/E Nguyen Ngoc Tuyen .26.APR.2019
27 APR 2019 c 12.4 0.24 m3 water evaporated from Waste oil tank , 0.42 m3
retained
1/E Nguyen Ngoc Tuyen .27.APR.2019
27 APR 2019 c 12.2 0.15 m3 sludge transferred from SCAV.BOX L.O DRAIN
tank ,0.13 m3 retained
to BILGE oil tank,retained in tank 2.21 m3
1/E Nguyen Ngoc Tuyen .27.APR.2019
28 APR 2019 c 12.4 0.21 m3 water evaporated from Waste oil tank , 0.21 m3
retained
1/E Nguyen Ngoc Tuyen .28.APR.2019
28 APR 2019 c 12.2 0.31 m3 sludge transferred from BILGE OIL tank , 1.90 m3
retained
to WASTE OIL tank,retained in tank 0.52 m3
1/E Nguyen Ngoc Tuyen .28.APR.2019
29 APR 2019 c 12.4 0.25 m3 water evaporated from Waste oil tank , 0.27 m3
retained
1/E Nguyen Ngoc Tuyen .29.APR.2019
30 APR 2019 c 12.2 0.30 m3 sludge transferred from BILGE OIL tank, 1.60 m3
retained
to WASTE OIL tank,retained in tank 0.57 m3
1/E Nguyen Ngoc Tuyen .30.APR.2019
30 APR 2019 c 12.2 0.18 m3 sludge transferred from F.O SLUDGE tank ,0.12 m3
retained
to BILGE oil tank,retained in tank 1.78 m3
1/E Nguyen Ngoc Tuyen .30.APR.2019
01 MAY 2019 c 12.4 0.25 m3 water evaporated from Waste oil tank , 0.32 m3
retained
1/E Nguyen Ngoc Tuyen .01.MAY.2019
02 MAY 2019 c 12.2 0.20 m3 sludge transferred from L.O SLUDGE tank ,0.12 m3
retained
to BILGE oil tank,retained in tank 1.80 m3
1/E Nguyen Ngoc Tuyen .02.MAY.2019
02 MAY 2019 D 13 0.60 m3 bilge water from engine room bilge wellS
14 start 16:00 hrs stop 16:50 hrs
15.3 To bilge tank, retained in tank 2.10 m3
1/E Nguyen Ngoc Tuyen .02.MAY.2019
03 MAY 2019 c 12.2 0.30 m3 sludge transferred from BILGE OIL tank, 1.50 m3
retained
to WASTE OIL tank,retained in tank 0.62 m3
1/E Nguyen Ngoc Tuyen .03.MAY.2019
04 MAY 2019 c 12.4 0.32 m3 water evaporated from Waste oil tank , 0.30 m3
retained
1/E Nguyen Ngoc Tuyen .04.MAY.2019
04 MAY 2019 c 12.2 0.20 m3 sludge transferred from WASTE OIL TANK tank ,
0.10 m3 retained
to BILGE oil tank,retained in tank 1.70 m3
1/E Nguyen Ngoc Tuyen .04.MAY.2019
05 MAY 2019 D 13 0.60 m3 bilge water from engine room bilge wellS
14 start 04:00 hrs stop 04:50 hrs
15.3 To bilge tank, retained in tank 2.70 m3
1/E Nguyen Ngoc Tuyen .05.MAY.2019
05 MAY 2019 c 12.2 0.15 m3 sludge transferred from SCAV.BOX L.O DRAIN
tank ,0.10 m3 retained
to BILGE oil tank,retained in tank 1.85 m3
1/E Nguyen Ngoc Tuyen .05.MAY.2019
06 MAY 2019 c 12.2 0.30 m3 sludge transferred from BILGE OIL tank, 1.55 m3
retained
to WASTE OIL tank,retained in tank 0.40 m3
1/E Nguyen Ngoc Tuyen .06.MAY.2019
07 MAY 2019 c 12.4 0.25 m3 water evaporated from Waste oil tank , 0.15 m3
retained
1/E Nguyen Ngoc Tuyen .07.MAY.2019
07 MAY 2019 D 13 1.60 m3 bilge water from engine room bilge wellS
14 start 05:00 hrs stop 06:50 hrs
15.3 To bilge tank, retained in tank 4.30 m3
1/E Nguyen Ngoc Tuyen .07.MAY.2019
08 MAY 2019 c 12.2 0.40 m3 sludge transferred from BILGE OIL tank, 1.15 m3
retained
to WASTE OIL tank,retained in tank 0.55 m3
1/E Nguyen Ngoc Tuyen .08.MAY.2019
08 MAY 2019 c 12.2 0.25 m3 sludge transferred from F.O SLUDGE tank ,0.12 m3
retained
to BILGE oil tank,retained in tank 1.40 m3
1/E Nguyen Ngoc Tuyen .08.MAY.2019
09 MAY 2019 c 12.4 0.35 m3 water evaporated from Waste oil tank , 0.20 m3
retained
1/E Nguyen Ngoc Tuyen .09.MAY.2019
10 MAY 2019 D 13 0.60 m3 bilge water from engine room bilge wellS
14 start 04:00 hrs stop 04:50 hrs
15.3 To bilge tank, retained in tank 4.90 m3
1/E Nguyen Ngoc Tuyen .10.MAY.2019
10 MAY 2019 c 12.2 0.30 m3 sludge transferred from BILGE OIL tank, 1.10 m3
retained
to WASTE OIL tank,retained in tank 0.50 m3
1/E Nguyen Ngoc Tuyen .10.MAY.2019
11 MAY 2019 D 13 4.50 m3 bilge water from engine room bilge water tank
capacity 9.36m3, 0.40 m3 retained
14 start 06:00 hrs 11.MAY.2019
stop 11:00 hrs 11.MAY.2019
15.1 Through 15PPM oil filter equipment over board
start position :23'54.52'N/062'37.67'E
stop position :24'06.82'N/061'37.66'E
13 MAY 2019 c 12.4 0.35 m3 water evaporated from Waste oil tank, 0.20 m3
retained
1/E Nguyen Ngoc Tuyen .13.MAY.2019
15 MAY 2019 D 13 0.6 m3 bilge water from engine room bilge wellS
14 start 16:00 hrs stop 16:50 hrs
15.3 To bilge tank, retained in tank 1.00 m3
1/E Nguyen Ngoc Tuyen .15.MAY.2019
16 MAY 2019 c 12.2 0.30 m3 sludge transferred from F.O SLUDGE tank ,0.10 m3
retained
to BILGE oil tank,retained in tank 1.40 m3
1/E Nguyen Ngoc Tuyen .16.MAY.2019
16 MAy 2019 c 12.2 0.15 m3 sludge transferred from WASTE OIL TANK , 0.05 m3
retained
to BILGE oil tank,retained in tank 1.55 m3
1/E Nguyen Ngoc Tuyen. 16.MAY.2019
17 MAY 2019 c 12.2 0.25 m3 sludge transferred from SCAV.BOX L.O DRAIN
tank ,0.05 m3 retained
to BILGE oil tank,retained in tank 1.80 m3
1/E Nguyen Ngoc Tuyen .17.MAY.2019
17 MAY 2019 c 12.2 0.40 m3 sludge transferred from BILGE OIL tank, 1.40 m3
retained
to WASTE OIL tank,retained in tank 0.45 m3
1/E Nguyen Ngoc Tuyen. 17.MAY.2019
18 MAY 2019 c 12.4 0.30 m3 water evaporated from Waste oil tank, 0.15 m3
retained
1/E Nguyen Ngoc Tuyen. 18.MAY.2019
20 MAY 2019 c 12.2 0.40 m3 sludge transferred from BILGE OIL tank, 1.00 m3
retained
to WASTE OIL tank,retained in tank 0.55 m3
1/E Nguyen Ngoc Tuyen. 20.MAY.2019
21 MAY 2019 c 12.4 0.30 m3 water evaporated from Waste oil tank, 0.15 m3
retained
1/E Nguyen Ngoc Tuyen. 21.MAY.2019
23 MAY 2019 D 13 0.50 m3 bilge water from engine room bilge wellS
14 start 05:00 hrs stop 05:40 hrs
15.3 To bilge tank, retained in tank 1.50 m3
1/E Nguyen Ngoc Tuyen. 23.MAY.2019
25 MAY 2019 c 12.2 0.25 m3 sludge transferred from L.O SLUDGE tank ,0.05 m3
retained
to BILGE oil tank,retained in tank 1.25 m3
1/E Nguyen Ngoc Tuyen .25.MAY.2019
28 MAY 2019 c 12.2 0.25 m3 sludge transferred from SCAV.BOX L.O DRAIN
tank ,0.05 m3 retained
to BILGE oil tank,retained in tank 1.50 m3
1/E Nguyen Ngoc Tuyen .28.MAY.2019
28 MAY 2019 c 12.2 0.40 m3 sludge transferred from BILGE OIL tank, 1.10 m3
retained
to WASTE OIL tank,retained in tank 0.55 m3
1/E Nguyen Ngoc Tuyen. 28.MAY.2019
29 MAY 2019 c 12.4 0.35 m3 water evaporated from Waste oil tank, 0.20 m3
retained
1/E Nguyen Ngoc Tuyen. 29.MAY.2019
31 MAY 2019 D 13 1.60 m3 bilge water from engine room bilge wellS
14 start 05:00 hrs stop 06:50 hrs
15.3 To bilge tank, retained in tank 3.10 m3
1/E Nguyen Ngoc Tuyen .31.MAY.2019
01 JUN 2019 c 12.2 0.30 m3 sludge transferred from F.O SLUDGE tank ,0.07 m3
retained
to BILGE oil tank,retained in tank 1.40 m3
1/E Nguyen Ngoc Tuyen .01.JUN.2019
01 JUN 2019 c 12.2 0.20 m3 sludge transferred from SCAV.BOX L.O DRAIN tank ,
0.05 m3 retained
to BILGE oil tank,retained in tank 1.60 m3
1/E Nguyen Ngoc Tuyen .01.JUN.2019
01 JUN 2019 c 12.2 0.40 m3 sludge transferred from BILGE OIL tank, 1.20 m3
retained
to WASTE OIL tank,retained in tank 0.55 m3
1/E Nguyen Ngoc Tuyen. 01 JUN 2019
02 JUN 2019 c 12.4 0.30 m3 water evaporated from Waste oil tank, 0.15 m3
retained
1/E Nguyen Ngoc Tuyen. 02.JUN.2019
02 JUN 2019 I Weekly Inventory of Bilge Tank
Capacity:9.36m3 / 3.10 m3 retained
1/E Nguyen Ngoc Tuyen. 02 JUN 2019
25 Sep 2019 H