Date 29/03/2022
Batch No.:
Date of Mfg.: 04/2022 Date of Exp.: 03/2024
Line Clearance (Cleaning & Sanitization) Process Equipment and Surface Cleaning
OK CLEANED&
1 Cleaning & Sanitization of mixing tank 9am 9:30am
SANITIZED
OK CLEANED&
2 Cleaning & Sanitization of solution storage Tank 9:30am 9:45am
SANITIZED
4 All the material of previous batch should be removed from the Area OK REMOVED
OK CLEANED
5 Mfg. Area of should be clean and free from dust & dirt.
Ensure that all the material should be as per formulation and cleared from OK CHECKED
6
quality
Visual checking of line, conveyor belt, mixing tank/storage is clean & OK CHECKED
7
sanitize (Surface cleaning)
1
Product: Batch Size: Document No.
Mfg. Lic. No.: Rev. No.: 00 Effective Date 01/07/2017
Prepared By: Checked By: Approved By:
Sign.
Date 29/03/2022
Batch No.:
Date of Mfg.: 04/2022 Date of Exp.: 03/2024
10
11
12
13
14
15
16
Type of Fabric Fabric GSM Lot no.
2
Product: Batch Size: Document No.
Mfg. Lic. No.: Rev. No.: 00 Effective Date 01/07/2017
Prepared By: Checked By: Approved By:
Sign.
Date 29/03/2022
Batch No.:
Date of Mfg.: 04/2022 Date of Exp.: 03/2024
MANUFACTURING PROCESS
Verified by
Sr. Process Start Time End Time (Prod.
Supervisor)
2
3
4
6
7
9
10
3
Product: Batch Size: Document No.
Mfg. Lic. No.: Rev. No.: 00 Effective Date 01/07/2017
Prepared By: Checked By: Approved By:
Sign.
Date 29/03/2022
Batch No.:
Date of Mfg.: 04/2022 Date of Exp.: 03/2024
Cleaning & Sanitation carried out by (Name & signature)- Verified By-
Online PQRS
Details of Intended Product to be Filled:
Variant & SKU- Batch No-
Date –23/11/2022 Shift- 1
Defect Timing
Defect Description Remark
Category 10:30Am 11Am 12pm 1pm 2pm
DEVIATION FORM
Sr. Time Observation Corrective Action Preventive Action
4
Product: Batch Size: Document No.
Mfg. Lic. No.: Rev. No.: 00 Effective Date 01/07/2017
Prepared By: Checked By: Approved By:
Sign.
Date 29/03/2022
Batch No.:
Date of Mfg.: 04/2022 Date of Exp.: 03/2024
Finished Product
Date &Shift: Batch Number: Sample Size:
5
Product: Batch Size: Document No.
Mfg. Lic. No.: Rev. No.: 00 Effective Date 01/07/2017
Prepared By: Checked By: Approved By:
Sign.
Date 29/03/2022
Batch No.:
Date of Mfg.: 04/2022 Date of Exp.: 03/2024
10
11
12
13
6
Product: Batch Size: Document No.
Mfg. Lic. No.: Rev. No.: 00 Effective Date 01/07/2017
Prepared By: Checked By: Approved By:
Sign.
Date 29/03/2022
Batch No.:
Date of Mfg.: 04/2022 Date of Exp.: 03/2024
Note: Average weight should not be less than the target weight
Sampling Scheme: To check the sample (CLDs) randomly √ n+1 of lot size.
AQL for -Critical - Accepted -0 & Rejected - 1, Major- Accepted -2 & Rejected - 1, Minor- Accepted - 3 & Rejected - 1
Rejected Quantity
Total Quantity (CLD) Accepted Quantity (CLD) Hold Quantity (CLD) Remark
(CLD)