You are on page 1of 1

DEVIATIONS AND CLARIFICATIONS

Contract No, : 003/V00000/2019-SO Equipment Title : Electrical Distribution Board

Project : EPC of Lawe-Lawe Facilities RDMP RU-V Balikpapan Equipment No. :

MR no : 26076-110-TEA-EAA0-L0007 Vendor : LS Electric

No Doc. No. / Reference Original Requirement Vendor Clarification / Deviation Vendor Response / Justification Purchaser's Conclusion Final Conclusion

Vendor shall inform Manufacturer and Country of Origin:


1 General 1. Electrical Distribution Panel (Indoor, type 1) 1. Indoor type 1: LS electric ; 2. Outdoor type 2: Nanyang Zhongtong
2. Electrical Distribution Panel (Outdoor, type 2)

18 months after delivery, 12 months after installation and


2 General Vendor shall advise warranty period Comply
commissioning

Vendor shall inform location for:


1. Indonesia 1. Viet Nam
1. Project Managing
2. Indonesia 2. Viet Nam
2. Engineering
3 General 3. Indonesia 3. Viet Nam
3. Documentation
4. As per COO 4. Viet Nam
4. Manufacturing
5. Indonesia and Singapore 5. Viet Nam
5. Factory Acceptance Test (FAT)

Vendor shal quote:


1. Pre-commissioning, commissioning, and start up Spare Parts
4 General Comply
2. One Year Spare Parts
3. Special Tools

You might also like