GP MARITIME PRIVATE LIMITED

SHIPBOARD OPERATION VER NO. :1/ 15/07/2023 PAGE 1 of 1


MANUAL REV NO. :0/ 15/07/2023 SECTION – SOM -10.1 A
ERM WEEKLY ROUTINE PREPARED BY-DPA APPROVED BY- CEO

Vessel: Date:
Item Item Week 1 Week 2 Week 3 Week 4
No.
1 Drain M/E Pneumatic Air Bottle
2 Change and Clean M/E H.O. cold filters
3 Change 1 set of T/C filter with Cleaned
ones
4 Change piston cooling water tank filters
5 Change and Clean D/G fuel filters
6 Blow boiler gauge glasses
7 Check steering gear siphon box oil levels
8 Steering Gear, lubricate all linkage pivot
pts
9 Start fire & GP/ P Fr. Ballast con. Room
10 Test Foam making diesel engine
11 Test Emergency Fire Pump
12 Test Lifeboat engine
13 Test diesel driven air compressor
14 Test series/ parallel cocks for ease of
operation
15 Clean dirty gauzes on ventilation fans
16 A/C Unit flaps oil through holes and
Ex.Flaps
17 Backwash F.W. filters
18 Emergency Generator
19 Emergency Lighting

Note: This form to be filled and sent to office every month

--------------------
Chief Engineer