You are on page 1of 14

MBS SCHOOL OF PLANNING AND ARCHITECTURE

CASE
STUDY
PSRI HOSPITAL, NEW DELHI
{Pushpawati Singhania Hospital & Research Institute}

SUBMITTED BY-
ASHNA
VANSHIKA REDHU
ANIKET
KUNAL
LAKSHAY
PROJECT DETAILS SITE PLAN ACCESSIBILITY HUMIDITY
1 2 ● The hospital is NOT ● Most humid month - September
DELHI connected with main ● Average relative humidity - 63%
road but connected PRECIPITATION
to a service road.
● Average precipitation - 47.5 mm

SIT
● It is well connected
CLIMATIC CONDITION

E
INDIA to pedestrian and
vehicular movement. ● The climate of the area is Semi-Arid both summer and
SAKET CONNECTIVITY BETWEEN FIRE EXIT winter are severe.
BLOCK A AND BLOCK B
PROJECT NAME- PSRI Multi-specialty hospital ● Hottest month - June ( 33°C average )
3 ● Coldest month - January ( 14°C average )
LOCATION- Saket, New Delhi 2
ARCHITECT FIRM- Creative Designer Architects ● Maximum temperature - 40°C
ARCHITECTS- Mohanbir Singh, Maninder Kaur, 4 ● Minimum temperature - 8°C
Ravideep Singh, C. Kumar ● Average temperature - 26°C
9
BUILT- UP AREA- 60,960 sqm WIND SPEED
NO. OF BEDS- 300 beds SURFACE PARKING ● Average wind speed - 6 km/h
YEAR COMPLETED- BLOCK A-1996, BLOCK B-2017 1
7 5 4
FLOORS- BLOCK A-6, BLOCK B-6 3
ORIENTATION- South- West facing

8
BASEMENT ENTRY/ EXIT
5
6

N BASEMENT
ENTRY/ EXIT

CONNECTIVITY PARKING ENTRY OF VEGETATION


VEHICULAR PATH BLOCK B ● SOIL COMPOSITION - Sandy-loamy soil
NEARBY BUS STOP: PSRI Bus Stop ( 300 m ) ● FLORA - Neem trees
6 7
NEARBY METRO STN: Chirag Delhi Metro St.(2 Km) SWOT ANALYSIS
● Moderate connectivity with road and
NEARBY AIRPORT : IGI Airport Terminal 1 (18.9 Km)

NEARBY FIRE STN: Malviya Nagar Fire stn (3.6 Km) S metro station.
● Noise free area therefore suitable area for
hospital.

W
NEARBY POLICE STN:Police Stn Malviya Na(2.6Km) ● Common gate for entry of vehicles and
pedestrians.
SITE CONTEXT EMERGENCY DROP- OFF BLOCK- A DROP- OFF BLOCK- B
● Only one fire exits in both blocks.
1. NORTH: Venu Eye Institute & research centre 8 9

O
2. SOUTH: Comm -it career Academy ● DDA parking is very close.
3. EAST: College of Vocational Studies ● No open garbage disposal area near the
4. WEST: DDA Parking 3 site.
1 2

T
● Traffic jam due to narrow front lane.
● Common basement entry and exit in
ENTRANCE EXIT block-A and B
HOSPITAL ZONING FLOOR PLATE DIAGRAM CORE AND CIRCULATION

9% INDOOR PATIENT DEPARTMENT (IPD)


13%
35%
SERVICES
24%
19% OUT- PATIENT DEPARTMENT (OPD)
EMERGENCY
ADMIN
GROUND FLOOR PLAN

OPD Reception+waiting area Connecting Bridge A-Block Reporting Open to sky

BLOCK B BLOCK A

4 2 2 2 2 2 10 11
3 3 3 3 4 2 1 1 1
5
15 16 6 5
1 6 6 6
1 4 7
9 6
7 2 2 2 `2 2 8 2

19 19 19
19 1 1 1 1 1
8 12

9 1
10 1 13
17 18 12
14

BLOCK- B
1. PRE/POST ENDOSCOPE BEDS
ENTRY

N
2. CONS. ROOM
EXIT
3. ENDOSCOPY
4. ERCP (Endoscopic retrograde cholangiopancreatography) BLOCK- A
5. STAFF ROOM
6. CHANGE ROOM 1. CONS. ROOM
7. DOC. ROOM 2. M.R.I.
8. TREATMENT ROOM 3. C.T. SCAN
9. SAMPLE COLLECTION 4. X-RAY
10. EXECUTIVE HEALTH CHECKUP5. ULTRASOUND ROOM
11. ENT
12. TMT ECHO
6. LIFT
13. CAFETERIA 7. OPD WAITING HALL
14. OUTDOOR SEATING 8. INT. WAITING LOUNGE
15. DIRTY UTILITY 9. ADMINISTRATION AREA Emergency Ward
16. CLEAN UTILITY 10. FEMALE TOILET Waiting Area Reception+Admission Pharmacy
17. MALE TOILET 11. MALE TOILET desk
18. FEMALE TOILET
19. LIFT
12. EMERGENCY
FIRST FLOOR PLAN
HORIZONTAL CIRCULATION

VERTICAL CIRCULATION Double Height Reception


Connecting Bridge Conference Hall

1 14
2 3 15
3
6
3
5 5 5 4 4 4
7
4 15
5 16
9 9 8 5 10

5 10 13
10 12
16 11 19
5 5 5 8 17 18

BLOCK A
1. KITCHEN & COLD STORE
2. LIBRARY
3. OFFICE
BLOCK B 4. LIFT

N
5. CONS. ROOM
6. STORE
7. STAFF ROOM
8. AHU
9. DIETICIAN
10. WAITING AREA
11. O.P.D
12. MALE TOILET
13. FEMALE TOILET
14. IT DEPARTMENT
15. MARKETING
Critical Care Unit Cath Lab 16. CONFERENCE ROOM
17. C.O.O.
18. DIRECTOR OFFICE
19. DR. ROOM
SECOND FLOOR PLAN
HORIZONTAL CIRCULATION

VERTICAL CIRCULATION
Operation Theatre Medical Intensive care unit Surgical ICU Lift Lobby

3 5
18 1
2 4 2

6 7 8
10 11 14 15 16
8
12 7 13
9 10 10 6
17

19 17 17 17 17

BLOCK A
1. NURSES CHANNEL
2. OPERATION THEATRE

N
BLOCK B 3. SCRUB
4. SEPTIC OT
5. STERILIZATION
6. DIRTY UTILITY
7. CLEAN UTILITY’
8. NURSE ROOM
9. ICU WAITING
10. TOILET
11. PATIENT HOLD & RECOVERY
12. PROCESSING ROOM
13. DR. ROOM
14. ANAESTHESIA
15. OT STORE
16. STAFF ROOM Dialysis Negative Hall
17. DIALYSIS
Liver Transplant ICU
18. MICU
Pre/Post OT
19. BLOOD BANK
THIRD FLOOR PLAN
( Service Floor )

HORIZONTAL CIRCULATION

VERTICAL CIRCULATION
AIR HANDLING UNIT SHAFTS

SHAFTS

Medical Record Department

BLOCK A

N
The In-patient floors are on the top, sandwiched by a service floor in between the OT and IPD floor, making
the augmentation of services much easier such as housing the AHU’s of the OT’s and the dispersion of the
REVERSE OSMOSIS
plumbing and medical shafts of the IPD floors. PLANT
FOURTH FLOOR PLAN
( IN PATIENT WARD)

HORIZONTAL CIRCULATION

VERTICAL CIRCULATION NURSE STATION THREE BEDDED WARDS

4 1 1 1 4
3 5
2 2

1 1

1 14 10 8 6
21 12 7 22 21 1

13
8 10

1 1 1 1 1 1 1 1 1 1
BLOCK A

N
1. DOUBLE ROOM BLOCK B
2. SUITE ROOM
3. ATTENDENT AREA
4. DELUXE ROOM
5. SITTING AREA
6. TREATMENT ROOM
7. MEDICINE STORE
8. NURSE STATION
9. NURSE
10. ROOM
11. NURSE OFFICE
12. EQUIP STORE 21. DIRTY UTILITY
13. DOC. DUTY ROOM 22. CLEAN UTILITY SINGLE BED WARD
DELUXE ROOM/
14. PANTRY TWO BEDDED WARD
SINGLE ROOM
15. LINEN STORE
FIFTH FLOOR PLAN
( IN PATIENT WARD )

HORIZONTAL CIRCULATION

VERTICAL CIRCULATION NURSE STATION NURSE STATION

3 4
1 4 5
2 2

1 1
14 10 8 6
21 12 7 22 21

13
8 10

1 1 1 1
1
BLOCK A

N
1. SINGLE ROOM
BLOCK B
2. SUITE ROOM
3. ATTENDENT AREA
4. DELUXE ROOM
5. SITTING AREA
6. TREATMENT ROOM
7. MEDICINE STORE
8. NURSE STATION
9. NURSE
10. ROOM
11. NURSE OFFICE
12. EQUIP STORE
13. DOC. DUTY ROOM SUITE ROOM DELUXE VIP ROOM
14. PANTRY
15. LINEN STORE
ELEVATIONS

2 4
2

SIDE ELEVATION

FRONT ELEVATION
Y
SECTIONS
X X’

5 5 19 3 19 4
2 2

10 3 9 8 7 6 4 3 19 3 19 5 Y’
10
10 4 3 3 3 19 5
3 9 8 7 6
10 3
10 3 9 8 7 6 SERVICE FLOOR SERVICE FLOOR
4 3
10
10 SERVICE FLOOR 4 3
6 7 15 3 8
10
3 21 21 21 19 6 4 3
10 13 10 3
10
10 3 14 6 4 3
10 9 14 3
3 14 6 4 3
10
10
6 13 15 4 3 11 3 1 2 19191212
11
17 19 18
10 10

12 11 4 3 11
16 11 3 11
10
10
4 3
11 11 11 3 11
10

SECTION XX’ SECTION YY’

1. SHAFT 14. RELATIVE WAIT AREA 1. UNIFORM ISSUE ROOM 14. WAITING AREA
2. MUMTY 15. GRIEVING ROOM 2. FEMALE GDA 15. PASSAGEWAY
3. CORRIDOR 16. BIO MEDICAL SHOP 3. CORRIDOR 16. TOILET
4. LIFT LOBBY 17. IN PATIENT PHARMACY STORE 4. SINGLE ROOM
5. MACHINE ROOM 18. SECURITY OFFICE 5. DOUBLE ROOM
6. ELECTRICAL ROOM 19. TOILET 6. PRE POST BED
7. PASSAGE 20. LIFT WELL 7. ASSISTANT TOILET
8. STAFF TOILET 21. CHANGE ROOM 8. WAITING LOBBY
9. PANTRY 9. CONS. ROOM
10. STAIRS 10. D/U
11. PARKING 11. PARKING
12. GENERAL WASTE 12. CH/SH
13. MORTUARY 13. SURGICAL ICU
S.NO. SPACES (BLOCK B) AREA (SQ.M) S.NO. SPACES (BLOCK A) AREA (SQ.M)

BASEMENT
1 PARKING 1 PARKING
2 IPD BILLING
3 MORTUARY
GROUND FLOOR
1 HELP DESK 115 1 EMERGENCY 50
2 OPD CHAMBERS 350 2 RECEPTION 85
3 OPD BILLING 25 3 OPD AND OPD BILLING 370
4 EXECUTIVE HEALTH CHECK UP 45 4 SAMPLE COLLECTION 15
5 ENDOSCOPY 180 5 ADMISSION & HELP DESK 55
6 SAMPLE COLLECTION 10 6 INTERNATIONAL PATIENT DESK 60
7 CAFETERIA 80
FIRST FLOOR
1 CARDIAC OPD 120 1 ADMINISTRATIVE BLOCK 370
2 CATH LAB 100 2 OPD 150
3 CCU/SICU 520 3 PERSONNEL
4 DIRTY UTILITY ROOM 80 4 ACCOUNTS 20
SECOND FLOOR
1 OPERATION THEATRES 400 DIALYSIS 310
2 LIVER TRANSPLANT ICU 200 BLOOD CENTRE 60
3 PRE/POST OPERATIVE WARD 120 ICU 400
OPERATION THEATRE 200
THIRD FLOOR
1 SERVICES AHU ROOM
M.R.D 200
R.O. PLANT 100
FOURTH / FIFTH FLOOR
1 WARDS ON 4TH FLOOR 30 1 WARDS 75
2 WARDS ON 5TH FLOOR 60
SERVICES
The building is provided with—
● FIRE FIGHTING SYSTEM
● WATER SUPPLY DISTRIBUTION SYSTEM
● SOIL AND WASTE DISPOSAL SYSTEM
● ELECTRICITY SUPPLY AND DIESEL GENSETS
● RAIN WATER HARVESTING SYSTEM AND
● OXYGEN GENERATION PLANT
● PTS CONTROL ROOM
● REVERSE OSMOSIS PLANT
● FIRE STAIRCASE
● SIGN BOARDS
● DIRECTION ARROWS

INFERENCES

INFERENCES FOR CASE STUDY CASE STUDY [ PSRI HOSPITAL, NEW DELHI ]
CLIMATE EXTREME CLIMATE [ IT IS VERY HOT IN SUMMER (ARP - JUL ) AND COLD IN WINTER ( DEC - JAN )

BUILT-UP AREA 60960 SQM

NUMBER OF BEDS 300 BEDS- 150 IN EACH BLOCK

PASSAGE 2.4M WIDE

POSITIVE ASPECTS MODERATE CONNECTIVITY WITH MAIN ROAD AND METRO STATION
NOISE FREE AREA
SURROUNDED BY GREEN VEGETATIONS
SUITABLE PLACE FOR HOSPITAL

NEGATIVE ASPECTS COMMON GATE FOR ENTRY AND EXIT FOR VEHICLES AND PEDESTRIANS
THERE’S ONLY ONE FIRE EXIT IN BOTH BLOCKS
2.4M WIDE PASSAGE

FIRE EXITS ONE FIRE EXITS IN BLOCK-A


ONE FIRE EXIT IN BLOCK-B
THANK
YOU !!

You might also like