You are on page 1of 9

LIENDAK SDN.

BHD

PROJECT JABIL P008


LIFTING PLAN
RAUGH
TERRAIN
CRANE TR-
250M

REFERENCE NO : IP/LDC/PLAN/008
REVISION : 008
DATE: 3/2/2023
TYPE OF LIFT : NON
COMPLEX
PROJECT JABIL P008 DATE 3/2/2023
LIFT LOCATION LAYDOWN CLIENT JABIL
DOC. REF ROUGH ISSUED BY R.THIRU
TERRAIN 016-6805377
CRANE LIFTING LIFTING
PLAN SUPERVISOR

DESCRIPTION OF LIFT:
1.

NAME WEIGHT (Ton)

(a) STEEL REBAR 1.0T


(b) STEEL FRAME 750KG
(c) WOODS 100KG
(d)
CHAIN SLING N/A
WEBBING SLING X2 40KGS
SHACKLES X 2 20KGS
SPREADER BAR N/A
MAIN BLOCK 260 KGS
AUXILIARRY BLOCK 70 KGS
FLY JIB 8.0MTRS
TOTAL WEIGHT 390 KGS
(e)
(f)
CHART CAPACITY AT RADIUS(REFER
TOLOAD CHART) 2000 KGS
WEIGHT OF OBJECT TO BE LIFTED 1000 KGS
RIGGING WEIGHT 390KGS
TOTAL LIFTING WEIGHT 1390 KGS
RADIUS 19.6 MTRS
SWL 2000 KGS
BOOM LENGTH 30.5 MTRS
OUT RIGGER 6.3M
FULLY
EXTENDED
SAFETY FACTOR (X < 75% 69 %
PERCENT OF CHART CAPACITY ( > 1.35%) 1.43 %
LIFTING ACCESSORIES USED

WEB SLING(S) LENGTH(S):8M CAPACITY(S):3.0T

NUMBER(S):2 SIZE(S):NA

PERSONEL

TITLE NAME TITLE NAME


CRANE TBC RIGGER TBC
COORDINATOR
CRANE M.DEEBAN RIGGER TBC
SUPERVISOR
CRANE TBC RIGGER TBC
OPERATOR
SIGN OFF

APPOINTED PERSON(S) ACCEPTANCE OF RESPONSIBILITIES’


I confirm that the lifts have been Signed : Date
planned and will be carried out in
accordance with current legislation
and that I accept responsibility for
the preparation of this lift Plan &
Method Statement

CRANE SUPERVISOR’S ACCEPTANCE OF DUTIES


I confirm that I have been fully Signed : Date
briefed on the contents of this Plan &
Method Statement and that I accept
the duties of ensuring that the lift (s)
will be carried out in accordance with
the method & procedure set out in
this document.

CLIENT SAFETY APPROVAL


Signed : Date
LIFTING SKETCH
BOOM LENGTH

30.5 MTRS

WEB SLING
3TX10MX2

LOAD 1.0 TON

RADIUS 19.6 MTRS

TR-250M