Current receiver tank capacity

Calculated
flow rate
Buildings based on
Heating peak
Model # Sq. Ft. EDR Flow (gpm) Tank size (gal) loads (lbs/h) demand
PCV-#17 VNS-604 60,000 90 110 12000 24
PCV-#3 VNS-504 50,000 75 65 11000 22
PCV-#7 VNS-504 50,000 75 65 11000 22
PCV-#11 VNS-604 60,000 90 110 10500 21
TOTAL PCV 330 89

Hub #25 VNS-804 80,000 120 110 12000 24


113

Maximum flow going to hub #15 450 gpm for a maximum of


Maximum volume of transfered condensate in one sequence 615 Gal

Volume Flow rate


204 260 637.3
302 150 552.0
492 260 925.3
712 340 1278.7
Ratio pump
flow rate vs Estimated Estimated
real flow Run time Off time
rate (min) (min)
3.8 1.6667 4.5833
3.4 1.2264 2.9545
3.4 1.2264 2.9545
4.3 1.5942 5.2381
3.7

5.0 1.1458 4.5833

pm for a maximum of 1.1458 min