1.

Intention of the Employer’s Requirements


The intention of the Volume III, Employer’s Requirements is to set out the
minimum requirements according to which all works relevant to the Project
will be performed.

The following Sections of Volume III collectively form the Employer’s


Requirements:

• B01 Project Description and Procedures


• B02 General Technical Requirements
• B1 Scope of Supply and Services
• B2 Particular Technical Requirements
• B3 Particular Technical Requirements - Civil Works
• C Technical Data Sheets
• D Annexes

Without restricting anything else set forth elsewhere in the Contract, all
Work, equipment, material and services required to be provided by the
Contractor and the Contract shall be designed, constructed, and operated, at
a minimum, to meet the Employer’s Requirements and all applicable laws,
including applicable standards, guidelines, codes and regulations governing
any of the foregoing including, but not limited to, those standards
specifically listed in other sections of the Employer’s Requirements and the
Contract.

In the event of conflicts between the requirements of any portion of the


Contract and any of the standards listed, the more stringent requirement or
standard shall apply, unless otherwise agreed to in writing by the
Employer/Engineer.

7416A01/FICHT-18190545-v1 B01-1