1. The document lists 4 items with the original requirements from the contract, clarifications or deviations from the vendor, the vendor's response and justification, and the purchaser's conclusion on the clarification or deviation.
2. For item 1, the vendor informed the manufacturer and country of origin for the electrical distribution panels. For item 2, the vendor confirmed a 18 month warranty period after delivery and 12 months after installation and commissioning.
3. For item 3, the vendor clarified the locations for project management, engineering, documentation, manufacturing, and factory acceptance testing would be in Vietnam rather than Indonesia and Singapore as originally specified.
1. The document lists 4 items with the original requirements from the contract, clarifications or deviations from the vendor, the vendor's response and justification, and the purchaser's conclusion on the clarification or deviation.
2. For item 1, the vendor informed the manufacturer and country of origin for the electrical distribution panels. For item 2, the vendor confirmed a 18 month warranty period after delivery and 12 months after installation and commissioning.
3. For item 3, the vendor clarified the locations for project management, engineering, documentation, manufacturing, and factory acceptance testing would be in Vietnam rather than Indonesia and Singapore as originally specified.
1. The document lists 4 items with the original requirements from the contract, clarifications or deviations from the vendor, the vendor's response and justification, and the purchaser's conclusion on the clarification or deviation.
2. For item 1, the vendor informed the manufacturer and country of origin for the electrical distribution panels. For item 2, the vendor confirmed a 18 month warranty period after delivery and 12 months after installation and commissioning.
3. For item 3, the vendor clarified the locations for project management, engineering, documentation, manufacturing, and factory acceptance testing would be in Vietnam rather than Indonesia and Singapore as originally specified.
MR no : 26076-110-TEA-EAA0-L0007 Vendor : LS Electric
No Doc. No. / Reference Original Requirement Vendor Clarification / Deviation Vendor Response / Justification Purchaser's Conclusion Final Conclusion
Vendor shall inform Manufacturer and Country of Origin:
1 General 1. Electrical Distribution Panel (Indoor, type 1) 1. Indoor type 1: LS electric ; 2. Outdoor type 2: Nanyang Zhongtong 2. Electrical Distribution Panel (Outdoor, type 2)
18 months after delivery, 12 months after installation and
2 General Vendor shall advise warranty period Comply commissioning
Vendor shall inform location for:
1. Indonesia 1. Viet Nam 1. Project Managing 2. Indonesia 2. Viet Nam 2. Engineering 3 General 3. Indonesia 3. Viet Nam 3. Documentation 4. As per COO 4. Viet Nam 4. Manufacturing 5. Indonesia and Singapore 5. Viet Nam 5. Factory Acceptance Test (FAT)
Vendor shal quote:
1. Pre-commissioning, commissioning, and start up Spare Parts 4 General Comply 2. One Year Spare Parts 3. Special Tools