Table of Contents

1. Intention of the Employer’s Requirements B01-1

2. Project Information B01-2


2.1 Project Description B01-2
2.1.1 Lot 1 - Substations B01-2
2.1.2 Lot 2 - Overhead Transmission Lines and Underground Cable
Sections B01-4
2.2 Location, Environmental Data, Site Access and Transportation B01-4
2.2.1 Location B01-5
2.2.2 Environmental and climatic data B01-7
2.2.3 Site accessibility and transportation B01-8

3. Project Participation B01-10


3.1 The Employer B01-10
3.2 The Engineer B01-10

4. Project Organization, Administration & Meetings B01-11


4.1 General B01-11
4.2 Correspondence and Document Submission B01-11
4.3 Meetings B01-11
4.3.1 Kick-off meeting B01-11
4.3.2 Progress meetings B01-11
4.3.3 Site meetings B01-12
4.3.4 Other meetings B01-12
4.4 Reporting B01-13
4.4.1 General B01-13
4.4.2 Monthly Progress Report B01-13
4.4.3 Special reports B01-14
4.4.4 Project Completion Report B01-15

5. Project Documentation B01-16


5.1 General B01-16
5.2 Document Schedule B01-16
5.3 Documents for Approval B01-17
5.4 Documents for Information B01-18

7416A01/FICHT-18190545-v1 B01-I